Determining status of electric power transmission lines in an electric power transmission system

US9568516B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9568516-B2
Application numberUS-201414493631-A
CountryUS
Kind codeB2
Filing dateSep 23, 2014
Priority dateSep 23, 2014
Publication dateFeb 14, 2017
Grant dateFeb 14, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The present application discloses systems and methods to determine loss of at least one electric power transmission line in an electric power transmission system. In various embodiments, a system consistent with the present disclosure may include an electrical parameter monitoring subsystem configured to receive electrical parameter measurements and to determine a change of the electrical measurements. An analysis subsystem may determine whether a change in the electrical measurements is indicative of loss of at least one transmission line and may calculate a number of transmission lines lost based on the change. In some embodiments, a remedial action subsystem may be configured to implement a remedial action in response to loss of at least one transmission line. The number of transmission lines lost may be determined based on an angle difference ratio and a power ratio between two buses in electrical transmission system.

First claim

Opening claim text (preview).

What is claimed: 1. A system configured to determine loss of at least one electric power transmission line in an electric power transmission system, the system comprising: an electrical parameter monitoring subsystem configured to: receive a first plurality of electrical parameter measurements taken at a first location over a period of time; receive a second plurality of electrical parameter measurements taken at a second location over the period of time; and determine a change in the first plurality of electrical measurements and the second plurality of electrical measurements over the period of time; an analysis subsystem configured to: determine that the change is indicative of loss of at least one transmission line; calculate an angle difference ratio; calculate a power ratio; and calculate a number of transmission lines lost by calculating a product of the angle difference ratio and the power ratio; and a remedial action subsystem configured to implement a remedial action in response to loss of at least one transmission line, the remedial action comprising one of reconfiguring the electric power transmission system to re-routing electric power around the at least one transmission line and selectively disconnecting a load. 2. The system of claim 1 , wherein the analysis subsystem is further configured to: identify an initial increase in at least one of the first plurality of electrical parameter measurements and the second plurality of electrical parameter measurements; and identify a continuing increase following the initial increase at a reduced rate of change to determine that the change is indicative of loss of at least one transmission line. 3. The system of claim 1 , wherein the analysis subsystem is configured to determine that the change is indicative of loss of at least one transmission line without reference to a static threshold. 4. The system of claim 1 , wherein the electrical parameter monitoring subsystem is further configured to: measure a first current flowing in a first transmission line; measure a second current flowing in a second transmission line with an impedance that is approximately equal to an impedance of the first transmission line; and identify a change in a ratio of the first current to the second current. 5. The system of claim 4 , wherein the analysis subsystem is further configured to initiate a second remedial action based on loss of communication with the second location and based on the change in the ratio of the first current to the second current. 6. The system of claim 1 , further comprising a communication interface configured to receive at least one of the first plurality of electrical parameter measurements and the second plurality of electrical parameter measurements. 7. The system of claim 1 , further comprising a sensor component configured to measure at least one of the first plurality of electrical parameter measurements and the second plurality of electrical parameter measurements. 8. The system of claim 7 , further comprising a time input configured to receive a time signal and wherein each of the plurality of electric parameter measurements made by the sensor component is associated with a time-stamp. 9. The system of claim 1 , wherein the first location and the second location remain in electrical communication after the loss of the at least one transmission line. 10. A method of determining loss of at least one electric power transmission line in an electric power transmission system, the method comprising: receiving a first plurality of electrical parameter measurements taken at a first location over a period of time; receiving a second plurality of electrical parameter measurements taken at a second location over the period of time; determining a change in the first plurality of electrical measurements and the second plurality of electrical measurements over the period of time; determining that the change is indicative of loss of at least one transmission line; calculating an angle difference ratio; calculating a power ratio; calculating a number of transmission lines lost by calculating a product of the angle difference ratio and the power ratio; declaring an open line condition; and initiating a first remedial action, the first remedial action comprising one of reconfiguring the electric power transmission system to re-routing electric power around the at least one transmission line and selectively disconnecting a load. 11. The method of claim 10 , wherein determining that the change is indicative of loss of at least one transmission line comprises: identifying an initial increase in at least one of the first plurality of electrical parameter measurements and the second plurality of electrical parameter measurements; identifying a continuing increase following the initial increase at a reduced rate of change. 12. The method of claim 10 , further comprising: identifying a specific transmission line lost by analyzing the first plurality of electrical parameter measurements, the second plurality of electrical parameter measurements, and the topography of the electric power transmission system. 13. The method of claim 10 , wherein determining that the change is indicative of loss of at least one transmission line is performed without reference to a static threshold. 14. The method of claim 10 , wherein determining that the change is indicative of loss of at least one transmission line comprises: measuring a first current flowing in a first transmission line; measuring a second current flowing in a second transmission line having an impedance that is approximately equal to an impedance of the first transmission line; and identifying a change in a ratio of the first current to the second current. 15. The method of claim 14 , further comprising: losing communication with the second location; initiating a second remedial action based on the change in the ratio of the first current to the second current.

Assignees

Inventors

Classifications

  • specially adapted for protection systems · CPC title

  • characterised by the transmission of data to equipment in the power network · CPC title

  • Monitoring network conditions, e.g. electrical magnitudes or operational status · CPC title

  • Testing for short-circuits, leakage current or ground faults · CPC title

  • Testing of lines, cables or conductors (testing of electric windings G01R31/72) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9568516B2 cover?
The present application discloses systems and methods to determine loss of at least one electric power transmission line in an electric power transmission system. In various embodiments, a system consistent with the present disclosure may include an electrical parameter monitoring subsystem configured to receive electrical parameter measurements and to determine a change of the electrical measu…
Who is the assignee on this patent?
Schweitzer Engineering Lab Inc
What technology area does this patent fall under?
Primary CPC classification H02H3/253. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Feb 14 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).