This page is not indexed by search engines while we improve data quality.

Means for introducing a predetermined time delay between the initiation of the switching operation and the opening or closing of the contacts (circuit arrangements for introducing delay H01H47/18; short-circuited conducting sleeves, bands, or discs H01H50/46)

Means for introducing a predetermined time delay between the initiation of the switching operation and the opening or closing of the contacts (circuit arrangements for introducing delay H01H47/18; short-circuited conducting sleeves, bands, or discs H01H50/46) · Cooperative Patent Classification (CPC)

Electric circuits, power, telecommunications, and semiconductors.

Related technology areas

Mapped technology topics for this CPC code.

CPC classification statistics
MetricValue
CPC codeH01H50/86
Official titleMeans for introducing a predetermined time delay between the initiation of the switching operation and the opening or closing of the contacts (circuit arrangements for introducing delay H01H47/18; short-circuited conducting sleeves, bands, or discs H01H50/46)
Display labelMeans for introducing a predetermined time delay between the initiation of the switching operation and the opening or closing of the contacts (circuit arrangements for introducing delay H01H47/18; short-circuited conducting sleeves, bands, or discs H01H50/46)
Total patents24

Filing trend

Year-over-year patent counts classified under this CPC code.

Filing activity over the last five years is rapidly declining.

Patents filed per year
YearPatents
20155
20166
20177
20182
20193
20211

Representative patents

Representative publications under this CPC code from precomputed stats, or recent filings when stats are unavailable.