Allocation of printed circuit boards on fitting lines
US-2015195966-A1 · Jul 9, 2015 · US
US9997502B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9997502-B2 |
| Application number | US-201514799766-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jul 15, 2015 |
| Priority date | Aug 18, 2014 |
| Publication date | Jun 12, 2018 |
| Grant date | Jun 12, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
There is provided a component arrangement determination method, in a component mounting apparatus including a plurality of component supply units for supplying components, for determining arrangement of the component supply units used for production of a plurality of types of component mounted boards. The method includes specifying a production frequency of each of the plurality of types of component mounted boards for a predetermined period of time, grouping the plurality of types of component mounted boards into a plurality of groups capable of being produced without changing the arrangement of the component supply units based on the production frequency, and determining arrangement, in the component mounting apparatus, of the component supply units for supplying components necessary for production of types of component mounted boards that belong to each group of the plurality of groups.
Opening claim text (preview).
What is claimed is: 1. A component arrangement determination method, in a component mounting apparatus including a plurality of component supply units for supplying components, for determining arrangement of the component supply units used for production of a plurality of types of component mounted boards, the method comprising: specifying a production frequency of each of the plurality of types of component mounted boards for a predetermined period of time; grouping the plurality of types of component mounted boards into a plurality of groups capable of being produced without changing the arrangement of the component supply units based on the production frequency; determining arrangement, in the component mounting apparatus, of the component supply units for supplying components necessary for production of types of component mounted boards that belong to each group of the plurality of groups; and producing a plurality of types of component mounted boards based on the grouping; wherein the step of grouping comprises: classifying the plurality of types of component mounted boards into a plurality of classes according to grades of the production frequency; selecting one of the plurality of classes; making a provisional group coupling two types of component mounted boards having a largest number of shared components included in the selected class; repeating the step of making the provisional group until all of the plurality of types of component mounted boards are coupled; and determining whether the arrangement of the component supply units is performed in the provisional group, wherein in the selecting step, the selecting is performed in order from a class with a highest production frequency. 2. The component arrangement determination method according to claim 1 , wherein in the grouping, types of component mounted boards having a high production frequency is preferentially incorporated into one group. 3. The component arrangement determination method according to claim 1 , wherein the production frequency is a ratio of a number of times of production of a relevant type of component mounted board with respect to a total number of times of production of all types of component mounted boards. 4. The component arrangement determination method according to claim 1 , wherein the production frequency is a ratio of a number of production days of a relevant type of component mounted board with respect to a total number of production days. 5. The component arrangement determination method according to claim 1 , wherein in the specifying of the production frequency, the production frequency is specified based on a production history or a production plan, or based on both the production history and the production plan.
Package configurations · CPC title
Assembly, mount of electronic parts onto board · CPC title
characterised by assembly · CPC title
Production planning, e.g. of allocation of products to machines, of mounting sequences at machine or facility level · CPC title
Cross-Sectional Technologies · mapped topic
Related publications grouped by family.
Answers are generated from the same data shown on this page.