Gas-blowing-hole array structure and soldering apparatus
US-2015382482-A1 · Dec 31, 2015 · US
US10149420B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10149420-B2 |
| Application number | US-201514794368-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jul 8, 2015 |
| Priority date | Jul 17, 2014 |
| Publication date | Dec 4, 2018 |
| Grant date | Dec 4, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A component mounting method is provided in a component mounting apparatus that mounts a component onto a board using a plurality of pieces of production data linked to component data. The method includes executing, when the component data is changed, a simulation of a production cycle time based on the production data, and comparing a simulation result of the production cycle time after change of the component data with a production cycle time or a simulation result of the production cycle time before change of the component data, and outputting a comparison result.
Opening claim text (preview).
What is claimed is: 1. A component mounting method in a plurality of component mounting apparatuses that mounts components onto a board using a plurality of pieces of production data linked to component data, the method comprising: changing the component data in order to suppress an operational error with respect to a component type; executing, after changing the component data, a simulation of a production cycle time based on a changed production data; and comparing a simulation result of the production cycle time after change of the component data with a production cycle time or a simulation result of the production cycle time before change of the component data, and outputting a comparison result regarding a bottleneck stage that has a longest production cycle time among the plurality of component mounting apparatuses, wherein the component data includes at least one of a component shape, component size, a number of leads, lead width, lead length, and a mounting operation condition information. 2. The component mounting method according to claim 1 , wherein the mounting operation condition information regulates a component mounting operation condition in the plurality of component mounting apparatuses. 3. The component mounting method according to claim 1 wherein the mounting operation condition information includes at least one of a suction speed in suctioning and extracting the components by a suction nozzle, an imaging condition in imaging the extracted components by an imaging tool, a mounting speed in mounting the components on the board, and a type of suction nozzle that is used, in the plurality of component mounting apparatuses. 4. The component mounting method according to claim 1 , wherein the operational error comprises a suction error or a mounting position shift with respect to the components. 5. A component mounting system configured to mount components onto a board using a plurality of pieces of production data linked to component data, the system comprising: a component mounting line that includes a plurality of component mounting apparatuses that executes an operation of mounting the components onto the board; an operation input and display section configured to display a component data registration and editing screen and configured to input a change to the component data in order to suppress an operational error with respect to a component type; a simulation executing section that executes, after the component data is changed, a simulation of a production cycle time based on the production data; and a comparison result output section that compares a simulation result of the production cycle time after change of the component data with a production cycle time or a simulation result of the production cycle time before change of the component data, and outputs a comparison result regarding a bottleneck stage that has a longest production cycle time among the plurality of component mounting apparatuses, wherein the component data includes at least one of a component shape, component size, a number of leads, lead width, lead length, and a mounting operation condition information. 6. The component mounting system according to claim 5 , wherein the mounting operation condition information regulates a component mounting operation condition in the plurality of component mounting apparatuses. 7. The component mounting system according to claim 5 , wherein the mounting operation condition information includes at least one of a suction speed in suctioning and extracting the components by a suction nozzle, an imaging condition in imaging the extracted components by an imaging toot, a mounting speed in mounting the components on the board, and a type of suction nozzle that is used, in the plurality of component mounting apparatuses.
Reflowing of solder coated conductors, not during connection of components, e.g. reflowing solder paste · CPC title
by soldering (H05K13/0469 takes precedence) · CPC title
Feeding with belts or tapes · CPC title
Incorporating a pick-up tool · CPC title
Heating processes for reflow soldering · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.