Multiple vehicle control system

US2017282942A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2017282942-A1
Application numberUS-201615086403-A
CountryUS
Kind codeA1
Filing dateMar 31, 2016
Priority dateMar 31, 2016
Publication dateOct 5, 2017
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A system includes an energy management system disposed onboard a vehicle system configured to travel on a route during a trip. The energy management system is configured to receive trip information that includes one or more constraints including at least one of speed, distance, or time restrictions for the vehicle system along the route. The energy management system is further configured to generate a trip plan for controlling movement of the vehicle system along the route during the trip. The trip plan is generated based on the one or more constraints. The trip plan has a plan speed profile that designates speeds for the vehicle system according to at least one of distance or time during the trip. The energy management system is further configured to control movement of the vehicle system during the trip according to the plan speed profile of the trip plan.

First claim

Opening claim text (preview).

What is claimed is: 1 . A system comprising: an energy management system disposed onboard a first vehicle system configured to travel on a route during a trip, the energy management system having one or more processors, the energy management system being configured to receive trip information that is specific to the trip, the trip information including one or more constraints including at least one of speed, distance, or time restrictions for the first vehicle system along the route, the energy management system being further configured to generate a trip plan for controlling movement of the first vehicle system along the route during the trip, the trip plan being generated based on the one or more constraints, the trip plan having a plan speed profile that designates speeds for the first vehicle system according to at least one of distance or time during the trip, the energy management system further configured to control movement of the first vehicle system during the trip according to the plan speed profile of the trip plan. 2 . The system of claim 1 , wherein the trip information is received by the energy management system from at least one of an external coordinator, a second vehicle system, or an operator of the first vehicle system. 3 . The system of claim 1 , wherein the trip information includes a pacing speed profile that is based on movement of a second vehicle system on the route, the one or more constraints being based on the pacing speed profile. 4 . The system of claim 3 , wherein the one or more constraints include an upper time-distance boundary and a lower time-distance boundary, the upper time-distance boundary having a positive offset in at least one of distance or time relative to the pacing speed profile, the lower time-distance boundary having a negative offset in at least one of distance or time relative to the pacing speed profile, the upper and lower time-distance boundaries defining a movement window therebetween, the trip plan being generated such that the plan speed profile is generally maintained within the movement window during the trip. 5 . The system of claim 3 , wherein the energy management system is configured to partition the trip into multiple segments based on at least one of distance or time along the route, the one or more constraints including matching an average speed of the plan speed profile with an average speed of the pacing speed profile at ends of the segments. 6 . The system of claim 3 , wherein the energy management system is configured to generate the trip plan to reduce a difference in instantaneous speeds between the pacing speed profile and the plan speed profile of the trip plan at multiple times or locations during the trip. 7 . The system of claim 1 , wherein the one or more constraints include a designated minimum speed limit, the energy management system configured to generate the trip plan such that the plan speed profile is above the minimum speed limit during the trip. 8 . The system of claim 1 , wherein the one or more constraints include multiple arrival times associated with corresponding designated locations along the route during the trip, the energy management system configured to generate the trip plan such that the first vehicle system moving according to the plan speed profile arrives at the designated locations at least one of before, after, or within a designated time range of the corresponding arrival times. 9 . The system of claim 8 , wherein the designated locations are at least one of block signal locations, block segment boundaries, siding locations, or station locations. 10 . The system of claim 1 , wherein the energy management system is configured to generate the trip plan to control movement of the first vehicle system during the trip to at least one of reduce fuel consumption, reduce travel time, reduce wear on the vehicle, reach a destination at a predefined time, increase throughput on a vehicle network, reduce emissions, or reduce noise relative to manual control of the first vehicle system during the trip. 11 . The system of claim 1 , wherein the one or more constraints of the trip information are based on movement of a second vehicle system on the route that is moving in a same direction as the first vehicle system, the trip plan being generated based on the one or more constraints and the movement of the first vehicle system being controlled according to the trip plan such that the first vehicle system maintains at least a designated separation from the second vehicle system during the trip. 12 . The system of claim 1 , wherein the one or more constraints of the trip information are based on movement of a second vehicle system at least one of on the route and moving in an opposite direction as the first vehicle system or on a different route that intersects the route traveled by the first vehicle system, the trip plan being generated based on the one or more constraints and the movement of the first vehicle system being controlled according to the trip plan such that the first vehicle system at least one of passes the second vehicle system on the same route or crosses an intersection between the route and the different route at a time range that does not require the first vehicle system or the second vehicle system to stop. 13 . The system of claim 12 , wherein the system further includes a communication circuit that communicates the trip plan that is generated based on the one or more constraints to the second vehicle system for the second vehicle system to update movement of the second vehicle system based on the trip plan generated for the first vehicle system. 14 . The system of claim 1 , wherein the one or more constraints of the trip information are based on a scheduled arrival time for the first vehicle system at a cargo transfer location where cargo is at least one of loaded onto the first vehicle system or unloaded from the first vehicle system, the trip plan being generated based on the one or more constraints and the movement of the first vehicle system being controlled according to the trip plan such that the first vehicle system arrives at the cargo transfer location at least one of before, after, or within a designated time range of the scheduled arrival time. 15 . A system comprising: one or more processors configured to receive trip information from a communication circuit onboard a first vehicle system that is configured to travel on a route during a trip, the trip information including a pacing speed profile that is based on movement of at least a second vehicle system on the route, the one or more processors further configured to generate a trip plan for controlling movement of the first vehicle system along the route during the trip, the trip plan having a plan speed profile that designates speeds for the first vehicle system according to at least one of distance or time during the trip, the trip plan being generated using one or more constraints that are based on the pacing speed profile, the one or more processors further configured to control movement of the first vehicle system during the trip according to the plan speed profile of the trip plan to ensure that the first vehicle system maintains at least a designated separation from the second vehicle system during the trip. 16 . The system of claim 15 , wherein the one or more processors are disposed on the first vehicle system. 17 . The system of claim 15 , wherein the one or more constraints include an upper time-distance boundary and a lower time-distance boundary, the upper time-distance boundary hav

Assignees

Inventors

Classifications

  • by at least one leading vehicle of the fleet · CPC title

  • B61L3/008Primary

    Operations & Transport · mapped topic

  • On-board train data handling · CPC title

  • On-board diagnosis or maintenance · CPC title

  • On-board target speed calculation or supervision · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2017282942A1 cover?
A system includes an energy management system disposed onboard a vehicle system configured to travel on a route during a trip. The energy management system is configured to receive trip information that includes one or more constraints including at least one of speed, distance, or time restrictions for the vehicle system along the route. The energy management system is further configured to gen…
Who is the assignee on this patent?
Gen Electric
What technology area does this patent fall under?
Primary CPC classification B61L3/008. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Thu Oct 05 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).