Monitoring system for annular scrubbers
US-10155195-B2 · Dec 18, 2018 · US
US2025179593A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2025179593-A1 |
| Application number | US-202318836896-A |
| Country | US |
| Kind code | A1 |
| Filing date | Feb 7, 2023 |
| Priority date | Feb 8, 2022 |
| Publication date | Jun 5, 2025 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
When CO 2 is removed from a blast furnace gas containing unused CO gas and CO gas after removing CO 2 is again injected into a blast furnace, nitrogen accumulates in the blast furnace. O 2 is thus injected instead of blast. This causes the absence of nitrogen in front of a tuyere, so that a volume of gas generated in front of the tuyere is insufficient and a temperature in front of the tuyere rises, resulting in a difficulty in the blast furnace operation. N 2 gas or CO 2 gas is thus injected together with the CO gas injected through the tuyere, and circulated.
Opening claim text (preview).
1 - 6 . (canceled) 7 . A blast furnace operation method comprising: injecting O 2 gas through a tuyere of a blast furnace in place of air blast; separating and removing CO 2 from a blast furnace gas discharged from a furnace top of the blast furnace; and injecting all of CO gas after removing CO 2 through the tuyere of the blast furnace, wherein all of N 2 gas, which is injected through the tuyere of the blast furnace and discharged from the furnace top of the blast furnace together with the CO gas after removing CO 2 , is circulated within the blast furnace to make a N 2 circulation amount in the blast furnace constant. 8 . A blast furnace operation method comprising: injecting O 2 gas through a tuyere of a blast furnace in place of air blast; separating and removing CO 2 from a blast furnace gas discharged from a furnace top of the blast furnace; and injecting a part of CO gas after removing CO 2 through the tuyere of the blast furnace, wherein N 2 gas, which is injected through the tuyere of the blast furnace and discharged from the furnace top of the blast furnace together with the part of the CO gas after removing CO 2 , is circulated within the blast furnace to make a N 2 circulation amount in the blast furnace constant. 9 . The blast furnace operation method according to claim 7 , wherein an H 2 gas is injected through the tuyere of the blast furnace and the CO gas after removing CO 2 comprises the H 2 gas. 10 . A blast furnace operation method comprising: injecting O 2 gas through a tuyere of a blast furnace in place of air blast; separating and removing CO 2 from a part of a blast furnace gas discharged from a furnace top of the blast furnace to produce a CO gas; and injecting, through the tuyere of the blast furnace, all of the CO gas after removing CO 2 together with a rest of the blast furnace gas not separating and removing CO 2 from the blast furnace gas discharged from the furnace top of the blast furnace to make a CO 2 circulation amount in the blast furnace constant. 11 . A blast furnace operation method comprising: injecting O 2 gas through a tuyere of a blast furnace in place of air blast; separating and removing CO 2 from a part of a blast furnace gas discharged from a furnace top of the blast furnace to produce a CO gas; and injecting, through the tuyere of the blast furnace, a part of the CO gas after removing CO 2 together with a rest of the blast furnace gas not separating and removing CO 2 from the blast furnace gas discharged from the furnace top of the blast furnace to make a CO 2 circulation amount in the blast furnace constant. 12 . The blast furnace operation method according to claim 10 , wherein an H 2 gas is injected through the tuyere of the blast furnace and the CO gas after removing CO 2 comprises the H 2 gas. 13 . The blast furnace operation method according to claim 8 , wherein an H 2 gas is injected through the tuyere of the blast furnace and the CO gas after removing CO 2 comprises the H 2 gas. 14 . The blast furnace operation method according to claim 11 , wherein an H 2 gas is injected through the tuyere of the blast furnace and the CO gas after removing CO 2 comprises the H 2 gas.
Tuyéres · CPC title
of carbon dioxide · CPC title
by adding additional fuel in recirculation pipes · CPC title
Selection or treatment of the reducing gases · CPC title
Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.