Method and apparatus for managing beam in beamforming system

US9960830B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9960830-B2
Application numberUS-201715477567-A
CountryUS
Kind codeB2
Filing dateApr 3, 2017
Priority dateApr 4, 2016
Publication dateMay 1, 2018
Grant dateMay 1, 2018

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A pre-5th-generation (5G) or 5G communication system for supporting higher data rates Beyond 4th-generation (4G) communication system such as long term evolution (LTE) is provided. In a beam update method of a terminal, measuring a beam reference signal (BRS) transmitted from a base station, determining whether a beam measurement information transmission condition is satisfied, if the beam measurement information transmission condition is satisfied, transmitting beam measurement information to the base station, receiving information about a base station transmitting beam from the base station, and updating information about a terminal receiving beam based on the received information about the base station transmitting beam.

First claim

Opening claim text (preview).

What is claimed is: 1. A method by a terminal, the method comprising: measuring a beam reference signal (BRS) transmitted from a base station; determining whether a beam measurement information transmission condition is satisfied; if the beam measurement information transmission condition is satisfied, transmitting beam measurement information to the base station; receiving information about a base station transmitting beam from the base station; and updating information about a terminal receiving beam based on the received information about the base station transmitting beam. 2. The method of claim 1 , wherein the measuring of the BRS includes measuring a first type reference signal and measuring a second type reference signal in a region identified based on the measured first type reference signal. 3. The method of claim 1 , further comprising: when a request for a beam measurement information report is received from the base station, transmitting the beam measurement information to the base station. 4. The method of claim 1 , wherein the beam measurement information transmission condition includes instructing the terminal to report the beam measurement information if an absolute value of a difference between beam quality information for the n-th BRS and beam quality information for the (n−1)-th BRS exceeds a predetermined threshold. 5. The method of claim 1 , wherein the beam measurement information transmission condition includes instructing the terminal not to report the beam measurement information for a given time if an absolute value of a difference between beam quality information for the n-th BRS and beam quality information for the (n−1)-th BRS is smaller than a predetermined threshold. 6. A terminal comprising: a transceiver configured to transmit or receive a signal; and at least one processor configured to: measure a beam reference signal (BRS) transmitted from a base station, to determine whether a beam measurement information transmission condition is satisfied, if the beam measurement information transmission condition is satisfied, transmit beam measurement information to the base station, receive information about a base station transmitting beam from the base station, and update information about a terminal receiving beam based on the received information about the base station transmitting beam. 7. The terminal of claim 6 , wherein the at least one processor is further configured to: measure a first type reference signal, and measure a second type reference signal in a region identified based on the measured first type reference signal. 8. The terminal of claim 6 , wherein the at least one processor is further configured to, when a request for a beam measurement information report is received from the base station, transmit the beam measurement information to the base station. 9. The terminal of claim 6 , wherein the beam measurement information transmission condition includes instructing the terminal to report the beam measurement information if an absolute value of a difference between beam quality information for the n-th BRS and beam quality information for the (n−1)-th BRS exceeds a predetermined threshold. 10. The terminal of claim 6 , wherein the beam measurement information transmission condition includes instructing the terminal not to report the beam measurement information for a given time if an absolute value of a difference between beam quality information for the n-th BRS and beam quality information for the (n−1)-th BRS is smaller than a predetermined threshold.

Assignees

Inventors

Classifications

  • using measured or perceived quality · CPC title

  • varying the {relative} phase {between the radiating elements of an array (H01Q3/2605, H01Q3/2658, H01Q3/2682, H01Q3/44 take precedence)} · CPC title

  • Diversity capabilities · CPC title

  • Electricity · mapped topic

  • using beam steering · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9960830B2 cover?
A pre-5th-generation (5G) or 5G communication system for supporting higher data rates Beyond 4th-generation (4G) communication system such as long term evolution (LTE) is provided. In a beam update method of a terminal, measuring a beam reference signal (BRS) transmitted from a base station, determining whether a beam measurement information transmission condition is satisfied, if the beam meas…
Who is the assignee on this patent?
Samsung Electronics Co Ltd
What technology area does this patent fall under?
Primary CPC classification H04B7/0695. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue May 01 2018 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 10 related publications on this page (citations in our corpus or others sharing the same primary CPC).