System and method to operate radio of aircraft to connect to radio towers according to command and control communication plan
US-2024282198-A1 · Aug 22, 2024 · US
US9848366B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9848366-B2 |
| Application number | US-201113822873-A |
| Country | US |
| Kind code | B2 |
| Filing date | Sep 21, 2011 |
| Priority date | Sep 21, 2010 |
| Publication date | Dec 19, 2017 |
| Grant date | Dec 19, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for determining relocation process and a method for determining handover process are proposed in the present invention. Wherein the method for determining relocation process includes: informing, by a home base station (HNB) gateway (GW) or an operation, administration and maintenance (OAM) device, the HNB of information of whether the HNB GW supports an optimized relocation process; determining, by the HNB, the relocation process to be implemented for the user equipment (UE) according to the information of whether the HNB GW supports the optimized relocation process. The methods according to the present invention may reduce the failure probability of the relocation/handover and improve the relocation/handover efficiency.
Opening claim text (preview).
The invention claimed is: 1. A method for operating a home base station, the method comprising: receiving, from a home base station gateway (GW), information indicating whether the home base station GW supports an optimized relocation process through a registration process of the home base station, the optimized relocation process being performed without a core network (CN); and starting to perform, in response to receiving the information indicating that the home base station G…
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.