Apparatus for monitoring leakage current of transformer-less photovoltaic inverter
US-2015311862-A1 · Oct 29, 2015 · US
US9923483B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9923483-B2 |
| Application number | US-201615163329-A |
| Country | US |
| Kind code | B2 |
| Filing date | May 24, 2016 |
| Priority date | Nov 25, 2013 |
| Publication date | Mar 20, 2018 |
| Grant date | Mar 20, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method of operating a transformerless inverter connected on the input side to a generator and on the output side to a multiphase AC grid and comprising a multi-phase inverter bridge with a switch between a midpoint of a DC intermediate circuit on the input side and a terminal for a neutral conductor of the multiphase AC grid, includes feeding electric power from the DC intermediate circuit into the AC grid by the inverter bridge with the switch closed when first operating conditions are present, and opening the switch when there is a transition from the first operating conditions to second operating conditions different from the first operating conditions. The method further includes feeding electric power from the DC intermediate circuit into the AC grid by the inverter bridge with the switch open when the second operating conditions are present, and closing the switch when there is a transition from the second operating conditions to the first operating conditions.
Opening claim text (preview).
The invention claimed is: 1. A method of operating a transformerless inverter connected on the input side to a generator and on the output side to a multiphase AC grid and comprising a multi-phase inverter bridge with a switch between a midpoint of a DC intermediate circuit on the input side and a terminal for a neutral conductor of the multiphase AC grid, comprising: feeding electric power from the DC intermediate circuit into the AC grid by the inverter bridge with the switch closed when first operating conditions are present; opening the switch when there is a transition from the first operating conditions to second operating conditions different from the first operating conditions; feeding electric power from the DC intermediate circuit into the AC grid by the inverter bridge with the switch open when the second operating conditions are present; and closing the switch when there is a transition from the second operating conditions to the first operating conditions. 2. The method according to claim 1 , wherein the second operating conditions comprise at least one of the following operating conditions: a residual current or leakage current measured at the inverter maintains a first current limit when the switch is open, a residual current or leakage current measured at the inverter maintains a second current limit when the switch is closed, a leakage capacitance determined for the generator connected to the DC intermediate circuit maintains a capacitance limit, an intermediate circuit voltage of the DC intermediate circuit does not reach a double value of the peak phase-to-neutral line voltage of the AC grid, and a symmetric feed into all phase conductors of the AC grid is intended. 3. The method according to claim 2 , wherein the first operating conditions comprise at least one of the following operating conditions: the residual current or leakage current measured at the inverter exceeds the first current limit when the switch is open, the residual current or leakage current measured at the inverter exceeds the second current limit when the switch is closed, the leakage capacitance determined for the generator connected to the DC intermediate circuit exceeds the capacitance limit, and an asymmetric feed into the phase conductors of the AC grid is intended. 4. The method according to claim 1 , further comprising reducing a residual current or leakage current measured at the inverter when the switch is open by increasing an intermediate circuit voltage of the DC intermediate circuit from above a peak phase-to-phase line voltage to above a double value of the peak phase-to-neutral line voltage of the AC grid. 5. A transformerless inverter with a DC intermediate circuit on the input side, a multiphase inverter bridge, input-side terminals for a generator, output-side terminals for a multiphase AC grid, a switch between a midpoint of the input-side DC intermediate circuit and the terminal for a neutral conductor of the multiphase AC grid and with a controller controlling the inverter bridge and the switch, wherein the controller is configured to: feed electric power from the DC intermediate circuit into the AC grid by the inverter bridge with the switch closed when first operating conditions are present; open the switch when there is a transition from the first operating conditions to second operating conditions different from the first operating conditions; feed electric power from the DC intermediate circuit into the AC grid by the inverter bridge with the switch open when the second operating conditions are present; and close the switch when there is a transition from the second operating conditions to the first operating conditions. 6. An inverter according to claim 5 , further comprising a measuring device comprising a residual current sensor that is operably coupled to the controller and configured to measure a residual current at the inverter or a leakage current of the generator connected on the input side to the inverter. 7. The inverter according to claim 5 , wherein the inverter bridge comprises a multi-level circuit with bidirectional switches between the midpoint of the DC intermediate circuit and midpoints of the half-bridges of the inverter bridge. 8. The inverter according to claim 5 , wherein the switch is arranged in a line connecting the midpoint of the DC intermediate circuit to the terminal for the neutral conductor at a point located between first capacitors being connected to the line and lines leading from the inverter bridge to terminals for the phase conductors of the AC grid and second capacitors of the inverter that are connected to the line and the lines leading to the terminals for the phase conductors. 9. The inverter according to claim 8 , further comprising a further switch in each line leading from the inverter bridge to the terminals for the phase conductors of the AC grid.
Photovoltaics · CPC title
using passive filters · CPC title
using semiconductor devices only · CPC title
Neutral point clamped inverters · CPC title
Cross-Sectional Technologies · mapped topic
Related publications grouped by family.
Answers are generated from the same data shown on this page.