Method and a control unit for validating an electric power plant

US9983241B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9983241-B2
Application numberUS-201414492359-A
CountryUS
Kind codeB2
Filing dateSep 22, 2014
Priority dateSep 22, 2014
Publication dateMay 29, 2018
Grant dateMay 29, 2018

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for validating an electric power plant capability as an electric service provider is provided. The method includes receiving a plurality of input data records from the plurality of renewable energy devices, respectively, the input data records respectively defining a plurality of device capabilities associated with at least one electrical service which can be provided by the renewable energy devices to the electric distribution grid; estimating internal power losses of the electric power plant; using the input data records and the internal power losses for calculating an output data record defining an overall plant capability for the service; communicating the output data record to an operator of the electric distribution grid; and receiving a validation signal from the operator of the electric distribution grid.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for validating and controlling an electric power plant capability as an electric service provider, the electric power plant comprising a plurality of renewable energy devices connected to an electric distribution grid, the method comprising: receiving a plurality of input data records from the plurality of the renewable energy devices, respectively, the input data records respectively defining a plurality of device capabilities associated with at least one electrical service to be provided by the renewable energy devices to the electric distribution grid, estimating internal power losses of the electric power plant, using the input data records and the internal power losses for calculating an output data record defining the electric power plant capability for said electrical service, communicating the output data record to an operator of the electric distribution grid, responsive to the output data record, receiving a validation signal from the operator of the electric distribution grid confirming or not confirming that the electric power plant capability for said electrical service is compliant with a standard and/or need of the electric distribution grid; and commanding execution of said electrical service by the electric power plant to solve a load imbalance in response to a confirming validation signal. 2. The method according to claim 1 , wherein the output data record represents a magnitude and/or a duration of the electrical service. 3. The method according to claim 1 , wherein the electrical service being at least one of under frequency response or over frequency response or ramping capability or reactive power capability or spinning reserve or other ancillary service. 4. The method according to claim 1 , wherein the input and/or output data records include at least a record of values (X1, X2, X3) comprising a first value (X1) representing a percentage of an actual production or of an installed capacity of one of the renewable energy devices and/or of the electric power plant, a second value (X2) representing a ramp rate for reaching the first value and a third value (X3) representing a duration of the service. 5. The method according to claim 4 , wherein the output data records include at least three records (X1, X2, X3; and X4, X5, X6; and X7, X8, X9), the third value (X3) of the first record being comprised between 0 and a first end time (T1), the third value (X6) of the second record being comprised between the first end time (T1) and a second end time (T2), the third value (X9) of the third record being comprised between the second end time (T2) and a third end time (T3). 6. The method according to claim 5 , wherein: T1 is comprised between 8 and 15 seconds; T2 is comprised between 500 and 700 seconds; T3 is comprised between 1500 and 2000 seconds. 7. The method according to claim 4 , wherein the first value is comprised between 6% and 10%. 8. The method according to claim 4 , wherein the first value is comprised between 2% and 3%. 9. The method according to claim 4 , wherein the first value is less than 2%. 10. The method according to claim 4 , wherein the first value is negative. 11. A control unit adapted to execute the method according to claim 1 for validating the capability of the electric power plant comprising the plurality of renewable energy devices. 12. An electric power plant for implementing the method of claim 1 , the electric power plant comprising: a central control unit adapted to receive the plurality of input data records from the plurality of renewable energy devices and to validate and to control the capability of the electric power plant as an electric service provider to the electric distribution grid to solve the load imbalance. 13. The electric power plant according to claim 12 , wherein the plurality of renewable energy devices comprises wind turbines and/or tidal turbines and/or wave turbines and/or solar generators. 14. The electric power plant according to claim 13 , wherein the electric power plant further comprises a storage device and/or a static synchronous compensator and/or a reactor. 15. The method of claim 1 accomplished on a wind power plant when the plant is not able to produce power because of a low wind condition, the at least one electrical service comprising managing internal electric consumption. 16. A method implemented with an electric power plant, the power plant comprising a plurality of individual renewable energy devices and being connected to an electric distribution grid subject to short-term load imbalances, the method comprising: determining a capability of each of the renewable energy devices to provide an ancillary service; determining an overall capability of the electric power plant to provide the ancillary service to the electric distribution grid upon request by an operator of the electric distribution grid by aggregating the capabilities of the renewable energy devices and taking into account internal power losses of the electric power plant; communicating the overall capability of the electric power plant to the operator of the electric distribution grid; and providing the ancillary service to the electric distribution grid upon receipt of a validation from the operator of the electric distribution grid that the overall capability of the electric power plant is compliant with a standard and/or need of the electric distribution grid to solve a load imbalance. 17. The method of claim 16 , wherein the ancillary service comprises at least one of the group of frequency support, voltage support, system restoration, reactive power capability and spinning reserve. 18. The method of claim 16 accomplished on a wind power plant when the wind plant is not able to produce power because of a low wind condition, the ancillary service comprising managing internal electric consumption of the wind plant.

Assignees

Inventors

Classifications

  • the wind motor being part of a wind farm · CPC title

  • Cross-Sectional Technologies · mapped topic

  • Output power or torque · CPC title

  • G01R21/00Primary

    Arrangements for measuring electric power or power factor (G01R7/12 takes precedence) · CPC title

  • Monitoring or testing of wind motors, e.g. diagnostics (testing during commissioning of wind motors F03D13/30) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9983241B2 cover?
A method for validating an electric power plant capability as an electric service provider is provided. The method includes receiving a plurality of input data records from the plurality of renewable energy devices, respectively, the input data records respectively defining a plurality of device capabilities associated with at least one electrical service which can be provided by the renewable …
Who is the assignee on this patent?
Siemens Ag
What technology area does this patent fall under?
Primary CPC classification G01R21/00. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue May 29 2018 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).