Article Transport Facility
US-2024308782-A1 · Sep 19, 2024 · US
US12304745B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12304745-B2 |
| Application number | US-202117496322-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 7, 2021 |
| Priority date | Oct 12, 2020 |
| Publication date | May 20, 2025 |
| Grant date | May 20, 2025 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for manufacturing a conveyance device capable of accurately completing the conveyance device imagined by a customer in a relatively short time. One or a plurality of operation confirmation devices that visually confirms an operation of the conveyance device is used. The method includes exhibiting a desired operation of the conveyance device in a video by the operation confirmation device and confirming a required operation of the conveyance device in a specification confirmation step, inputting data for realizing the required operation or realizing an operation similar to the required operation to the operation confirmation device, exhibiting the operation of the conveyance device in a video based on the data that has been input in a virtual operation confirmation step, and inputting the data to an actual individual controller of the conveyance unit in a data input step.
Opening claim text (preview).
The invention claimed is: 1. A method for manufacturing a conveyance device, wherein the conveyance device comprises: a host controller; and a plurality of conveyance units each including an individual controller that controls each of the conveyance units, the individual controller of each conveyance unit including: a control circuit configured to input data regarding control; and a communication unit that communicates with the host controller, and wherein the method comprises: (a) confirming a required operation of the conveyance device by exhibiting a desired operation of the conveyance device in a video using at least one operation confirmation device that is configured to visually confirm an operation of the conveyance device; (b) confirming virtually the operation of the conveyance device by exhibiting the operation of the conveyance device in a video based on the data that has been input into the operation confirmation device, the data being for realizing the required operation or an operation similar to the required operation; (c) inputting the data into the individual controller of the actual plurality of conveyance units; and (d) confirming actually the operation of the conveyance device after step (c) by acquiring log data of the individual controller of each of the conveyance units whereby the log data includes information on actual operation of each of the conveyance units and a time of acquisition of the information, storing the log data in a log data storage unit, inputting the log data stored in the log data storage unit to the operation confirmation device, and reproducing the operation of the conveyance device in a video. 2. The method according to claim 1 , comprising (e) correcting the data that is confirmed as an error in step (d). 3. The method according to claim 2 , wherein a final specification creator is used to store a plurality of fixed phrases and display-fields corresponding to the plurality of fixed phrases, wherein information about a layout of the conveyance device to be manufactured and data input in step (c), and/or data corrected in step (e) are input into the final specification creator, and wherein a document in which the layout and a description based on the data are written in the display fields is created. 4. The method according to claim 1 , wherein the data is corrected to approximate to the required operation in step (b). 5. The method according to claim 1 , wherein a final specification creator is used to store a plurality of fixed phrases and display-fields corresponding to the plurality of fixed phrases, wherein information about a layout of the conveyance device to be manufactured and data input in step (c) are input into the final specification creator, and wherein a document in which the layout and a description based on the data are written in the display fields is created. 6. The method according to claim 1 , wherein the individual controller includes a basic control circuit, wherein a parameter required for a specific operation can be input as one of the data, and wherein a parameter for executing the operation of the conveyance device exhibited in step (a) is acquired and is input into the operation confirmation device when step (b) is performed. 7. The method according to claim 1 , wherein the individual controller includes a basic control circuit, wherein a parameter required for a specific operation can be input as one of the data, and wherein a parameter acquired from the data used in step (b) is input into the individual controller in step (c).
Optical · CPC title
Speed of the load carrier · CPC title
Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS] · CPC title
characterised by the transport system · CPC title
Handling, conveyor · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.