Exhaust heat recovery device
US-2015354438-A1 · Dec 10, 2015 · US
US9695726B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9695726-B2 |
| Application number | US-201113994177-A |
| Country | US |
| Kind code | B2 |
| Filing date | Dec 1, 2011 |
| Priority date | Dec 17, 2010 |
| Publication date | Jul 4, 2017 |
| Grant date | Jul 4, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method and arrangement for controlling heating and thawing of a metering arrangement with a metering device for the feeding of a reducing agent solution for the exhaust gas after treatment in an exhaust system. The metering device is connected with a supply container for the reducing agent solution via at least one pipe. At least one heating device is provided for the heating of at least one component of the metering arrangement. At least one first component of the metering arrangement is assigned a first heating device, which can be operated separately from a second heating device provided for the heating of at least a second component of the metering arrangement.
Opening claim text (preview).
The invention claimed is: 1. A method for the operation of a metering arrangement, which comprises a meter for feeding a reducing agent solution for exhaust gas after treatment in an exhaust system of a vehicle, wherein the meter is connected by at least one pipe with a supply container containing the reducing agent solution, the method comprising: separately controlling a first heater and a second heater, wherein the first heater heats the meter and the second heater heats pipe sections directly connected to the meter, and freezing the reducing agent solution in the meter at a point in time before freezing of the reducing agent solution in the pipe sections directly connected to the meter by operating the first and second heaters in sequence with respect to each other. 2. The method according to claim 1 , wherein the first and second heaters are arranged and operated such that a point in time of thawing of the reducing agent solution in the meter is established in relation to a point in time of thawing of the reducing agent solution in the pipe sections. 3. The method according to claim 2 , wherein the heaters are operated such that an intake pipe leading to the meter or of a return pipe leading from the meter to the supply container is cooled to a temperature below the freezing point before the cooling of the supply container to the temperature below the freezing point, or the intake pipe or the return pipe is heated to the freezing point after the heating of the supply container to the freezing point. 4. The method according to claim 1 , wherein the heaters are operated such that an inlet pipe leading to the meter or a return pipe leading from the meter to the supply container is cooled to a temperature below the freezing point before cooling of the supply container to the temperature below the freezing point, or the inlet pipe or the return pipe is heated to the freezing point after the heating of the supply container to the freezing point. 5. The method according to claim 1 , wherein the first heater or the second heater is operated in a reheating operation subsequent to a switch-off of an internal combustion engine of the vehicle if an outside temperature is below a predetermined threshold temperature. 6. The method according to claim 5 , wherein the first heater is operated in such a way in a reheating operation that the first heater is active for a settable time span directly following the switch-off of the internal combustion engine. 7. The method according to claim 6 , wherein when switched to an active state the first heater is operated on a timed basis with alternating On and Off phases. 8. The method according to claim 5 , wherein when switched to an active state, the first heater is operated on a timed basis with alternating On and Off phases. 9. A method for the operation of a metering arrangement, which comprises a meter for feeding a reducing agent solution for exhaust gas after treatment in an exhaust system of a vehicle, wherein the meter is connected by at least one pipe with a supply container containing the reducing agent solution, the method comprising: separately controlling a first heater and a second heater, wherein the first heater heats the meter and the second heater heats pipe sections directly connected to the meter, wherein the first and second heaters are operated in sequence with respect to each other such that as a result of the in sequence operation of the first and second heaters the reducing agent solution in the meter freezes at a point in time before freezing of the reducing agent solution in the pipe sections directly connected to the meter, wherein the first and second heaters are arranged and operated such that a point in time of thawing of the reducing agent solution in the meter is established in relation to a point in time of thawing of the reducing agent solution in the pipe sections, wherein, during a thawing operation, at least a part of the pipe sections is brought from a temperature below a freezing point of the reducing agent solution to a temperature of the freezing point of the reducing agent solution at a point in time before this is achieved by the reducing agent solution in the meter. 10. A method for the operation of a metering arrangement, which comprises a meter for feeding a reducing agent solution for exhaust gas after treatment in an exhaust system of a vehicle, wherein the meter is connected by at least one pipe with a supply container containing the reducing agent solution, the method comprising: separately controlling a first heater and a second heater, wherein the first heater heats a pump for pressurization of the meter and the second heater heats pipe sections directly connected to the pump, and freezing the reducing agent solution in the pump at a point in time before freezing of the reducing agent solution in the pipe sections directly connected to the pump by operating the first and second heaters in sequence with respect to each other. 11. The method according to claim 10 , wherein the first and second heaters are arranged and operated such that a point in time of thawing of the reducing agent solution in the pump is established in relation to a point in time of thawing of the reducing agent solution in the pipe sections. 12. A method for the operation of a metering arrangement, which comprises a metering device for feeding a reducing agent solution for exhaust gas after treatment in an exhaust system of a vehicle, wherein the metering device is connected by at least one pipe with a supply container containing the reducing agent solution, the method comprising: separately controlling a first heating device and a second heating device, wherein the first heating device heats a first component of the metering arrangement and the second heating device heats a second component of the metering arrangement, and establishing a point in time of freezing of the first component or of a part of the first component in relation to a point in time of freezing of the second component or of a part of the second component by operating the first and second heaters in sequence with respect to each other, wherein the first heating device or the second heating device are operated in a reheating operation subsequent to a switch-off of an internal combustion engine of the vehicle if an outside temperature is below a predetermined threshold temperature, wherein the first heating device is switched active for a second settable period of time after a first settable period of time of an inactive state directly following the switching-off of the internal combustion engine. 13. A method for the operation of a metering arrangement, which comprises a meter for feeding a reducing agent solution for exhaust gas after treatment in an exhaust system of a vehicle, wherein the meter is connected by at least one pipe with a supply container containing the reducing agent solution, the method comprising: separately controlling a first heater and a second heater, wherein the first heater heats a pump for pressurization of the meter and the second heater heats pipe sections directly connected to the pump, wherein the first and second heaters are operated in sequence with respect to each other such that as a result of the in sequence operation of the first and second heaters reducing agent solution in the pump freezes at a point in time before freezing of the reducing agent solution in the pipe sections connected to the pump, wherein the first and second heaters are arranged and operated such that a point in time of thawing of the reducing agent solution in the pump is established in relation to a point in time of thawin
the devices using heat · CPC title
Control of selective catalytic reduction [SCR], e.g. by adjusting the dosing of reducing agent · CPC title
Processes · CPC title
the substance being heated, e.g. by heating tank or supply line of the added substance · CPC title
the means being a temperature sensor · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.