Method for recovering lithium precursor from lithium secondary battery
US-2024396111-A1 · Nov 28, 2024 · US
US2026043110A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2026043110-A1 |
| Application number | US-202319100845-A |
| Country | US |
| Kind code | A1 |
| Filing date | Jul 24, 2023 |
| Priority date | Sep 1, 2022 |
| Publication date | Feb 12, 2026 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A process, for the selective heavy metal removal from iron- and/or steelmaking flue dust, including steps of: preparing a feedstock (FS) by blending or mixing a chloride precursor material (CPM) and ironmaking and/or steelmaking flue dust including heavy metals (ISFD), the heavy metals including Pb and Zn and optionally Cd; in a first reaction step in a first reactor reacting the CPM with the ISFD by thermal treatment of the FS at a temperature in a range of 700° C. to 950° C. removing at least 70 wt. % of Pb from the ISFD; in a subsequent second reaction step in a second reactor further reacting the CPM with the ISFD by thermal treatment of the feedstock FS at a temperature in a range of 850° C. to 1200° C.; and obtaining a solid material after the second reaction step. The invention also relates to a plant implementing the process.
Opening claim text (preview).
1 . A process for the selective heavy metal removal from iron- and/or steelmaking flue dust (ISFD), the process comprising the steps of: preparing a feedstock (FS) by blending or mixing a chloride precursor material (CPM) and ironmaking and/or steelmaking flue dust comprising heavy metals (ISFD), the heavy metals being at least Pb and Zn and optionally also Cd; in a first reaction step in a first reactor reacting the CPM with the ISFD by thermal treatment of the FS at a temperature in a range of 700° C. to 950° C. removing at least 70 wt. % of Pb from the ISFD by chlorination and evaporation of the Pb and removing it from the first reactor via the off-gas formed; in a subsequent second reaction step in a second reactor further reacting the CPM with the ISFD by thermal treatment of the feedstock FS at a temperature in a range of 850° C. to 1200° C. removing the Zn from the ISFD by chlorination and evaporation of the Zn and removing it from the second reactor via the off-gas formed; and obtaining and removing a secondary solid material after the second reaction step from the second reactor. 2 . The process according to claim 1 , wherein during the first reaction step at least 70% of the Pb is removed from the ISFD by evaporating PbCl 2 at temperatures from 700° C. to 950° C. 3 . The process according to claim 1 , wherein during the first reaction step at least 80 wt. % of the Pb is removed from the ISFD. 4 . The process according to claim 1 , wherein during the second reaction step the zinc is removed from the ISFD by evaporating ZnCl 2 at temperatures from 850° C. to 1200° C., under a non-oxidizing atmosphere. 5 . The process according to claim 1 , wherein off-gasses generated in the first reaction step in the first reactor are treated in an off-gas treatment system to obtain lead-enriched flue dust. 6 . The process according to claim 1 , wherein off-gasses generated in the second reaction step in the second reactor are treated in an off-gas treatment system to obtain zinc-enriched flue dust. 7 . The process according to claim 1 , wherein the ratio of ironmaking and/or steelmaking flue dust comprising ISFD and CPM being chosen so that the chloride content of the FS is between 100% and 150%, preferably between 100% and 130%, of the amount necessary for a stoichiometric conversion of the heavy metals in the ISFD into chlorides. 8 . The process according to claim 1 , wherein the chloride precursor material (CPM) is selected from the group comprising consisting of polyvinyl chloride (PVC), waste comprising PVC, chlorinated rubber or other chlorinated polymers, FeCl 2 , FeCl 3 , and CaCl 2 ). 9 . The process according to claim 1 , wherein the chloride precursor material (CPM) is FeCl 2 . 10 . The process according to claim 1 , wherein each of the first reaction step and the second reaction step are performed in a rotary kiln. 11 . A method of use of the obtained secondary solid material after the second reaction step according to claim 1 , comprising feeding the obtained secondary solid material to an ironmaking operation as a ferrous raw materials and/or carbon resource. 12 . A method of use of the zinc-enriched flue dust from the second reaction in the second reactor according to claim 6 , comprising feeding the zinc-enriched flue dust to a hydrometallurgical process or electrolytic process to recover the zinc metal or zinc compounds. 13 . A plant for implementing the process for the selective heavy metal removal from iron- and/or steelmaking flue dust according to claim 1 , the plant comprising an apparatus for preparing a feedstock FS by blending or mixing the CPM and ISFD; a first reactor configured for the first reaction step and the first reactor being equipped with an off-gas treatment system; and a second reactor configured for the second reaction step and the second reactor being equipped with an off-gas treatment system. 14 . The plant according to claim 13 , wherein the first reactor and the second reactor are positioned in-line. 15 . The plant according to claim 13 , comprising at least one operation selected from the group comprising a blast furnace operation, a direct reduced iron making operation, a reducing electrical furnace operation, an electric arc furnace operation, a HIsarna-type ironmaking process, and a basic oxygen steelmaking operation; the operation(s) including off-gas generation and being equipped with an off-gas treatment system to capture the flue dust comprising heavy metals, the heavy metals being at least lead, zinc and optionally also cadmium (ISFD); the apparatus, the first reactor and the second reactor; the ISFD being blended or mixed in apparatus with a chloride precursor material (CPM) to prepare a feedstock (FD); subjecting said feedstock (FD) to a thermal treatment in the first reaction step in the first reactor, and the subsequent second reaction step in the second reactor; and the obtained secondary solid material after the second reaction step and removed from the second reactor is re-used in an ironmaking operation as ferrous containing raw material via direct injection or after agglomeration. 16 . The process according to claim 1 , wherein during the first reaction step at least 70% of the Pb is removed from the ISFD by evaporating PbCl 2 at temperatures from 800° C. to 900° C., under a non-oxidizing atmosphere. 17 . The process according to claim 1 , wherein during the first reaction step at least 90 wt. % of the Pb is removed from the ISFD. 18 . The process according to claim 1 , wherein during the second reaction step the zinc is removed from the ISFD by evaporating ZnCl 2 at temperatures from 900° C. to 1100° C., under a non-oxidizing atmosphere. 19 . The plant according to claim 13 , wherein the first reactor and the second reactor are positioned in-line, and each of the first reactor and the second reactor are a rotary kiln.
of zinc, cadmium or mercury · CPC title
from metallic residues or scraps · CPC title
by dry processes · CPC title
Recovery from waste materials · CPC title
Wet processes · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.