Composition supply method, composition, supply device, and composition filling method

US11896918B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11896918-B2
Application numberUS-202117235590-A
CountryUS
Kind codeB2
Filing dateApr 20, 2021
Priority dateApr 24, 2020
Publication dateFeb 13, 2024
Grant dateFeb 13, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The present disclosure provides a method for stably supplying a highly pure n-butylamine gas having a constant composition. The present disclosure is a composition supply method including: a filling step of filling a container with a composition containing n-butylamine in an amount of 99.5% by volume or more and isobutylamine in an amount of 0.001% by volume or more and 0.5% by volume or less; a warming step of warming the container filled with the composition to 50° C. or higher; and a gas supply step of supplying a gas containing n-butylamine and isobutylamine from the warmed container to a predetermined device.

First claim

Opening claim text (preview).

What is claimed is: 1. A composition supply method comprising: a filling step of filling a container with a composition containing n-butylamine in an amount of 99.5% by volume or more and isobutylamine in an amount of 0.001% by volume or more and 0.5% by volume or less; a warming step of warming the container filled with the composition to 50° C. or higher; and a gas supply step of supplying a gas containing n-butylamine and isobutylamine from the warmed container to a predetermined device. 2. The composition supply method according to claim 1 , further comprising, prior to the gas supply step, a discharging step of discharging 5% by mass or more of the composition in the container in the form of gas from the warmed container. 3. The composition supply method according to claim 1 , further comprising, prior to the gas supply step, a discharging step of discharging 10% by mass or more of the composition in the container in the form of gas from the warmed container. 4. The composition supply method according to claim 1 , wherein the warming step involves warming the container to 60° C. to 90° C. 5. The composition supply method according to claim 1 , wherein the warming step involves warming the container to 70° C. to 75° C. 6. The composition supply method according to claim 1 , wherein the composition is prepared by distillation of a mixture containing n-butylamine and isobutylamine prior to the filling step. 7. The composition supply method according to claim 1 , wherein the composition contains n-butylamine in an amount of 99.5% by volume or more and isobutylamine in an amount of 0.001% by volume or more and 0.2% by volume or less. 8. The composition supply method according to claim 1 , wherein the composition contains n-butylamine in an amount of 99.9% by volume or more and isobutylamine in an amount of 0.001% by volume or more and 0.05% by volume or less. 9. The composition supply method according to claim 2 , wherein the filling step, the heating step, and the discharging step are carried out for multiple containers prior to the gas supply step, and the gas supply step is started for a first container and subsequently started for a second container after 50% by mass or more of the composition in the first container is used. 10. The composition supply method according to claim 9 , wherein the amount of the composition in the form of gas supplied from the first container is different from the amount of the composition in the form of gas supplied from the second container in the gas supply step. 11. A composition comprising n-butylamine in an amount of 99.5% by volume or more and isobutylamine in an amount of 0.001% by volume or more and 0.5% by volume or less. 12. The composition according to claim 11 , comprising n-butylamine in an amount of 99.5% by volume or more and isobutylamine in an amount of 0.001% by volume or more and 0.2% by volume or less. 13. The composition according to claim 11 , comprising n-butylamine in an amount of 99.9% by volume or more and isobutylamine in an amount of 0.001% by volume or more and 0.05% by volume or less. 14. A supply device comprising multiple containers filled with a composition comprising n-butylamine in an amount of 99.5% by volume or more and isobutylamine in an amount of 0.001% by volume or more and 0.5% by volume or less, wherein when the containers are warmed to 50° C. or higher, the supply device is configured to supply an n-butylamine composition in the form of gas. 15. A composition filling method comprising: a filling step of filling a container with a composition containing n-butylamine in an amount of 99.5% by volume or more and isobutylamine in an amount of 0.001% by volume or more and 0.5% by volume or less; a warming step of warming the container filled with the composition to 50° C. or higher; and a discharging step of discharging 5% by mass or more of the composition in the container in the form of gas from the warmed container.

Assignees

Inventors

Classifications

  • Generic processes or apparatus for manufacture or treatments not covered by the other groups of this subclass · CPC title

  • B01B1/005Primary

    Evaporation for physical or chemical purposes; Evaporation apparatus therefor, e.g. evaporation of liquids for gas phase reactions · CPC title

  • Apparatus for generating gases (production of inert gas mixtures B01J19/14; for generating specific gases, see the relevant subclasses, e.g. C01B, C10J {; in "air bags" on vehicles B60R21/26; for starter gas F02C7/26; blasting cartridges for producing gas under pressure F42B3/04}) · CPC title

  • Controlling the temperature of the process · CPC title

  • Applications of control, warning or safety devices in filling machinery (flow-control B67C3/28) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11896918B2 cover?
The present disclosure provides a method for stably supplying a highly pure n-butylamine gas having a constant composition. The present disclosure is a composition supply method including: a filling step of filling a container with a composition containing n-butylamine in an amount of 99.5% by volume or more and isobutylamine in an amount of 0.001% by volume or more and 0.5% by volume or less; …
Who is the assignee on this patent?
Central Glass Co Ltd
What technology area does this patent fall under?
Primary CPC classification B01B1/005. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Feb 13 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).