Transportation system
US-9511959-B2 · Dec 6, 2016 · US
US11952023B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11952023-B2 |
| Application number | US-202017596076-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 19, 2020 |
| Priority date | Feb 18, 2020 |
| Publication date | Apr 9, 2024 |
| Grant date | Apr 9, 2024 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for route handling of a regional centralized control station is based on a CTC3.0 technology, and includes the following steps: step (1): generating multi-station train and shunting plans according to a multi-station planning terminal, and executing steps (2) and (4) at the same time; step (2): sending the train plan to an autonomous computer to generate a train route sequence, and executing step (3); step (3): sending, by the autonomous computer, the train route sequence to a regional centralized control route handling terminal; step (4): compiling, by the multi-station planning terminal, an automatically generated shunting route sequence in the shunting plan, and executing step (5); and step (5): synchronizing, by a center service, the shunting route sequence to the regional centralized control route handling terminal.
Opening claim text (preview).
The invention claimed is: 1. A CTC3.0-based implementation method for route handling of a regional centralized control station, the method being based on a CTC3.0 technology, and comprising the following steps: step (1): generating a multi-station train plan and a multi-station shunting plan according to a multi-station planning terminal, and executing steps (2) and (4) at the same time; step (2): sending the train plan to an autonomous computer to generate a train route sequence, and executing step (3); step (3): sending, by the autonomous computer, the train route sequence to a regional centralized control route handling terminal; step (4): compiling, by the multi-station planning terminal, an automatically generated shunting route sequence in the shunting plan, and executing step (5); and step (5): synchronizing, by a center service, the shunting route sequence to the regional centralized control route handling terminal, wherein the train route sequence and the shunting sequence are generated at the same time and handled by the same regional centralized control route handling terminal to be displayed in a same interface of the same regional centralized control route handling terminal, wherein a specific process of displaying, by the same interface of the same regional centralized control route handling terminal, the train route sequence is as follows: 1) according to the multi-station train plan, automatically calculating, by the autonomous computer, the train route to generate the train route sequence; 2) sending, by the autonomous computer, the train route sequence to the regional centralized control route handling terminal after the train route sequence changes according to a record of the regional centralized control route handling terminal; and 3) displaying, by the regional centralized control route handling terminal, the train route sequence, and wherein a specific process of displaying, by the same interface of the same regional centralized control route handling terminal, the shunting route sequence is as follows: 1) compiling or receiving, by the multi-station planning terminal, the shunting plan; 2) automatically calculating, by the multi-station planning terminal, the shunting route sequence according to the compiled shunting plan; 3) releasing, by the multi-station planning terminal, the shunting plan to the regional centralized control route handling terminal; and 4) displaying, by the regional centralized control route handling terminal, the shunting route sequence. 2. The CTC3.0-based implementation method for route handling of the regional centralized control station according to claim 1 , wherein the train route sequence is displayed at an upper side of the interface of the regional centralized control route handling terminal. 3. The CTC3.0-based implementation method for route handling of the regional centralized control station according to claim 1 , wherein the shunting route sequence is displayed at a lower side of the interface of the regional centralized control route handling terminal. 4. The CTC3.0-based implementation method for route handling of the regional centralized control station according to claim 1 , wherein a state of the regional centralized control route handling terminal to handle the train route sequence and the shunting_route sequence is automatically judged by a system, a prompt is sent to a signaler, and finally, a confirmation is made by the signaler. 5. The CTC3.0-based implementation method for route handling of the regional centralized control station according to claim 1 , wherein the multi-station train and shunting plans are subjected to a safety inspection by the autonomous computer at a background, and an unsafe route failed to pass the inspection is unable to handle. 6. The CTC3.0-based implementation method for route handling of the regional centralized control station according to claim 5 , wherein the safety inspection comprises an equipment lockout inspection, a diverging failure inspection, an electricity area inspection, a route conflict inspection and a separating equipment presence or absence inspection.
Automatic systems, e.g. controlled by train; Change-over to manual control · CPC title
Switching systems for classification yards · CPC title
Details, e.g. indicating degree of track filling · CPC title
Control, warning or like safety means along the route or between vehicles or trains · CPC title
using European Train Control System [ETCS] · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.