Controlling an HVAC system in association with a demand-response event

US10718539B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10718539-B2
Application numberUS-201715805312-A
CountryUS
Kind codeB2
Filing dateNov 7, 2017
Priority dateMar 15, 2013
Publication dateJul 21, 2020
Grant dateJul 21, 2020

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A control system includes an energy management system in operation with intelligent, network-connected thermostats located in structures. The thermostats are operable to control heating, ventilation, and air conditioning (HVAC) systems. Control during a demand response (DR) event period may be performed based on an optimal control trajectory of the HVAC system, where the control trajectory is optimal in that it minimizes a cost function.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of carrying out a demand response (DR) event by a control system, the method comprising: identifying, by the system, a DR event period for the DR event; accessing a plurality of parameter sets, wherein each of the plurality of parameter sets comprises: a first parameter indicative of a temperature-wise offset from a temperature setpoint of an original setpoint schedule; and a second parameter indicative of a slope of a linear sequence of temperature setpoints passing through a point at the temperature-wise offset from the temperature setpoint of the original setpoint schedule; generating candidate setpoint schedules for the DR event period for each of the plurality of parameter sets; simulating each of the candidate setpoint schedules using a thermodynamic model of how one or more structures respond to one or more heating, ventilation, and air conditioning (HVAC) systems; generating predicted indoor temperature profiles or HVAC duty cycle schedules for each of the simulated candidate setpoint schedules; evaluating a cost function for each of the predicted indoor temperature profiles or HVAC duty cycle schedules; selecting an optimal predicted indoor temperature profile or HVAC duty cycle schedule that minimizes the cost function; and controlling the one or more HVAC systems during the DR event period in accordance with the optimal predicted indoor temperature profile or HVAC duty cycle schedule. 2. The method of claim 1 , further comprising: determining a setpoint temperature profile over the DR event period by: calculating a setpoint temperature profile over the DR event period based on an expected indoor temperature trajectory, and identifying peaks and troughs of the calculated setpoint temperature profile; and causing setpoint temperatures defined by the setpoint temperature profile to be displayed to a user of the HVAC system. 3. The method of claim 1 , wherein each parameter set further comprises a third parameter indicative of a maximum HVAC duty cycle period. 4. The method of claim 1 , wherein each parameter set further comprises a fourth parameter indicative of a duration of a pre-DR event period. 5. The method of claim 1 , wherein the thermodynamic model is continuously updated. 6. The method of claim 1 , wherein the control system comprises a thermostat and a thermostat management server. 7. The method of claim 1 , further comprising: determining whether the one or more HVAC systems should be controlled in accordance with a different predicted indoor temperature profile or HVAC duty cycle schedule; and upon determining that the one or more HVAC systems should be controlled in accordance with a different predicted indoor temperature profile or HVAC duty cycle schedule: identifying a new predicted indoor temperature profile or HVAC duty cycle schedule; and controlling the one or more HVAC systems in accordance with the new predicted indoor temperature profile or HVAC duty cycle schedule. 8. The method of claim 7 , wherein determining whether the one or more HVAC systems should be controlled in accordance with a different predicted indoor temperature profile or HVAC duty cycle schedule is performed periodically during the DR event period. 9. The method of claim 7 , wherein determining whether the one or more HVAC systems should be controlled in accordance with a different predicted indoor temperature profile or HVAC duty cycle schedule includes one or more of: monitoring an indoor temperature of the one or more structures and comparing the monitored indoor temperature of the one or more structures to a predicted indoor temperature of the one or more structures; monitoring a state of the one or more HVAC systems and comparing the monitored state of the one or more HVAC systems to a predicted state of the one or more HVAC systems; monitoring a real-time occupancy of the one or more structures; and determining whether the optimal predicted indoor temperature profile or HVAC duty cycle schedule fails. 10. A control system for controlling operations of one or more HVAC systems in one or more structures, the control system comprising: one or more processors; and one or more memory devices comprising instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising: identifying, by the system, a DR event period for the DR event; accessing a plurality of parameter sets, wherein each of the plurality of parameter sets comprises: a first parameter indicative of a temperature-wise offset from a temperature setpoint of an original setpoint schedule; and a second parameter indicative of a slope of a linear sequence of temperature setpoints passing through a point at the temperature-wise offset from the temperature setpoint of the original setpoint schedule; generating candidate setpoint schedules for the DR event period for each of the plurality of parameter sets; simulating each of the candidate setpoint schedules using a thermodynamic model of how one or more structures respond to one or more heating, ventilation, and air conditioning (HVAC) systems; generating predicted indoor temperature profiles or HVAC duty cycle schedules for each of the simulated candidate setpoint schedules; evaluating a cost function for each of the predicted indoor temperature profiles or HVAC duty cycle schedules; selecting an optimal predicted indoor temperature profile or HVAC duty cycle schedule that minimizes the cost function; and controlling the one or more HVAC systems during the DR event period in accordance with the optimal predicted indoor temperature profile or HVAC duty cycle schedule. 11. The control system of claim 10 , wherein the operations further comprise: determining a setpoint temperature profile over the DR event period by: calculating a setpoint temperature profile over the DR event period based on an expected indoor temperature trajectory, and identifying peaks and troughs of the calculated setpoint temperature profile; and causing setpoint temperatures defined by the setpoint temperature profile to be displayed to a user of the HVAC system. 12. The control system of claim 10 , wherein each parameter set further comprises a third parameter indicative of a maximum HVAC duty cycle period. 13. The control system of claim 10 , wherein each parameter set further comprises a fourth parameter indicative of a duration of a pre-DR event period. 14. The control system of claim 10 , wherein the thermodynamic model is continuously updated. 15. The control system of claim 10 , wherein the one or more processors and the one or more memory devices are distributed between one or more thermostats and one or more thermostat management servers. 16. The control system of claim 10 , wherein the operations further comprise: determining whether the one or more HVAC systems should be controlled in accordance with a different predicted indoor temperature profile or HVAC duty cycle schedule; and upon determining that the one or more HVAC systems should be controlled in accordance with a different predicted indoor temperature profile or HVAC duty cycle schedule: identifying a new predicted indoor temperature profile or HVAC duty cycle schedule; and controlling the one or more HVAC systems in accordance with the new predicted indoor temperature profile or HVAC duty cycle schedule. 17. The control system of claim 16 , wherein determining whether the one or more HVAC systems should be controlled in accordance with a different predicted indoor temper

Assignees

Inventors

Classifications

  • F24F11/64Primary

    using pre-stored data · CPC title

  • F24F11/30Primary

    for purposes related to the operation of the system, e.g. for safety or monitoring · CPC title

  • Energy consumption · CPC title

  • variable in time · CPC title

  • characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10718539B2 cover?
A control system includes an energy management system in operation with intelligent, network-connected thermostats located in structures. The thermostats are operable to control heating, ventilation, and air conditioning (HVAC) systems. Control during a demand response (DR) event period may be performed based on an optimal control trajectory of the HVAC system, where the control trajectory is o…
Who is the assignee on this patent?
Google Llc
What technology area does this patent fall under?
Primary CPC classification F24F11/64. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Jul 21 2020 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).