Identifying Problematic Printers by Applying Markov Chain Model
US-2017171400-A1 · Jun 15, 2017 · US
US9942421B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9942421-B2 |
| Application number | US-201715412164-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jan 23, 2017 |
| Priority date | Feb 5, 2016 |
| Publication date | Apr 10, 2018 |
| Grant date | Apr 10, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An information processing system includes a determining unit configured to determine, based on use amounts, for predetermined respective periods, of a device, whether a period during which a use amount of the device increases is present; a deciding unit configured to determine whether maintenance work is to be performed on the device in a case where the determining unit determines that the period during which the use amount of the device increases is present and to decide details of the maintenance work; and an outputting unit configured to output the details of the maintenance work. The deciding unit decides the details of the maintenance work including at least one of a check item name that is in accordance with the device and a replacement component name that is in accordance with a predicted use amount of the device in the period.
Opening claim text (preview).
What is claimed is: 1. An information processing system including at least one information processing apparatus, the information processing system comprising: a memory; and a processor that is coupled to the memory and that is configured to determine, based on use amounts, for predetermined respective past periods, of a device, whether a period during which a use amount of the device increased is present among the past periods; determine whether maintenance work is to be performed on the device upon determining that the period during which the use amount of the device increased is present and to decide details of the maintenance work based on a result determined; output the details of the maintenance work when the details of the maintenance work for the device are decided; predict, based on the use amounts for the respective past periods, a future use amount of the device for a future busy period; and report the details of the maintenance work to an electronic apparatus, used by a workman who performs the maintenance work for the device, to display the details of the maintenance work, wherein the processor decides the details of the maintenance work including at least one of a check item name that is in accordance with the device and a replacement component name of a component of the device that is in accordance with a predicted future use amount of the device in the future busy period. 2. The information processing system according to claim 1 , wherein the period during which the use amount of the device increased is present based on the use amounts for respective past months of the device. 3. The information processing system according to claim 1 , wherein the use amounts are print volumes of the device. 4. The information processing system according to claim 1 , wherein the processor determines whether the maintenance work is to be performed on the device based on a check condition, which represents a condition of a case of requiring a predetermined check, and device information, which represents operating status of the device, and wherein, in a case where the device information satisfies the check condition, the processor decides the details of the maintenance work including the check item name corresponding to the predetermined check. 5. The information processing system according to claim 1 , wherein the processor determines, for each component included in the device, whether the maintenance work is to be performed on the device based on a maximum use amount of the component and the predicted future use amount of the device in the future busy period, and wherein, in a case where the predicted use amount exceeds the maximum use amount, the processor decides the details of the maintenance work including the replacement component name corresponding to the component. 6. The information processing system according to claim 1 , wherein, when the details of the maintenance work for the device are decided, the outputting unit reports the details of the maintenance work to the electronic apparatus that the workman, who performs the maintenance work for the device, uses. 7. The information processing system according to claim 1 , wherein the processor determines, for each device, whether the period during which the use amount of the device increased is present, and wherein the processor determines, for each device, whether the maintenance work is to be performed on the device when the processor determines that the period during which the use amount of the device increased is present and decides, for each device, the details of the maintenance work based on the result determined. 8. The information processing system according to claim 1 , wherein the processor is configured to determine whether the component of the device is to be replaced based on the future use amount and a remaining amount of the component, and wherein, when the future use amount exceeds the remaining amount, the processor is configured to determined that the component is to be replaced. 9. The information processing system according to claim 8 , wherein, when the processor determines that the component is to be replaced, the processor is configured to display, on the electronic apparatus, a screen including the replacement component name of the component to be replaced. 10. The information processing system according to claim 1 , wherein the processor is configured to calculate an average of the use amounts for the predetermined respective past periods, and wherein the use amount of the busy period, during which the use amount of the device increased, is larger than the average by a predetermined amount or more. 11. An information processing method executed by a computer including a memory and a processor coupled to the memory, the information processing method comprising: determining, based on use amounts, for predetermined respective past periods, of a device, whether a period during which an use amount of the device increased is present among the past periods; determining whether maintenance work is to be performed on the device upon determining that the period during which the use amount of the device increased is present; deciding details of the maintenance work based on a result determined; outputting the details of the maintenance when the details of the maintenance work for the device are decided; predicting, based on the use amounts for the respective past periods, a future use amount of the device for a future busy period; and reporting the details of the maintenance work to an electronic apparatus, used by a workman who performs the maintenance work for the device, to display the details of the maintenance work, wherein the details of the maintenance work includes at least one of a check item name that is in accordance with the device and a replacement component name of a component of the device that is in accordance with a predicted future use amount of the device in the future busy period are decided. 12. A non-transitory computer readable storage medium storing a program for causing a computer including a memory and a processor coupled to the memory to execute a process, the process comprising: determining, based on use amounts, for predetermined respective past periods, of a device, whether a period during which an use amount of the device increased is present among the past periods; determining whether maintenance work is to be performed on the device upon determining that the period during which the use amount of the device increased is present and deciding details of the maintenance work based on a result determined; and outputting the details of the maintenance when the details of the maintenance work for the device are decided; predicting, based on the use amounts for the respective past periods, a future use amount of the device for a future busy period; and reporting the details of the maintenance work to an electronic apparatus, used by a workman who performs the maintenance work for the device, to display the details of the maintenance work, wherein the details of the maintenance work includes at least one of a check item name that is in accordance with the device and a replacement component name of a component of the device that is in accordance with a predicted future use amount of the device in the future busy period.
with a management, maintenance, service or repair apparatus (monitoring H04N1/00002) · CPC title
with a measuring, monitoring or signaling apparatus, e.g. for transmitting measured information to a central location · CPC title
Recording use, e.g. counting number of pages copied · CPC title
Multifunctional device, i.e. a device capable of all of reading, reproducing, copying, facsimile transception, file transception · CPC title
Scheduling, planning or task assignment for a person or group · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.