Inductor protection during fast transient response in isolated voltage converters

US9929663B1 · US · B1

Patent metadata
FieldValue
Publication numberUS-9929663-B1
Application numberUS-201715445595-A
CountryUS
Kind codeB1
Filing dateFeb 28, 2017
Priority dateFeb 28, 2017
Publication dateMar 27, 2018
Grant dateMar 27, 2018

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Techniques are provided for controlling power switches that couple an input power source to a transformer within a voltage converter, in order to control the power transfer through the transformer and to a load of the voltage converter. Different techniques are provided for different operational modes. In an initial steady-state interval, the switches are switched using a fixed first switching period and variable duty cycle. Upon detecting a load transient, e.g., a sudden increase in the load power requirements, a ramp-up interval is entered during which the switches are switched using a second switching period and a second duty cycle, in order to increase the output current of the converter at a maximum rate. Upon detecting that a current within the voltage converter has reached a maximum allowed level, a current-limited interval is entered during which the switches are switched using a third switching period and a third duty cycle.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of controlling an isolated voltage converter that comprises primary side switches coupled to a transformer having a transformer core, and an output inductor interposed between the transformer and a load of the isolated voltage converter, the method comprising: switching the primary side switches using a first switching period and a first duty cycle during an initial steady state interval; detecting a load transient event associated with an increased power requirement of the load; responsive to detecting the load transient event, switching the primary side switches using a second switching period and a second duty cycle, such that a current flowing through the output inductor is increased at a maximum allowable rate during a ramp-up interval, so as to accommodate the increased power requirement of the load; during the ramp-up interval, detecting that the current has reached a maximum current threshold; and responsive to detecting that the current has reached the maximum current threshold, switching the primary side switches using a third switching period and a third duty cycle, during a current-limited interval, in order to maintain the current within a ripple current band between the maximum current threshold and a reduced current threshold, wherein the third duty cycle differs from the second duty cycle. 2. The method of claim 1 , wherein the third switching period is different from the second switching period. 3. The method of claim 1 , further comprising: subsequent to switching the primary side switches using the third switching period and the third duty cycle, switching the primary side switches using the first switching period and the first duty cycle, in response to detecting that the increased power requirement of the load is being met, wherein the first switching period differs from the third switching period. 4. The method of claim 1 , further comprising: subsequent to switching the primary side switches using the third switching period and the third duty cycle, generating a recovery pulse to switch the primary side switches, the recovery pulse having a recovery pulse polarity and a recovery pulse width that are determined such that a magnetic flux density of the transformer core is returned to a level of magnetic flux density that existed in the transformer core at the beginning of the ramp-up interval. 5. The method of claim 4 , further comprising: tracking an estimate of the magnetic flux density of the transformer core during the ramp-up interval and the current-limited interval; and determining the recovery pulse polarity and the recovery pulse width based upon the tracked estimate of the magnetic flux density of the transformer core. 6. The method of claim 1 , wherein the first switching period is a fixed value and the first duty cycle is variable, the first duty cycle being varied within a regulating duty cycle range so as to regulate a voltage provided by the isolated voltage converter to the load, wherein the second switching period is different than the first switching period, and the second duty cycle is greater than a maximum duty cycle within the regulating duty cycle range, wherein the maximum allowable rate of current increase is based upon the second switching period and the second duty cycle, and wherein at least one of the second switching period and the second duty cycle are determined based upon a maximum allowable magnetic flux density within the transformer core. 7. The method of claim 1 , wherein the second switching period is equal to the first switching period as used by a linear control technique during the initial steady state interval, wherein the first duty cycle is variable, the first duty cycle being varied within a regulating duty cycle range having a maximum duty cycle that is allowable during the initial steady state interval, wherein the maximum allowable rate of current increase is based upon the first switching period and the maximum duty cycle, and wherein the maximum allowable duty cycle is based upon a maximum allowable magnetic flux density within the transformer core. 8. The method of claim 1 , wherein the third switching period and the third duty cycle are determined based upon a maximum width for the ripple current band. 9. The method of claim 8 , wherein the width of the current ripple band varies with an input voltage of the isolated voltage converter. 10. The method of claim 1 , wherein the maximum current threshold is based upon a maximum current rating for the output inductor. 11. An isolated voltage converter configured to provide output power to a load, and comprising: primary side switches; a transformer coupled to the primary side switches and having a transformer core; an output inductor interposed between the transformer and the load; and a controller configured to: switch the primary side switches using a first switching period and a first duty cycle during an initial steady state interval; detect a load transient event associated with an increased power requirement of the load; responsive to detection of the load transient event, switch the primary side switches using a second switching period and a second duty cycle, such that a current flowing through the output inductor is increased at a maximum allowable rate during a ramp-up interval, so as to accommodate the increased power requirement of the load; during the ramp-up interval, detect that the current has reached a maximum current threshold; and responsive to detection that the current has reached the maximum current threshold, switch the primary side switches using a third switching period and a third duty cycle, during a current-limited interval, in order to maintain the current within a ripple current band between the maximum current threshold and a reduced current threshold, wherein the third duty cycle differs from the second duty cycle. 12. The isolated voltage converter of claim 11 , wherein the third switching period is different from the second switching period. 13. The isolated voltage converter of claim 11 , wherein the controller is further configured to: subsequent to switching the primary side switches using the third switching period and the third duty cycle, switch the primary side switches using the first switching period and the first duty cycle, in response to detecting that the increased power requirement of the load is being met, wherein the first switching period differs from the third switching period. 14. The isolated voltage converter of claim 11 , wherein the controller is further configured to: subsequent to switching the primary side switches using the third switching period and the third duty cycle, generate a recovery pulse to switch the primary side switches, the recovery pulse having a recovery pulse polarity and a recovery pulse width that are determined such that a magnetic flux density of the transformer core is returned to a level of magnetic flux density that existed in the transformer core at the beginning of the ramp-up interval. 15. The isolated voltage converter of claim 14 , wherein the controller is further configured to: track an estimate of the magnetic flux density of the transformer core during the ramp-up interval and the current-limited interval; and determine the recovery pulse polarity and the recovery pulse width based upon the tracked estimate of the magnetic flux density of the transformer core. 16. The isolated voltage converter of claim 11 , wherein the first switching period is a fixed value and the first duty cycle is variable, and the controller is

Assignees

Inventors

Classifications

  • having a synchronous rectifier circuit or a synchronous freewheeling circuit at the secondary side of an isolation transformer · CPC title

  • Circuits specially adapted for the generation of control voltages for semiconductor devices incorporated in static converters · CPC title

  • Means for providing current step on switching, e.g. with saturable reactor · CPC title

  • Electricity · mapped topic

  • Electricity · mapped topic

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9929663B1 cover?
Techniques are provided for controlling power switches that couple an input power source to a transformer within a voltage converter, in order to control the power transfer through the transformer and to a load of the voltage converter. Different techniques are provided for different operational modes. In an initial steady-state interval, the switches are switched using a fixed first switching …
Who is the assignee on this patent?
Infineon Technologies Austria Ag
What technology area does this patent fall under?
Primary CPC classification H02M3/33592. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Mar 27 2018 00:00:00 GMT+0000 (Coordinated Universal Time) (B1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).