Stackable build plates for additive manufacturing powder handling

US11440256B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11440256-B2
Application numberUS-201916440320-A
CountryUS
Kind codeB2
Filing dateJun 13, 2019
Priority dateJun 15, 2018
Publication dateSep 13, 2022
Grant dateSep 13, 2022

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A three-dimensional printing apparatus includes a base, a first build plate, and a second build plate. The base includes a build platform. The first build plate is attached to the base and is movable in vertical directions to a position spaced vertically from the build platform. The second build plate is supported by the first build plate such that the second build plate is spaced vertically from the first build plate. A plurality of objects is fabricated by the apparatus. A first object is fabricated on the first build plate. The first build plate is moved vertically. A second object is fabricated on the second build plate.

First claim

Opening claim text (preview).

The invention claimed is: 1. A three-dimensional (3-D) printing apparatus comprising: a base including a build platform and a build chamber wall extending vertically from the build platform to define a build chamber; a first build plate device comprising a first build plate attached to the base and movable in the build chamber in vertical directions to a position spaced vertically from a plane defined by the build platform; a first support shaft; and a second build plate device comprising a second build plate movable in the build chamber and supported by the first build plate via the first support shaft such that an entirety of the second build plate is spaced vertically from the first build plate, the first build plate and the second plate thereby being configured to simultaneously support fabricated objects via contact with the fabricated objects, wherein the first build plate device and the second build plate device are in abutment with the build chamber wall. 2. The apparatus of claim 1 , further comprising a shaft supported by the base and configured to move the first build plate in the vertical directions. 3. The apparatus of claim 1 , wherein the first support shaft extends between the first build plate and the second build plate. 4. The apparatus of claim 3 , wherein the second build plate is removable from the first support shaft. 5. The apparatus of claim 4 , wherein the second build plate includes a recess, and wherein the first support shaft extends into the recess. 6. The apparatus of claim 5 , wherein the first support shaft is a fastener having a shank and a head extending from the shank, and wherein the head is receivable in the recess such that the head is irremovable from a portion of the recess in a direction transverse to a plane defined by an opening into the recess. 7. The apparatus of claim 3 , wherein the second build plate and the first support shaft are threaded such that the first support shaft is configured for threaded engagement to the second build plate. 8. The apparatus of claim 3 , further comprising a fastener, wherein the fastener attaches to the first support shaft through the second build plate to maintain the position of the second build plate relative to the first support shaft. 9. The apparatus of claim 3 , further comprising a third build plate supported by the second build plate such that the third build plate is spaced vertically from the second build plate. 10. The apparatus of claim 3 , wherein the first support shaft attaches to either one or both of a first side extending between a top and a bottom of the first build plate and a second side extending between a top and a bottom of the second build plate, the top of the first build plate facing the bottom of the second build plate. 11. A three-dimensional (3-D) printing system configured for providing a high energy beam for selectively heating metal powder deposited onto build plates within the system, the system comprising: a base including a build platform and a build chamber wall extending vertically from the build platform to define a build chamber; a first build plate attached to the base and movable in the build chamber in vertical directions to a position spaced vertically from a plane defined by the build platform; a second build plate movable in the build chamber and supported by the first build plate; a first set of fabricated objects supported by the first build plate; a second set of fabricated objects supported by the second build plate; a remaining portion of metal powder supported by either one or both of the first build plate and the second build plate remaining after selectively heating, with the high energy beam, a portion of the metal powder to form a respective one or ones of the first set of fabricated objects and the second set of fabricated objects supported by the one or both of the first build plate and the second build plate, wherein the first build plate and the second build plate are adjacent to the build chamber wall. 12. The system of claim 11 , wherein the remaining portion of the metal powder is supported by both the first build plate and the second build plate. 13. A three-dimensional (3-D) printing apparatus comprising: a base including a build platform and a build chamber wall extending vertically from the build platform to define a build chamber; a first build plate device comprising a first build plate attached to the base and movable in the build chamber in vertical directions to a position spaced vertically from a plane defined by the build platform; a first support shaft; and a second build plate device comprising a second build plate movable in the build chamber and supported by the first build plate via the first support shaft such that a portion of the second build plate is spaced vertically without interruption from the first build plate, the first build plate and the second build plate thereby being configured to simultaneously support fabricated objects via contact with the fabricated objects, wherein the first build plate device and the second build plate device are in abutment with the build chamber wall. 14. The apparatus of claim 13 , further comprising a shaft supported by the base and configured to move the first build plate in the vertical directions. 15. The apparatus of claim 13 , wherein the first support shaft extends between the first build plate and the second build plate. 16. The apparatus of claim 15 , wherein the second build plate is removable from the first support shaft. 17. The apparatus of claim 16 , wherein the second build plate includes a recess, and wherein the first support shaft extends into the recess. 18. The apparatus of claim 15 , wherein the second build plate and the first support shaft are threaded such that the first support shaft is configured for threaded engagement to the second build plate. 19. The apparatus of claim 15 , further comprising a fastener, wherein the fastener attaches to the first support shaft through the second build plate to maintain the position of the second build plate relative to the first support shaft. 20. The apparatus of claim 15 , further comprising a third build plate supported by the second build plate such that the third build plate is spaced vertically from the second build plate. 21. The apparatus of claim 1 , wherein the first build plate device and the second build plate device each include a seal positioned within respective gaps between the first build plate and the build chamber wall and between the second build plate and the build chamber wall to at least inhibit powder within the 3-D printing apparatus from falling through the respective gaps. 22. The apparatus of claim 11 , further comprising: a first seal attached to the first build plate and positioned within a first gap between the first build plate and the build chamber wall to at least inhibit any of the metal powder supported by the first build plate from falling through the first gap; and a second seal attached to the second build plate and positioned within a second gap between the second build plate and the build chamber wall to at least inhibit any of the metal powder supported by the second build plate from falling through the second gap.

Assignees

Inventors

Classifications

  • B33Y10/00Primary

    Processes of additive manufacturing · CPC title

  • B29C64/153Primary

    using layers of powder being selectively joined, e.g. by selective laser sintering or melting · CPC title

  • B29C64/245Primary

    Platforms or substrates (support structures intended to be sacrificed after manufacture B29C64/40) · CPC title

  • Serial processing with multiple devices grouped · CPC title

  • Platforms or substrates · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11440256B2 cover?
A three-dimensional printing apparatus includes a base, a first build plate, and a second build plate. The base includes a build platform. The first build plate is attached to the base and is movable in vertical directions to a position spaced vertically from the build platform. The second build plate is supported by the first build plate such that the second build plate is spaced vertically fr…
Who is the assignee on this patent?
Howmedica Osteonics Corp
What technology area does this patent fall under?
Primary CPC classification B33Y10/00. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Sep 13 2022 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 12 related publications on this page (citations in our corpus or others sharing the same primary CPC).