Rope hoisting system
US-9790070-B2 · Oct 17, 2017 · US
US9944503B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9944503-B2 |
| Application number | US-201414778723-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 4, 2014 |
| Priority date | Mar 21, 2013 |
| Publication date | Apr 17, 2018 |
| Grant date | Apr 17, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A system for transporting and testing a crane includes a crane, a transporting frame and a foundation. A first connecting mechanism is provided for establishing a releasable connection between the crane and the transporting frame. A second connecting mechanism is provided for establishing a releasable connection between the transporting frame and the foundation. In a starting state, the crane, the transporting frame and the foundation are separate from one another. In a transporting state, the crane is connected to the transporting frame. In a testing state, the crane is connected to the transporting frame and the transporting frame is connected to the foundation. The invention also relates to a corresponding method. The invention makes it possible for the crane to be assembled, and tested, at a site remote from an offshore wind turbine.
Opening claim text (preview).
The invention claimed is: 1. A system for transporting and testing a crane intended for use in an offshore wind turbine, comprising a crane, a shipping frame, and a foundation, said system having a first connection mechanism for establishing a releasable connection between the crane and the shipping frame and a second connection mechanism for establishing a releasable connection between the shipping frame and the foundation, said second connection mechanism comprising a retaining opening and a retaining protrusion which matches the retaining opening, wherein the system is conceived for the following states: a. an initial state in which the crane, the shipping frame, and the foundation are provided separate from one another; b. a shipping state in which the crane is connected to the shipping frame; c. a testing state in which the crane is connected to the shipping frame and the shipping frame is connected to the foundation; and wherein in the testing state the retaining protrusion engages behind the retaining opening. 2. The system as claimed in claim 1 , wherein the first connection mechanism comprises a connector flange configured on the crane and a counterpiece assigned to the shipping frame. 3. The system as claimed in claim 2 , wherein the shipping frame has an adaptor part and the counterpiece is disposed on the adaptor part. 4. The system as claimed in claim 3 , comprising a set of adaptor parts, wherein the adaptor parts have various counterpieces for connecting to various types of cranes. 5. The system as claimed in claim 2 , wherein the shipping frame has a pan which surrounds the counterpiece. 6. The system as claimed in claim 5 , wherein the shipping frame is equipped with a rack face disposed beside the pan. 7. The system as claimed in claim 6 , wherein said crane includes an outrigger and the outrigger of the crane in the shipping state is oriented toward the rack face. 8. The system as claimed in claim 1 , wherein the second connection mechanism is stable in relation to moments of tilt and the second connection mechanism is released when a force substantially oriented upward acts between the shipping frame and the foundation. 9. The system as claimed in claim 1 , wherein a cover frame for the shipping frame is comprised therein and the cover frame in the shipping state encases the contour of the crane. 10. The system as claimed in claim 9 , wherein the cover frame at the upper end thereof has a connection element for establishing a connection to a second shipping frame. 11. The system as claimed in claim 9 , wherein the cover frame is releasably connected to the shipping frame. 12. A system for transporting and testing a crane intended for use in an offshore wind turbine, comprising a crane including an outrigger, a shipping frame having a pan and a rack face disposed beside the pan, and a foundation, said system having a first connection mechanism for establishing a releasable connection between the crane and the shipping frame and a second connection mechanism for establishing a releasable connection between the shipping frame and the foundation, said first connection mechanism comprising a connector flange configured on the crane and a counterpiece assigned to the shipping frame and surrounded by the pan, wherein the system is conceived for the following states: a. an initial state in which the crane, the shipping frame, and the foundation are provided separate from one another; b. a shipping state in which the crane is connected to the shipping frame; c. a testing state in which the crane is connected to the shipping frame and the shipping frame is connected to the foundation; and wherein in the shipping state said outrigger is oriented toward the rack face. 13. A system for transporting and testing a crane intended for use in an offshore wind turbine, comprising a crane, a first shipping frame, a second shipping frame, a cover frame for the first shipping frame having a connection element at an upper end for establishing a connection to the second shipping frame, and a foundation, said system having a first connection mechanism for establishing a releasable connection between the crane and the first shipping frame and a second connection mechanism for establishing a releasable connection between the first shipping frame and the foundation, wherein the system is conceived for the following states: a. an initial state in which the crane, the shipping frame, and the foundation are provided separate from one another; b. a shipping state in which the crane is connected to the shipping frame; c. a testing state in which the crane is connected to the shipping frame and the shipping frame is connected to the foundation; and wherein in the shipping state said cover frame encases the contour of the crane.
Constructional features or details (of dredgers E02F) · CPC title
separate from jib · CPC title
dismantable into smaller units for transport purposes · CPC title
by applying a load, e.g. for resistance or wear testing (G01M99/001 takes precedence; testing the elasticity of structures G01M5/00) · CPC title
with supporting couples provided by wind turbines · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.