Control heat of hydration by characterizing cementitious components

US11225595B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11225595-B2
Application numberUS-201716479040-A
CountryUS
Kind codeB2
Filing dateFeb 22, 2017
Priority dateFeb 22, 2017
Publication dateJan 18, 2022
Grant dateJan 18, 2022

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Methods of wellbore cementing are provided. A method of designing a cement composition may include: selecting a target heat of hydration for a target time and temperature; selecting one or more cementitious components and a weight percent for each of the one or more cementitious components such that a sum of a heat of hydration of the one or more cementitious components is less than or equal to the target heat of hydration; preparing the cement composition; and allowing the cement composition to set.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of designing a cement composition for use in a wellbore, the method comprising: selecting a target heat of hydration for a target time and temperature, wherein the target heat of hydration is for setting of the cement composition in the wellbore, wherein the target time is a setting time to reach the target heat of hydration, and wherein the temperature is a setting temperature for the cement composition; selecting one or more cementitious components and a weight percent for each of the one or more cementitious components for the cement composition; determining an approximate heat of hydration for the cement composition for the target time and the temperature, wherein the approximate heat of hydration is a sum of a component heat of hydration for each of the one or more cementitious components, wherein the component heat of hydration is obtained from a database comprising calorimetric data for each of the one or more cementitious components, wherein the one or more cementitious components and the weight percent is selected such that the approximate heat of hydration is less than or equal to the target heat of hydration; preparing the cement composition; and allowing the cement composition to set. 2. The method of claim 1 wherein the one or more cementitious components comprise at least one cementitious component selected from the group consisting of Portland cement, lime, fly ash, slag, silica fume, crystalline silica, silica flour, cement kiln dust, zeolite, agricultural waste ash, pozzolans, and combinations thereof. 3. The method of claim 1 wherein the cement composition further comprises one or more additives selected from the group consisting of weighting agents, retarders, accelerators, activators, gas control additives, lightweight additives, gas-generating additives, mechanical-property-enhancing additives, suspending agents, lost-circulation materials, filtration-control additives, fluid-loss-control additives, defoaming agents, foaming agents, transition time modifiers, dispersants, thixotropic additives, and combinations thereof. 4. The method of claim 1 wherein the one or more cementitious components comprise Portland cement, and wherein the Portland cement is present in an amount of about 10% to about 90% by weight. 5. The method of claim 1 further comprising the step of calculating a peak temperature that will be reached in the cement composition during setting for the target time at the temperature. 6. The method of claim 5 wherein the calculated peak temperature is compared to a maximum allowed temperature for the cement composition during the setting, and wherein the weight percent of at least one of the one or more cementitious components is adjusted until the calculated peak temperature is less than or equal to the maximum allowed temperature. 7. The method of claim 1 wherein the preparing the cement composition comprises mixing components of the cement composition using mixing equipment, the components comprising the one or more cementitious components. 8. The method of claim 1 further comprising introducing the cement composition into a wellbore using one or more pumps. 9. A system of generating a cement composition comprising: a plurality of cementitious components; and a computer system configured to accept input from a user and generate concentrations of the cementitious components for the cement composition, wherein the input comprises a target heat of hydration for setting of the cement composition and a target time to reach the target heat of hydration, wherein the computer system is further configured to generate concentrations of cementitious components based on the target heat of hydration and the target time to reach a heat of hydration, wherein computer system is further configured to determine an approximate heat of hydration of the cement composition at the target time, wherein the approximate heat of hydration is a sum of a component heat of hydration for each of the one or more cementitious components, wherein the one or more cementitious components and the weight percent is selected such that the approximate heat of hydration is less than or equal to the target heat of hydration. 10. The system of claim 9 wherein the computer system is further configured to calculate a heat of hydration and adjust the weight percent of at least one of each of the cementitious components such that the calculated heat of hydration is less than or equal to the target heat of hydration. 11. The system of claim 9 wherein the computer system is further configured to generate the cement composition based on a time dependent value of heat of hydration of the cementitious components, wherein the generation adjusts type of the cementitious components and/or concentration of the cementitious components. 12. The system of claim 9 further comprising a database, wherein the database comprises the cementitious components, a cost corresponding to each of the cementitious components, a calorimetric data corresponding to each of the cementitious components, and dissolution data corresponding to each of the cementitious components, wherein the computer system is further configured to use cost data to minimize a cost of the cement composition by adjusting types of the cementitious components and/or concentrations of the cementitious components in the cement composition to minimize the cost, wherein the calorimetric data comprises at least one of total heat generated and rate of heat generator. 13. The system of claim 12 wherein the computer system is further configured to generate a cement composition based on a temperature dependent value of heat of hydration, wherein the generation adjusts type of the cementitious components and/or concentrations of the cementitious components in the cement composition based on a temperature dependent value of heat of hydration so that the cement composition has an estimated heat of hydration that does not exceed the target heat of hydration. 14. A method of designing a cement composition for use in a wellbore, the method comprising: selecting engineering parameters for the cement composition, wherein the engineering parameters comprise a target heat of hydration and one or more additional engineering parameters selected from the group consisting of compressive strength, a rheological property, thickening time, and combinations thereof, wherein the target heat of hydration is for a target time and temperature, wherein the target heat of hydration is for a target time and temperature for setting of the cement composition in the wellbore, wherein the target time is a setting time to reach the target heat of hydration, and wherein the temperature is a setting temperature of the cement composition; selecting one or more cementitious components and a weight percent for each of the one or more cementitious components for the cement composition, wherein the one or more cementitious component and the weight percent is selected to meet the one or more additional engineering parameters; determining an approximate heat of hydration for the cement composition, wherein the approximate heat of hydration is a sum of a component heat of hydration for each of the one or more cementitious components, wherein the one or more cementitious components and the weight percent is selected such that the approximate heat of hydration is less than or equal to the target heat of hydration; preparing the cement composition; and allowing the cement composition to set. 15. The method of claim 14 wherein the one or more cementitious comp

Assignees

Inventors

Classifications

  • Low heat cements · CPC title

  • containing inorganic binders, e.g. Portland cement · CPC title

  • Heat treatment, e.g. precalcining, burning, melting; Cooling {(aspects only relating to the installation F27B)} · CPC title

  • C09K8/467Primary

    containing additives for specific purposes · CPC title

  • Portland cement · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11225595B2 cover?
Methods of wellbore cementing are provided. A method of designing a cement composition may include: selecting a target heat of hydration for a target time and temperature; selecting one or more cementitious components and a weight percent for each of the one or more cementitious components such that a sum of a heat of hydration of the one or more cementitious components is less than or equal to…
Who is the assignee on this patent?
Halliburton Energy Services Inc
What technology area does this patent fall under?
Primary CPC classification C09K8/467. Mapped technology areas include Chemistry & Metallurgy.
When was this patent published?
Publication date Tue Jan 18 2022 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 7 related publications on this page (citations in our corpus or others sharing the same primary CPC).