Fuel cell system and operation method thereof

US9553322B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9553322-B2
Application numberUS-201214009105-A
CountryUS
Kind codeB2
Filing dateJan 27, 2012
Priority dateMar 30, 2011
Publication dateJan 24, 2017
Grant dateJan 24, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A fuel cell system includes a fuel processor; a fuel cell stack; a first water tank; a combustor; a water discharge passage connected to a water drain port formed in the first water tank to discharge the water from inside of the first water tank; a water filling detector configured to detect that at least one of the water drain port and the water discharge passage is filled with water; a water supply unit for supplying the water to the first water tank; and a controller configured to execute a water filling step of supplying the water to the first water, supply the combustible gas to the combustor via the first water tank and cause the combustor to combust the combustible gas, when the water filling detector detects that at least one of the water drain port and the water discharge passage is filled with water.

First claim

Opening claim text (preview).

The invention claimed is: 1. A fuel cell system comprising: a fuel processor for generating a fuel gas through a reforming reaction between a raw material gas and water; a fuel cell stack for generating electric power using the fuel gas generated in the fuel processor and an oxidizing gas; a first water tank for storing water used in at least a reforming reaction in the fuel processor; a combustor for combusting a combustible gas supplied via the first water tank to heat the fuel processor; a water discharge passage connected to a water drain port formed in the first water tank to discharge the water from inside of the first water tank to outside; a water filling detector configured to detect that at least one of the water drain port and the water discharge passage is filled with the water to prevent a gas from leaking to outside through the water drain port; a water supply unit for supplying the water to the first water tank; and a controller configured to, before power generation is performed in the fuel cell stack, in a case where an operation is started in a state in which the water inside the first water tank is deficient, execute a water filling step of supplying the water to the first water tank by activating the water supply unit, and supply the combustible gas to the combustor via the first water tank and cause the combustor to combust the combustible gas, while supplying the water to the first water tank, and continue to supply the water to the first water tank until filling of the water is finished, when the water filling detector detects that at least one of the water drain port and the water discharge passage is filled with water to prevent the gas from leaking to outside through the water drain port, in the middle of the water filling step. 2. The fuel cell system according to claim 1 , wherein the controller stops the water supply unit when the water filling detector does not detect that at least one of the water drain port and the water discharge passage is filled with the water, after the water supply unit is activated for first predetermined time. 3. The fuel cell system according to claim 1 , wherein the water filling detector is at least one of a water level detector for detecting a water level inside of the first water tank, a flow detector for detecting a flow rate of the water supplied to the first water tank, and a water pressure detector for detecting a water pressure inside of the first water tank. 4. The fuel cell system according to claim 1 , wherein the water filling detector is a water level detector for detecting a water level inside of the first water tank; and wherein the controller determines that at least one of the water drain port and the water discharge passage is filled with the water, when the water level detector detects a first predetermined water level. 5. The fuel cell system according to claim 1 , further comprising: a first valve provided in the water discharge passage; wherein the controller supplies the combustible gas to the combustor via the first water tank and causes the combustor to combust the combustible gas, when the water filling detector detects that a portion of the water discharge passage which is upstream of the first valve, is filled with the water, in a state in which the first valve is closed. 6. The fuel cell system according to claim 1 , wherein the first water tank is configured to store a moisture in an off-fuel-gas which is a fuel gas discharged from the fuel cell stack, as the water used in at least the reforming reaction; and wherein the combustor is configured to combust the off-fuel-gas from which the moisture has been removed. 7. The fuel cell system according to claim 1 , wherein the controller causes the fuel cell stack to start power generation after the water filling step is completed. 8. The fuel cell system according to claim 1 , further comprising: a raw material gas supply unit for supplying a raw material gas to the fuel processor; and an off-gas passage used to supply a gas discharged from the fuel cell stack to the combustor; wherein the first water tank is provided on a portion of the off-gas passage; and wherein the controller causes the raw material gas supply unit to be activated to supply the raw material gas to the combustor via the first water tank, when the water filling detector detects that at least one of the water drain port and the water discharge passage is filled with water. 9. The fuel cell system according to claim 1 , wherein the water supply unit is configured to supply the water to the first water tank via a second water tank provided upstream of the first water tank. 10. The fuel cell system according to claim 1 , further comprising: an electric heater disposed on an outer periphery of the fuel processor to heat the fuel processor; wherein the combustor is disposed inward relative to a reforming catalyst provided in the fuel processor; and wherein the controller causes electric power to be supplied to the electric heater when supplying of the water to the first water tank starts and before the combustor performs combustion. 11. The fuel cell system according to claim 1 , further comprising: a reforming water supply passage connecting the fuel processor to the first water tank; wherein a connecting port at which the reforming water supply passage is connected to the water tank is positioned above the water drain port. 12. A method of operating a fuel cell system including: a fuel processor for generating a fuel gas through a reforming reaction between a raw material gas and water; a fuel cell stack for generating electric power using the fuel gas generated in the fuel processor and an oxidizing gas; a first water tank for storing water used in at least a reforming reaction in the fuel processor; and a combustor for combusting a combustible gas supplied via the first water tank to heat the fuel processor; the fuel cell system further including: a water discharge passage connected to a water drain port formed in the first water tank to discharge the water from inside of the first water tank to outside; a water supply unit for supplying the water to the first water tank; and a water filling detector configured to detect that at least one of the water drain port and the water discharge passage is filled with water to prevent a gas from leaking to outside through the water drain port; the method comprising: before power generation is performed in the fuel cell stack, in a case where an operation is started in a state in which the water inside the first water tank is deficient, executing a water filling step of supplying the water to the first water tank by activating the water supply unit, and supplying the combustible gas to the combustor via the first water tank to cause the combustor to combust the combustible gas, while supplying the water to the first water tank, and continuing to supply the water to the first water tank until filling of the water is finished, when the water filling detector detects that at least one of the water drain port and the water discharge passage is filled with the water, to prevent the gas from leaking to outside through the water drain port, in the middle of the water filling step.

Assignees

Inventors

Classifications

  • Fuel cells · CPC title

  • H01M8/0606Primary

    with means for production of gaseous reactants · CPC title

  • by condensers, gas-liquid separators or filters · CPC title

  • Shut-off or shut-down of fuel cells · CPC title

  • Heating by combustion · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9553322B2 cover?
A fuel cell system includes a fuel processor; a fuel cell stack; a first water tank; a combustor; a water discharge passage connected to a water drain port formed in the first water tank to discharge the water from inside of the first water tank; a water filling detector configured to detect that at least one of the water drain port and the water discharge passage is filled with water; a water …
Who is the assignee on this patent?
Takahashi Manabu, Katou Motomichi, Panasonic Ip Man Co Ltd
What technology area does this patent fall under?
Primary CPC classification H01M8/0606. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Jan 24 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).