Machine tool, tool load displaying method for machine tool, and non-transitory computer-readable storage medium
US-12135537-B2 · Nov 5, 2024 · US
US9910424B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9910424-B2 |
| Application number | US-201214436615-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 29, 2012 |
| Priority date | Oct 29, 2012 |
| Publication date | Mar 6, 2018 |
| Grant date | Mar 6, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An automatic monitoring interval-setting device, a machine tool, and an automatic monitoring interval-setting method by which a monitoring interval monitoring a load applied to a tool is able to be automatically set are provided. An automatic monitoring interval-setting device includes a control device including a memory section which stores a program including G 1 to G 3 for processing a workpiece by using a tool, and a calculating section which is able to edit the program and executes a monitoring interval setting step of respectively inserting starting monitoring of a load applied to the tool into the front of G 1 to G 3 and ending the monitoring of the load into the rear of G 1 to G 3 with respect to the program.
Opening claim text (preview).
The invention claimed is: 1. An automatic monitoring interval-setting device, comprising: a control device including a memory section which stores a program including a processing command processing a workpiece by using a tool to be monitored, and a calculating section which is able to automatically edit the program to execute a monitoring interval setting step, the monitoring interval setting step including determining whether the processing command of the tool to be monitored is included in a current row of the program, inserting a monitoring starting command starting monitoring of a load applied to the tool into a row of the program prior to the current row of the program including the processing command of the tool to be monitored, when the calculating section determines that the processing command of the tool to be monitored in included in the current row of the program, and inserting a monitoring ending command ending the monitoring of the load into a row of the program subsequent to the row of the program including the processing command, wherein control device is configured to change the load applied to the tool when the monitored load applied to the tool during the monitoring interval is greater than a predetermined value, wherein when the program includes a plurality of successive processing commands, the calculating section respectively inserts the monitoring starting command into a row of the program prior to a row of the program including the first processing command and the monitoring ending command into a row of the program subsequent to a row of the program including the last processing command with respect to the program, in the monitoring interval setting step, wherein the automatic monitoring interval-setting device further comprises a display device which is able to display data relevant to the program, and wherein the calculating section respectively inserts a display starting command starting display of the load on the display device and a display ending command ending the display of the load such that the monitoring starting command and the monitoring ending command are inserted between the display starting command and the display ending command with respect to the program, in the monitoring interval setting step. 2. The automatic monitoring interval-setting device according to claim 1 , wherein the calculating section executes a program selecting step of selecting the program which inserts the monitoring starting command and the monitoring ending command from a plurality of programs, before the monitoring interval setting step. 3. The automatic monitoring interval-setting device according to claim 1 , wherein the calculating section executes a tool selecting step of selecting the tool which inserts the monitoring starting command and the monitoring ending command from a plurality of tools, before the monitoring interval setting step. 4. The automatic monitoring interval-setting device according to claim 1 , wherein the calculating section executes an inspecting step of inspecting the monitoring starting command and the monitoring ending command which are inserted into the program, after the monitoring interval setting step. 5. The automatic monitoring interval-setting device according to claim 1 , wherein the calculating section executes a saving step of storing the program into which the monitoring starting command and the monitoring ending command are inserted in the memory section, after the monitoring interval setting step. 6. The automatic monitoring interval-setting device according to claim 1 , wherein the processing command is a G code, and wherein the monitoring starting command and the monitoring ending command are M codes which are different from each other. 7. A machine tool comprising the automatic monitoring interval-setting device according to claim 1 . 8. An automatic monitoring interval-setting method, comprising: providing a program including a processing command processing a workpiece by using a tool to be monitored; automatically editing the program to execute a monitoring interval setting step, the monitoring interval setting step including determining whether the processing command of the tool to be monitored is included in a current row of the program, inserting a monitoring starting command starting monitoring of a load applied to a tool into a row of the program prior to the current row of the program including the processing command of the tool to be monitored, when the calculating section determines that the processing command of the tool to be monitored in included in the current row of the program, and inserting a monitoring ending command ending the monitoring of the load into a row of the program subsequent to the row of the program including the processing command; and changing the load applied to the tool when the monitored load applied to the tool during the monitoring interval is greater than a predetermined value, wherein when the program includes a plurality of successive processing commands, the monitoring starting command is inserted into a row of the program prior to a row of the program including the first processing command and the monitoring ending command is inserted into a row of the program subsequent to a row of the program including the last processing command, respectively, with respect to the program, in the monitoring interval setting step, and wherein a display starting command starting display of the load on a display device which is able to display data relevant to the program and a display ending command ending the display of the load are respectively inserted such that the monitoring starting command and the monitoring ending command are inserted between the display starting command and the display ending command with respect to the program, in the monitoring interval setting step. 9. The automatic monitoring interval-setting method according to claim 8 , further comprising: a program selecting step of selecting the program which inserts the monitoring starting command and the monitoring ending command from a plurality of programs, before the monitoring interval setting step. 10. The automatic monitoring interval-setting method according to claim 8 , further comprising: a tool selecting step of selecting the tool which inserts the monitoring starting command and the monitoring ending command from a plurality of tools, before the monitoring interval setting step. 11. The automatic monitoring interval-setting method according to claim 8 , further comprising: an inspecting step of inspecting the monitoring starting command and the monitoring ending command which are inserted into the program, after the monitoring interval setting step. 12. The automatic monitoring interval-setting method according to claim 8 , further comprising: a saving step of storing the program into which the monitoring starting command and the monitoring ending command are inserted, after the monitoring interval setting step. 13. The automatic monitoring interval-setting method according to claim 8 , wherein the processing command is a G code, and wherein the monitoring starting command and the monitoring ending command are M codes which are different from each other.
Monitoring tool breakage, life or condition · CPC title
Monitoring, detect failures, control of efficiency of machine, tool life · CPC title
during machining · CPC title
Tool monitoring integrated in nc control · CPC title
Adapt, modify program as function of configuration of machine · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.