Floating offshore wind turbine with damping structure
US-9522716-B2 · Dec 20, 2016 · US
US2016236756A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2016236756-A1 |
| Application number | US-201415022419-A |
| Country | US |
| Kind code | A1 |
| Filing date | Sep 11, 2014 |
| Priority date | Sep 18, 2013 |
| Publication date | Aug 18, 2016 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.
Opening claim text (preview).
1 . A mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line. 2 . The mooring system of claim 1 , wherein the offshore structure is a floating liquid natural gas facility. 3 . The mooring system of claim 1 , wherein the vessel is a liquid natural gas carrier vessel. 4 . The mooring system of claim 1 , wherein the first and second mooring lines are anchored to a sea floor. 5 . The mooring system of claim 1 , wherein the first and second mooring lines each comprise a buoy and a marker buoy. 6 . The mooring system of claim 1 , wherein the first and second mooring lines are connected to each other via a chord line. 7 . The mooring system of claim 1 , wherein the vessel is connected to the first mooring line, the second mooring line, and the one or more hawsers. 8 . The mooring system of claim 7 , wherein the vessel and the offshore structure are parallel to each other. 9 . The mooring system of claim 7 , wherein the vessel and the offshore structure are perpendicular to each other. 10 . A method for mooring a vessel comprising: providing a vessel; providing an offshore structure comprising one or more hawsers; providing a first mooring line; providing a second mooring line; attaching the first mooring line to the vessel; attaching the second mooring line to the vessel; and attaching the one or more hawsers to the vessel. 11 . The method of claim 10 , wherein the offshore structure is a floating liquid natural gas facility. 12 . The method of claim 10 wherein the vessel is a liquid natural gas carrier vessel. 13 . The method of claim 10 , wherein the first and second mooring lines are anchored to a sea floor. 14 . The method of claim 10 , wherein the first and second mooring lines each comprise a buoy and a marker buoy. 15 . The method of claim 10 , wherein the first and second mooring lines are connected to each other via a chord line. 16 . The method of claim 10 , further comprising orienting the vessel parallel with the offshore structure. 17 . The method of claim 10 , further comprising orienting the vessel perindicular to the offshore structure. 18 . A method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising an offshore structure comprising two hawsers, a vessel, a first mooring line, and a second mooring line, connecting the vessel to the first mooring line, the second mooring line, and the two hawsers in a side-by-side arrangement; transferring oil and/or gas from the structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers. 19 . A method for offloading oil and/or gas from a structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, a second mooring line, and a hawser; connecting the vessel to the first mooring line, the second mooring line, and the hawser in a tandem arrangement; transferring oil and/or gas from the structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO] · CPC title
Anchoring arrangements {or methods} for special vessels, e.g. for floating drilling platforms or dredgers · CPC title
Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices {(construction methods for floating offshore platforms B63B75/00)} · CPC title
{Arrangement of ship-based loading or unloading equipment} for transfer at sea between ships or between ships and off-shore structures · CPC title
Adaptations of chains, ropes, hawsers, or the like, or of parts thereof · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.