Floating offshore wind turbine with damping structure
US-9522716-B2 · Dec 20, 2016 · US
US9340261B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9340261-B2 |
| Application number | US-201214130976-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jul 4, 2012 |
| Priority date | Jul 6, 2011 |
| Publication date | May 17, 2016 |
| Grant date | May 17, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Method for mooring an offshore structure includes: providing a mooring line having one end connected to the sea bed and a connector at a free end; lifting the free end onto a deck of an anchor line handling vessel; connecting on the anchor line handling vessel a chain tensioner with a connection side to the connector; providing a working chain having a short tensioning part and a long installation part into the entry side of the chain tensioner; holding a free end of the installation part while lowering the chain tensioner below water level; picking up a free end of a pendant attached to the offshore structure, and attaching it to the free end of the installation part in an interconnect position on the anchor line handling vessel; placing the interconnect position overboard; connecting a lifting cable on the anchor line handling vessel to the tensioning part below water level; and exerting an upward tensioning force on the tensioning chain part.
Opening claim text (preview).
The invention claimed is: 1. Anchor line installation method for mooring an offshore structure ( 1 ) to a mooring line ( 7 , 8 , 11 ) comprising the steps of: providing a mooring line ( 11 ), with one end connected to a sea bed and comprising at a free end ( 13 , 15 ) a connector member ( 14 , 22 ), lifting the free end ( 13 , 15 ) onto a deck of an anchor line handling vessel ( 12 ), connecting on the anchor line handling vessel a chain tensioner ( 17 ) with a connection sid…
Operations & Transport · mapped topic
Operations & Transport · mapped topic
Cross-Sectional Technologies · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.