Systems and methods for measuring inductor current in a switching DC-to-DC converter

US9853539B1 · US · B1

Patent metadata
FieldValue
Publication numberUS-9853539-B1
Application numberUS-201414243261-A
CountryUS
Kind codeB1
Filing dateApr 2, 2014
Priority dateApr 8, 2013
Publication dateDec 26, 2017
Grant dateDec 26, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A switch control circuit may be utilized for a sequence of switching events occurring in an order of a first event, a second event, a third event, and a fourth event: the first event to activate the first switch and deactivate the second switch wherein an inductor current increases during the first event and has a positive value at an end of the first event, the second event to deactivate the first switch and activate the second switch wherein the switch control circuit maintains the current above zero during the second event, the third event to activate the first switch and deactivate the second switch, and the fourth event to deactivate the first switch and activate the second switch wherein the current decreases to a value below zero at an end of the fourth event and when the current reaches zero, a zero crossing time point is defined.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of operating a direct current-to-direct current (DC-DC) switch converter, comprising: operating the DC-DC switch converter in a continuous conduction mode, wherein the DC-DC switch converter comprises a switch control circuit that controls a first switch and a second switch; sensing an inductor current of an inductor coupled to the first switch and the second switch; utilizing the switch control circuit for a sequence of switching events wherein the switching events are events that occur in an order of a first event, a second event, a third event, and a fourth event for: performing the first event to activate the first switch and deactivate the second switch wherein the inductor current increases during the first event and has a positive value at an end of the first event; performing the second event to deactivate the first switch and activate the second switch wherein the switch control circuit maintains the inductor current above zero during the second event; performing the third event to activate the first switch and deactivate the second switch; and performing the fourth event to deactivate the first switch and activate the second switch wherein the inductor current decreases to a value below zero at an end of the fourth event and when the inductor current reaches zero, a zero crossing time point is defined, and wherein the first event, the second event, the third event, and the fourth event occur in immediately successive order and are repeated during consecutively successive periods of time; and measuring a time period from the zero crossing time point relative to a time point within the sequence of switching events. 2. The method of claim 1 , wherein the DC-DC switch converter is operated to determine an average inductor current within the DC-DC switch converter. 3. The method of claim 2 , wherein performing the fourth event to deactivate the first switch and activate the second switch, further comprises: activating the second switch for a period of time wherein the inductor current decreases to a value below zero; detecting the zero crossing time point for the inductor current; and after detecting the zero crossing time point, further controlling the first switch and the second switch so that the average inductor current is maintained. 4. The method of claim 3 , wherein detecting the zero crossing time point, further comprises: comparing, by a comparator, a voltage across the second switch to detect when the inductor current is zero. 5. The method of claim 4 , wherein the comparator is in the switch control circuit. 6. The method of claim 3 , wherein: when the first switch is activated, the first switch is activated for a first turn-on time period while the second switch is deactivated; when the second switch is activated, the second switch is activated for a second turn-on time period while the first switch is deactivated; and the first turn-on time and the second turn-on time define a plurality of switching periods, wherein each switching period comprises the first turn-on time period and the second turn-on time period. 7. The method of claim 6 , wherein activating the second switch for a period of time, further comprises: maintaining the second switch as activated for an additional time period that is a multiple of the second turn-on time period, wherein the multiple can be either an integer or a half integer and the additional time period ensures the inductor current decreases to a value below zero. 8. The method of claim 7 , wherein after detecting the zero crossing time point, further controlling the first switch and second switch, further comprises: activating the first switch for a first time period that equals a product of the multiple times two plus one and the first turn-on time period while the second switch is deactivated; and activating the second switch for a second time period that equals a product of the multiple plus one and the second turn-on time period while the first switch is deactivated. 9. The method of claim 6 , wherein: measuring a time period from the zero crossing time point further comprises: measuring the time period from the zero crossing time point to an end of a first occurrence of the second turn-on time period during the fourth event; and operating the DC-DC switch converter to determine an average inductor current within a DC-DC switch converter, further comprises: deriving the average inductor current by using the time period, the second turn-on time period, an output voltage of the DC-DC switch converter, and an inductance value of the inductor. 10. The method of claim 9 , wherein deriving the average inductor current, further comprises: deriving the average inductor current by multiplying a quotient of the output voltage and the inductance value by a sum of the time period and a half of the second turn-on time period. 11. The method of claim 6 , wherein performing the fourth event to deactivate the first switch and activate the second switch further comprises operating the DC-DC switch converter in a measurement phase and further comprises after operating the DC-DC switch converter in a measurement phase, operating the DC-DC switch converter in a prediction phase by: selecting a jth switching period from an n number of the switching periods wherein jth corresponds to an integer j that is greater than zero and less than or equal to n and wherein n is an integer greater than zero; and deriving the average inductor current for the jth switching period by using the average inductor current derived in the measurement phase, an output voltage of the DC-DC switch converter, each of the first turn-on time periods for a first switching period through the jth switching period, the switching period, an input voltage of the DC-DC switch converter, and an inductance value of the inductor. 12. The method of claim 11 , wherein deriving the average inductor current for the jth switching period, further comprises: deriving the average inductor current for the jth switching period in accordance with the following equation: Im=Io+V out× T×M/L×Σ n=1 . . . j (ton1 n /T−M ); wherein: Im is the average inductor current for the jth switching period; Io is the inductor current derived in the measurement phase; M is equal to Vout/Vin wherein Vout is the output voltage and Vin is the input voltage; T is the switching period; L is the inductance value of the inductor; and ton 1 n is each of the first turn-on time periods for a first switching period through the jth switching period. 13. The method of claim 1 , wherein the DC-DC switch converter is operated to determine a peak current in the DC-DC switch converter. 14. The method of claim 1 , wherein the DC-DC switch converter is operated to determine an inductance of the inductor in the DC-DC switch converter. 15. The method of claim 1 , wherein the DC-DC switch converter is operated to measure an input voltage of the DC-DC switch converter. 16. The method of claim 1 , wherein polarity of the inductor current is such that the inductor current is positive when flowing from the inductor through the second switch. 17. The method of claim 1 , wherein the first event occurs for a first duration of time, the second event occurs for a second duration of time, the third event occurs for the first duration of time, and the fourth event occurs for an integer multiple of the second duration of time. 18. A direct current-to-direct current (DC-DC) switch converter, comprising: a switch control circuit coupled to a first swit

Assignees

Inventors

Classifications

  • H02M3/04Primary

    by static converters · CPC title

  • H02M3/156Primary

    with automatic control of output voltage or current, e.g. switching regulators · CPC title

  • Devices or circuits for detecting current in a converter · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9853539B1 cover?
A switch control circuit may be utilized for a sequence of switching events occurring in an order of a first event, a second event, a third event, and a fourth event: the first event to activate the first switch and deactivate the second switch wherein an inductor current increases during the first event and has a positive value at an end of the first event, the second event to deactivate the f…
Who is the assignee on this patent?
Cirrus Logic Inc
What technology area does this patent fall under?
Primary CPC classification H02M3/04. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Dec 26 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).