Non quenched and tempered steel and manufacturing process thereof

US2016208356A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2016208356-A1
Application numberUS-201315023513-A
CountryUS
Kind codeA1
Filing dateDec 3, 2013
Priority dateSep 26, 2013
Publication dateJul 21, 2016
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A non-quenched and tempered steel and manufacturing process thereof. The process alters the cooling mode before finish rolling in previous production of non-quenched and tempered steel; the process at least has a cooling step after the finish rolling step; the process utilizes alternate intense cooling and moderate cooling. The intense cooling can ensure the surface temperature of the steel to decrease rapidly; and the moderate cooling allows the core temperature of the steel to dissipate gradually to the surface; a further intense cooling is carried out to allow rapid heat dissipation. The intense cooling and the moderate cooling can be carried out alternately several times accordingly. A water cooling mode combining intense cooling and moderate cooling allows the core temperature and the surface temperature of the steel to become the same within a short time, the uniformity of the mechanical properties of the steel.

First claim

Opening claim text (preview).

1 . A non quenched and tempered steel, comprising following chemical components by weight percent: carbon 0.42 to 0.50, silicon 0.20 to 0.40, manganese 0.50 to 1.0, chromium 0.00 to 0.30, aluminum 0.010 to 0.030, nickel 0.00 to 0.10, copper 0.00 to 0.20, phosphorus 0.000 to 0.025, sulfur 0.00 to 0.025, and balance iron. 2 . The non quenched and tempered steel according to claim 1 , comprising following chemical components by weight percent: carbon 0.42 to 0.45, silicon 0.20 to 0.30, manganese 0.50 to 0.7, chromium 0.00 to 0.30, aluminum 0.010 to 0.030, nickel 0.00 to 0.10, copper 0.00 to 0.20, phosphorus 0.000 to 0.025, sulfur 0.00 to 0.025, and balance iron. 3 . The non quenched and tempered steel according to claim 1 , comprising following chemical components by weight percent: carbon 0.42 to 0.47, silicon 0.25 to 0.35, manganese 0.60 to 1.0, chromium 0.00 to 0.30, aluminum 0.010 to 0.030, nickel 0.00 to 0.10, copper 0.00 to 0.20, phosphorus 0.000 to 0.025, sulfur 0.00 to 0.025, and balance iron. 4 . The non quenched and tempered steel according to claim 1 , comprising following chemical components by weight percent: carbon 0.45 to 0.50, silicon 0.25 to 0.35, manganese 0.60 to 0.9, chromium 0.00 to 0.30, aluminum 0.010 to 0.030, nickel 0.00 to 0.10, copper 0.00 to 0.20, phosphorus 0.000 to 0.015, sulfur 0.00 to 0.015, and balance iron. 5 . A process for producing the non quenched and tempered steel of claim 1 , comprising a cooling step carried out at least after a finishing step, characterized in that: in said cooling step, an intense cooling and a moderate cooling are carried out alternately to allow the steel to undergo at least two stages of water cooling, so that the core temperature and the surface temperature of the steel become the same within a specified time. 6 . The process for producing non quenched and tempered steel according to claim 5 , characterized in that: in said cooling step, the steel is subjected to three stages of water cooling, wherein the first stage of water cooling uses intense cooling, the second stage of water cooling uses moderate cooling, and the third stage of water cooling uses intense cooling. 7 . The process for producing the non quenched and tempered steel according to claim 5 , characterized in that: in said cooling step, the cooling intensity is controlled by controlling the opening degree of valve(s) of a water cooling unit. 8 . The process for producing non quenched and tempered steel according to claim 5 , characterized in that: in said cooling step, the temperature of the steel decreases 100° C.-400° C. in 4-7 seconds after water cooling, and the temperature of the steel further decreases 50° C.-100° C. after temperature reversion. 9 . The process for producing non quenched and tempered steel according to claim 8 , characterized in that: in said cooling step, the first stage valve opening degree is controlled to be 30%-40%, the second stage valve opening degree is controlled to be 20%, and the third stage valve opening degree is controlled to be 30%-40%, to ensure the surface temperature of the steel to decrease 100-400° C. in 4-7 seconds. 10 . The process for producing non quenched and tempered steel according to claim 8 , characterized in that: in said cooling step, the steel is subjected to temperature-dropping cooling by means of spray cooling after temperature reversion. 11 . The process for producing non quenched and tempered steel according to claim 8 , characterized in that: after said temperature-dropping cooling, the steel is separately disposed on a cold bed and subjected to air cooling for 10-12 minutes. 12 . The process for producing non quenched and tempered steel according to claim 11 , characterized in that: after said air cooling, the steel is stacked and subjected to shield cooling. 13 . The process for producing non quenched and tempered steel according to claim 5 , characterized in that: the process further comprises a finish rolling step before the cooling step, in said finish rolling step, the temperature of the steel is controlled at ≦950° C. at the entry into the finish rolling step; the steel is subjected to low temperature rolling when the steel temperature is 850° C.-900° C. 14 . The process for producing non quenched and tempered steel according to claim 5 , characterized in that: the process further comprises a smelting step before the finish rolling step, the smelting step comprises electric furnace smelting step, ladle furnace smelting step and refining step carried out sequentially. 15 . The process for producing non quenched and tempered steel according to claim 14 , characterized in that: a molten iron smelting is utilized in the electric furnace smelting, wherein the final phosphorus content is ≦0.015%, the final carbon content is 0.03% to 0.10%, and the final temperature is 1620-1700° C. 16 . The process for producing non quenched and tempered steel according to claim 14 , characterized in that: in the ladle furnace smelting step and/or the refining step, silicon carbide, ferrosilicon powder are used to deoxidize. 17 . The process for producing non quenched and tempered steel according to claim 14 , characterized in that: the ladle furnace smelting step comprises making white slag and holding the white slag for 20 minutes or more. 18 . The process for producing non quenched and tempered steel according to claim 14 , characterized in that: in the refining step, the refining time is not less than 45 minutes, and the hydrogen content is controlled at 1.5 ppm or less. 19 . The process for producing non quenched and tempered steel according to claim 18 , characterized in that: the process further comprises a continuous casting step after the refining step, in said continuous casting step, an overheat is controlled at 20-35° C., a pulling speed is controlled at 0.5 m/min-0.6 m/min. 20 . The process for producing non quenched and tempered steel according to claim 19 , characterized in that: the process further comprises a heating step after the continuous casting step, in said heating step, the steel billet is placed in a heating furnace to be heated, wherein the preheating stage temperature is controlled at 850±30° C., the heating stage temperature is controlled at 1100±30° C., the soaking stage temperature is controlled at 1130±30° C., and the total time of the soaking stage is not less than 2 hours. 21 . A process for producing non quenched and tempered steel, the process comprises following steps, successively: (1) an electric furnace smelting step: providing iron raw materials having desired steel composition, a molten iron smelting is utilized in the electric furnace smelting, wherein final phosphorus content is ≦0.015%, final carbon content is 0.03% to 0.10%, and final temperature is 1620° C.-1700° C.; (2) a ladle furnace smelting step: wherein deoxidation is carried out using silicon carbide and/or ferrosilicon powder, white slag is made by adding lime, the white slag is held for 20 minutes or more; (3) a refining step: wherein deaeration is carried out, the refining time is controlled at 45 minutes or more, and the hydrogen content is controlled at 1.5 ppm or less; (4) a continuous casting step: the steel melt obtained in the refining step is subjected to continuous casting, an overheat of the steel melt is controlled at 20-35° C., a pulling speed is controlled at 0.5 m/min-0.6 m/min; (5) a heating step: the steel billet produced in the continuous casting step is placed in a furnace to be heated, wherein the

Assignees

Inventors

Classifications

  • during manufacturing of plates or strips (C21D8/12 takes precedence) · CPC title

  • Recycling · CPC title

  • by melting · CPC title

  • containing Si · CPC title

  • C21D9/0081Primary

    for slabs; for billets · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2016208356A1 cover?
A non-quenched and tempered steel and manufacturing process thereof. The process alters the cooling mode before finish rolling in previous production of non-quenched and tempered steel; the process at least has a cooling step after the finish rolling step; the process utilizes alternate intense cooling and moderate cooling. The intense cooling can ensure the surface temperature of the steel to …
Who is the assignee on this patent?
Univ Peking Founder Group Co, Suzhou Suxin Special Steel Co Ltd, Jiangsu Suzhou Steel Group Co Ltd
What technology area does this patent fall under?
Primary CPC classification C21D9/0081. Mapped technology areas include Chemistry & Metallurgy.
When was this patent published?
Publication date Thu Jul 21 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).