Method and system for tin immersion and soldering of core wire
US-2020254550-A1 · Aug 13, 2020 · US
US11517970B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11517970-B2 |
| Application number | US-201716756825-A |
| Country | US |
| Kind code | B2 |
| Filing date | Dec 14, 2017 |
| Priority date | Oct 30, 2017 |
| Publication date | Dec 6, 2022 |
| Grant date | Dec 6, 2022 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Disclosed are a method and a system for tin immersion and soldering of a core wire which includes: inserting a core wire row into molten tin vertically; moving the each core wire in the molten tin along a direction perpendicular to the core wire row to remove carbonized matter from each core wire on a moving direction side; pulling the each core wire out of the molten tin; and performing alignment, such that the inner core conductor of the each core wire on the moving direction side contacts with a bonding pad. According to the technical solution of the present disclosure, the carbonized matter on the core wire that aligned facing the bonding pad is removed, such that the temperature transfer effect of the automatic soldering is improved, the yield of the automatic soldering is improved, and the consistency and the yield of the automatic soldering are more stable.
Opening claim text (preview).
What is claimed is: 1. A method for tin immersion and soldering of core wire, characterized in, comprising: inserting a core wire row into molten tin vertically to melt an insulation skin on each core wire of the core wire row and complete pre-tinning of an inner core conductor; moving the each core wire in the molten tin along a direction perpendicular to the core wire row to remove carbonized matter from the each core wire on a moving direction side, wherein the carbonized matter is generated from the melted skin during the melting of the insulation skin; pulling the each core wire out of the molten tin; and performing alignment, such that the inner core conductor of the each core wire on the moving direction side is respectively in contact with a bonding pad. 2. The method according to claim 1 , wherein the inserting a core wire row into molten tin vertically comprises: making ends for soldering of a plurality of core wires in a straight and ordered arrangement to obtain the core wire row; and inserting the core wire row into the molten tin vertically for 1 to 3 seconds. 3. The method according to claim 2 , wherein a temperature of the molten tin is 380° C. to 420° C. 4. The method according to claim 1 , wherein the moving the each core wire in the molten tin along a direction perpendicular to the core wire row comprises: moving the each core wire for 1 to 2 seconds. 5. The method according to claim 4 , wherein the moving the each core wire in the molten tin along a direction perpendicular to the core wire row comprises: moving the each core wire for 20 to 40 mm. 6. The method of claim 1 , wherein the pulling the each core wire out of the molten tin comprises: pulling the each core wire out of the molten tin within 0.1 to 0.3 seconds. 7. The method according to claim 1 , further comprising: soldering the each core wire to the bonding pad after the alignment is performed. 8. The method according to claim 2 , further comprising: soldering the each core wire to the bonding pad after the alignment is performed. 9. The method according to claim 3 , further comprising: soldering the each core wire to the bonding pad after the alignment is performed. 10. The method according to claim 4 , further comprising: soldering the each core wire to the bonding pad after the alignment is performed. 11. The method according to claim 5 , further comprising: soldering the each core wire to the bonding pad after the alignment is performed. 12. The method according to claim 6 , further comprising: soldering the each core wire to the bonding pad after the alignment is performed.
Wires · CPC title
Preliminary treatment of work or areas to be soldered, e.g. in respect of a galvanic coating · CPC title
Soldering by means of dipping in molten solder · CPC title
Exothermic brazing · CPC title
Cleaning · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.