Railway track geometry defect modeling for predicting deterioration, derailment risk, and optimal repair

US9744978B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9744978-B2
Application numberUS-201313906883-A
CountryUS
Kind codeB2
Filing dateMay 31, 2013
Priority dateJan 11, 2013
Publication dateAug 29, 2017
Grant dateAug 29, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Geo-defect repair modeling is provided. A method includes logically dividing a railroad network according to spatial and temporal dimensions with respect to historical data collected. The spatial dimensions include line segments of a specified length and the temporal dimensions include inspection run data for inspections performed for each of the line segments over a period of time. The method also includes creating a track deterioration model from the historical data, identifying geo-defects occurring at each inspection run from the track deterioration model, calculating a track deterioration condition from the track deterioration model by analyzing quantified changes in the geo-defects measured at each inspection run, and calculating a derailment risk based on track conditions determined from the inspection run data and the track deterioration condition. The method further includes determining a repair decision for each of the geo-defects based on the derailment risk and costs associated with previous comparable repairs.

First claim

Opening claim text (preview).

What is claimed is: 1. A system, comprising: a computer processor; a storage device communicatively coupled to the computer processor, the storage device storing historical data collected for a railroad network; and an application executable by the computer processor, the application configured to implement a method, the method comprising: logically dividing the railroad network according to spatial and temporal dimensions with respect to the historical data collected for the railroad network, the spatial dimensions including line segments of a specified length and the temporal dimensions including inspection run data for inspections performed for each of the line segments over a specified period of time; creating a track deterioration model from the historical data and corresponding spatial and temporal dimensions, current track conditions, and traffic data; identifying geo-defects occurring at each inspection run from the track deterioration model, the geo-defects identified from data sets of the historical data according to the spatial and temporal dimensions; calculating a track deterioration condition from the track deterioration model, the track deterioration condition calculated by analyzing quantified changes in the geo-defects measured at each inspection run; calculating a derailment risk based on track conditions determined from the inspection run data and from the track deterioration condition; and determining a repair decision for each of the geo-defects based on the derailment risk and historically determined costs associated with previous comparable repairs. 2. The system of claim 1 , wherein the railroad network is further divided into sections of two miles in length, and the calculating the derailment risk includes: spatially aggregating the geo-defects at a section level; temporally aggregating the geo-defects into each inspection level; and creating a record from results of the spatially aggregating and the temporally aggregating.

Assignees

Inventors

Classifications

  • Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30) · CPC title

  • Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling · CPC title

  • B61K9/08Primary

    Measuring installations for surveying permanent way · CPC title

  • Track changes detection · CPC title

  • Risk analysis of enterprise or organisation activities · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9744978B2 cover?
Geo-defect repair modeling is provided. A method includes logically dividing a railroad network according to spatial and temporal dimensions with respect to historical data collected. The spatial dimensions include line segments of a specified length and the temporal dimensions include inspection run data for inspections performed for each of the line segments over a period of time. The method …
Who is the assignee on this patent?
IBM
What technology area does this patent fall under?
Primary CPC classification B61K9/08. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Aug 29 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).