Well treatment method and system
US-2015369027-A1 · Dec 24, 2015 · US
US12486753B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12486753-B2 |
| Application number | US-202118001537-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jun 10, 2021 |
| Priority date | Jun 12, 2020 |
| Publication date | Dec 2, 2025 |
| Grant date | Dec 2, 2025 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A wellbore staged operation method includes running, after a first well drifting operation is performed on a wellbore, a pipe string ( 100 ) in the wellbore, wherein the pipe string ( 100 ) includes, along a direction from bottom to top, a floating hoop ( 2 ), a plug seat ( 7 ), a toe-end sliding sleeve ( 3 ), and a fracturing sliding sleeve ( 4 ); performing a cementing operation, wherein cement slurry pumped into an inner chamber of the pipe string ( 100 ) enters an annulus between the pipe string and the wellbore through the plug seat ( 7 ) and the floating hoop ( 2 ) to form a cement sheath, the cement sheath isolating the toe-end sliding sleeve ( 3 ) from the fracturing sliding sleeve ( 4 ); performing a second drifting operation to ensure the toe-end sliding sleeve ( 3 ) of the pipe string ( 100 ) exposed; performing a pressure test for the pipe string; and performing staged fracturing constructions.
Opening claim text (preview).
The invention claimed is: 1 . A wellbore staged operation method, comprising steps of: performing a first drifting operation on a wellbore; running a pipe string in the wellbore, wherein the pipe string comprises, along a direction from bottom to top, a floating hoop, a plug seat, a toe-end sliding sleeve, and a fracturing sliding sleeve that are spaced apart from one another; performing a cementing operation; performing a second drifting operation to expose the toe-end sliding sleeve of the pipe string; performing a pressure test for the pipe string; and performing staged fracturing construction, wherein performing the cementing operation comprises: cleaning the wellbore by pumping a prepad liquid into the pipe string and then, through the plug seat and the floating hoop, into an annulus disposed between the pipe string and the wellbore; pumping a cement slurry into the pipe string to enter the annulus through the plug seat and the floating hoop to form a cement sheath, the cement sheath isolating the toe-end sliding sleeve from the fracturing sliding sleeve; pumping a displacing fluid with a rubber plug into the pipe string to cause the rubber plug to contact the plug seat; and causing a pressure buildup and a hardening of the cement slurry in the annulus to form a cement sheath, and wherein the step of performing the second drifting operation comprises: performing a plugging operation to determine a position of the rubber plug; judging a position of the rubber plug relative to the toe-end sliding sleeve; and when the position of the rubber plug is above the toe-end sliding sleeve, performing a plug-removing operation using a coiled tubing connected to a plugging string or a plug-removing string to remove the plug from the plug seat. 2 . The method according to claim 1 , wherein the prepad liquid forms a liquid section of a length of 200-300 m in the annulus. 3 . The method according to claim 1 , wherein the cement sheath is of a length of at least 200 m above the fracturing sliding sleeve. 4 . The method according to claim 1 , wherein the built-up pressure is 3-5 MPa higher than a pressure of the liquid column. 5 . The method according to claim 1 , wherein the plugging operation is performed with the coiled tubing connected to the plugging string, wherein an outer diameter of the coiled tubing is 20-30 mm smaller than an inner diameter of the pipe string, and a maximum outer diameter of the plugging string is 3-5 mm smaller than the inner diameter of the pipe string, the coiled tubing having a running speed of 10-20 m/min. 6 . The method according to claim 1 , wherein the plug-removing operation is performed by the coiled tubing connected with the plug-removing string, a maximum outer diameter of the plug-removing string being 6-8 mm smaller than the inner diameter of the pipe string. 7 . The method according to claim 6 , wherein in the plug-removing operation, the rubber plug is drilled out to a position 10-20 m below a bottom surface of the toe-end sliding sleeve. 8 . The method according to claim 6 , wherein the rubber plug is drilled out through pumping a plug-removing working fluid to drive a drill bit via the plug-removing string, the plug-removing working fluid being pumped with a displacement of 300-500 L/min. 9 . The method according to claim 1 , wherein an operation of displacing the plug-removing working fluid in the pipe string is performed after the plug-removing operation. 10 . The method according to claim 9 , wherein the coiled tubing is lifted up after contacting with the rubber plug in the pipe string, and a well-construction working fluid is pumped to displace the plug-removing working fluid in the pipe string. 11 . The method according to claim 10 , wherein a pressure of the well-construction working fluid decreases stepwise. 12 . The method according to claim 10 , wherein the well-construction working fluid is a reaction fluid acting on the sliding sleeves of the pipe string, and wherein a spacer liquid is pumped before the well-construction working fluid.
Methods or devices for cementing, for plugging holes, crevices or the like · CPC title
using plugs for isolating cement charge; Plugs therefor {(stage cementing E21B33/146; spacer compositions C09K8/424)} · CPC title
Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.