Railroad virtual track block system

US10894550B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10894550-B2
Application numberUS-201815965680-A
CountryUS
Kind codeB2
Filing dateApr 27, 2018
Priority dateMay 5, 2017
Publication dateJan 19, 2021
Grant dateJan 19, 2021

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of railroad track control for maintaining a braking distance onboard a locomotive, comprising: partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track; detecting a position of an electrical circuit discontinuity in one of the plurality of virtual track blocks; in response to detecting a presence of the electrical circuit discontinuity in the one of the plurality of virtual track blocks, generating a corresponding virtual track block position code indicating the position of the electrical circuit discontinuity in the one of the plurality of virtual track blocks; and transmitting the virtual track block position code to the locomotive. 2. The method of claim 1 , wherein the electrical circuit discontinuity is an open circuit indicating a broken track within the one of the virtual track blocks. 3. The method of claim 1 , wherein the electrical circuit discontinuity is a shunt caused by wheels of a train within the one of the plurality of virtual track blocks. 4. The method of claim 1 , wherein detecting the presence of the electrical circuit discontinuity in one of the plurality of virtual track blocks comprises: detecting a break in a first code transmitted from the first end of the physical track block to the second end of the physical track block; transmitting a second code from at least one of the first and second ends of the physical track block; and receiving the second code returned from the electrical circuit discontinuity to determine the position of the electrical circuit discontinuity within one of the plurality of virtual track blocks. 5. The method of claim 4 , wherein the first code is carried by a first electrical signal and the second code is carried by a second electrical signal. 6. A method of maintaining a braking distance onboard a locomotive for controlling railroad track, comprising: partitioning each of a plurality of physical track blocks into a plurality of virtual track blocks; detecting a presence of a train within a physical track block; in response to detecting the presence of a train within a physical track block, determining a virtual track block within the physical track block in which the train is present; and transmitting a code identifying the virtual track block in which the train is present to the locomotive. 7. The method of claim 6 , wherein detecting the presence of the train within the physical track block comprises detecting a change instate of a track signal transmitted through the physical track block. 8. The method of claim 7 , wherein determining the virtual track block within the physical track block in which the train is present comprises transmitting a signal from at least one of first and second ends of the physical track block and receiving a return of the signal from wheels of the train. 9. The method of claim 8 , wherein transmitting the signal from at least one of the first and second ends of the physical track block comprises transmitting a code. 10. The method of claim 9 , wherein determining the virtual track block within the physical track block in which the train is present comprises transmitting a signal from each of first and second ends of the physical track block and receiving corresponding return signals from front and rear wheels of the train. 11. The method of claim 6 , wherein transmitting the code identifying the virtual track block in which the train is present comprises transmitting a code including at least one bit corresponding to each of the plurality of virtual track blocks within the physical track block. 12. The method of claim 6 , wherein transmitting the code identifying the virtual track block in which the train is present comprises wirelessly transmitting the code. 13. The method of claim 6 , wherein detecting the presence of the train within a physical track block comprises detecting the presence of the train within first and second physical track blocks, and further comprising: in response to detecting the presence of the train within the first and second physical track blocks, determining a virtual track block within each of the first and second physical track blocks in which the train is present; and transmitting a code identifying the virtual track blocks within the first and second physical track blocks in which the train is present. 14. The method of claim 13 , wherein the first and second physical track blocks are adjacent physical track blocks separated by an insulated joint and determining a virtual track block within each of the first and second physical track blocks in which the train is present comprises transmitting a signal into each of the first and second adjacent physical track blocks from a single control system.

Assignees

Inventors

Classifications

  • B61L23/168Primary

    using coded current · CPC title

  • B61L1/188Primary

    Use of coded current · CPC title

  • Broken rails · CPC title

  • German radio based operations, called "Funkfahrbetrieb" [FFB] · CPC title

  • B61L11/08Primary

    using electrical or magnetic interaction between vehicle and track · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10894550B2 cover?
A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in respon…
Who is the assignee on this patent?
Bnsf Railway Co
What technology area does this patent fall under?
Primary CPC classification B61L23/168. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Jan 19 2021 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).