Build plate and apparatus for additive manufacturing

US9597730B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9597730-B2
Application numberUS-201414784904-A
CountryUS
Kind codeB2
Filing dateApr 16, 2014
Priority dateApr 19, 2013
Publication dateMar 21, 2017
Grant dateMar 21, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A powder bed deposition apparatus comprises a movable build plate, a powder delivery system, an energy beam apparatus capable of selectively steering at least one focused energy beam over successive quantities of metal powder, a non-metallic barrier layer, and an anchor removably secured to the build plate. The non-metallic barrier layer is disposed over a metal upper surface of the build plate. The anchor has a metal bonding surface flush with the non-metallic barrier layer, the non-metallic barrier layer and the anchor defining a removable build assembly with a powder bed working surface.

First claim

Opening claim text (preview).

The invention claimed is: 1. A powder bed deposition apparatus comprising: a movable build plate with a metal upper surface; a powder delivery system capable of supplying successive quantities of metal powder to the movable build plate; an energy beam apparatus capable of selectively steering at least one focused energy beam over each of the successive quantities of metal powder; a non-metallic barrier layer disposed over the metal upper surface of the build plate; and an anchor removably secured to the build plate, the anchor having a metal bonding surface flush with the non-metallic barrier layer, the non-metallic barrier layer and the anchor defining a removable build assembly with a powder bed working surface; wherein the anchor comprises: a removable anchor pin including a body, an upper surface, a lower surface, and a notch at least partially circumscribing the body between the upper and lower surfaces; and a sacrificial localized support structure metallurgically bonded to the upper surface of the anchor pin, the localized support structure having a surface defining at least a portion of the metal bonding surface. 2. The powder bed deposition apparatus of claim 1 , wherein the energy beam is selected from: an electron beam, and a laser beam. 3. The powder bed deposition apparatus of claim 1 , wherein the build plate includes at least one anchoring hole adapted to retain the removable build assembly during a build process. 4. The powder bed deposition apparatus of claim 3 , wherein the non-metallic barrier layer includes at least one hole having an edge aligned with an edge of the at least one anchoring hole. 5. The powder bed deposition apparatus of claim 1 , wherein the upper surface of the anchor pin defines at least a portion of the metal bonding surface. 6. The powder bed deposition apparatus of claim 1 , wherein the localized support structure comprises: a plurality of component build layers formed using the powder bed deposition apparatus. 7. The powder bed deposition apparatus of claim 1 , wherein the removable build assembly also includes an in-process near-net shape component comprising: a first component build layer including a first portion adhered to the metal bonding surface of the anchor, and a second portion disposed on the non-metallic barrier layer. 8. The powder bed deposition apparatus of claim 1 , wherein the non-metallic barrier layer comprises: a ceramic sheet generally conforming to the metal upper surface of the build plate. 9. The powder bed deposition apparatus of claim 1 , wherein the apparatus is selected from one of: a direct laser sintering (DLS) apparatus, a direct laser melting (DLM) apparatus, a selective laser sintering (SLS) apparatus, a selective laser melting (SLM) apparatus, a laser engineering net shaping (LENS) apparatus, an electron beam melting (EBM) apparatus, and a direct metal deposition (DMD) apparatus. 10. A build platform comprising: a build plate with a metal upper surface; and a build assembly removably secured to the build plate, the build assembly including a powder bed working surface having a non-metallic barrier portion and a metal bonding portion, the non-metallic barrier portion disposed over the metal upper surface of the build plate, and the metal bonding portion flush with the non-metallic barrier portion; wherein the metal bonding portion comprises a surface of at least one anchor recessed below the metal upper surface of the build plate, the at least one anchor comprising: an anchor pin removably secured to the build plate during a build process, the anchor pin including a body, an upper surface, a lower surface, and a notch at least partially circumscribing the body between the upper and lower surfaces; and a sacrificial localized support structure metallurgically bonded to the upper surface of the anchor pin. 11. The build platform of claim 10 , wherein the non-metallic barrier portion comprises: a ceramic sheet generally conforming to the metal upper surface of the build plate. 12. The build platform of claim 10 , wherein the build assembly also includes an in-process near-net shape component comprising: a plurality of component build layers including a first component layer metallurgically bonded to the metal bonding surface of the anchor. 13. A method for manufacturing a near-net shape component, the method comprising: removably securing a powder bed working surface to a movable build plate with a metal upper surface, the powder bed working surface having a non-metallic barrier portion and a metal bonding portion, the non-metallic barrier portion disposed over the metal upper surface of the build plate, and the metal bonding portion flush with the non-metallic barrier portion; supplying a quantity of metal powder from a powder delivery system to form a first powder build layer on the powder bed working surface; forming a first component build layer by operating an energy beam apparatus to selectively steer at least one focused energy beam over the first powder build layer; and adhering the first component build layer to the metal bonding portion of the powder bed working surface; wherein the metal bonding portion comprises a surface of at least one anchor recessed below the metal upper surface of the build plate, the at least one anchor comprising: an anchor pin removably secured to the build plate during a build process, the anchor pin including a body, an upper surface, a lower surface, and a notch at least partially circumscribing the body between the upper and lower surfaces; and a sacrificial localized support structure metallurgically bonded to the upper surface of the anchor pin. 14. The method of claim 13 , wherein the non-metallic barrier portion comprises: a ceramic sheet generally conforming to the metal upper surface of the build plate. 15. The method of claim 13 , wherein the metal bonding portion comprises: an upper surface of an anchor removably secured to the build plate. 16. The method of claim 13 , wherein the metal bonding portion comprises: a surface of a sacrificial localized support structure metallurgically bonded to an anchor pin removably secured to the build plate. 17. The method of claim 13 , further comprising: supplying a subsequent layer of powder from the powder delivery system to form a subsequent powder build layer over at least a portion of a preceding component build layer; forming a subsequent component build layer by operating the energy beam apparatus to selectively steer the at least one focused energy beam over the subsequent powder build layer; and adhering the subsequent component build layer onto a portion of the preceding component build layer. 18. The method of claim 17 , further comprising: iteratively performing the steps of supplying a subsequent layer of powder, forming a subsequent component build layer, and adhering the subsequent component build layer to form a build assembly comprising the near-net shape component and the powder bed working surface. 19. The method of claim 18 , further comprising: removing the build assembly from the build plate. 20. The method of claim 19 , further comprising: separating the near-net shape component from the remainder of the build assembly.

Assignees

Inventors

Classifications

  • characterised by material · CPC title

  • Blades · CPC title

  • Direct deposition of metal particles, e.g. direct metal deposition [DMD] or laser engineered net shaping [LENS] · CPC title

  • Nozzles · CPC title

  • Powder bed fusion, e.g. selective laser melting [SLM] or electron beam melting [EBM] · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9597730B2 cover?
A powder bed deposition apparatus comprises a movable build plate, a powder delivery system, an energy beam apparatus capable of selectively steering at least one focused energy beam over successive quantities of metal powder, a non-metallic barrier layer, and an anchor removably secured to the build plate. The non-metallic barrier layer is disposed over a metal upper surface of the build plate…
Who is the assignee on this patent?
United Technologies Corp
What technology area does this patent fall under?
Primary CPC classification B29C64/40. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Mar 21 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).