Battery management system, battery management method, and terminal device
US-2024116392-A1 · Apr 11, 2024 · US
US9843209B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9843209-B2 |
| Application number | US-201514831185-A |
| Country | US |
| Kind code | B2 |
| Filing date | Aug 20, 2015 |
| Priority date | Jul 29, 2011 |
| Publication date | Dec 12, 2017 |
| Grant date | Dec 12, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
According to one embodiment, a storage system includes storage devices configured to execute communication by using an identifier, a converter configured to convert the identifier of the storage devices, a controller configured to execute communication with the storage devices via the converter by using the identifier converted by the converter, convert a DC power output from the storage devices into a DC power of a predetermined magnitude and output the DC power, and charge the storage devices with the DC power of the predetermined magnitude, an AC/DC converter configured to convert the DC power output from the controller into an AC power, convert an AC power supplied from a distribution system into a DC power and supply the DC power to the controller, and a controller configured to control the controller and the AC/DC converter.
Opening claim text (preview).
The invention claimed is: 1. A storage system comprising: a plurality of storage devices configured to execute communication by using a Control Area Network (CAN) identifier; a converter configured to convert the CAN identifier of each of the plurality of storage devices and create an IP address of each of the storage devices; a charge/discharge controller configured to execute communication with the plurality of storage devices via the converter by using the identifier converted by the converter, convert a DC power output from the plurality of storage devices into a DC power of a predetermined magnitude and output the DC power, and charge the storage devices with the DC power of the predetermined magnitude; an AC/DC converter configured to convert the DC power output from the charge/discharge controller into an AC power; convert an AC power supplied from a distribution system into a DC power and supply the DC power to the charge/discharge controller; a controller configured to control the charge/discharge controller and the AC/DC converter; an Ethernet communication line to which the converter and the controller are connected; a second converter intervening between the charge/discharge controller and the Ethernet communication line, configured to convert the CAN identifier of the charge/discharge controller and create an IP address of the charge/discharge controller, and a third converter intervening between the AC/DC converter and the Ethernet communication line, configured to convert the CAN identifier of the AC/DC converter and create the IP address of the AC/DC converter. 2. The storage system of claim 1 , wherein the converter comprises a rotary switch which sets a number to be used upon converting the identifier. 3. The storage system of claim 1 , further comprising connection units configured to make connection between the Ethernet communication line and an external device.
exchanging power with electric vehicles [EV] or with hybrid electric vehicles [HEV] · CPC title
for transfer of electric power between AC and DC networks, e.g. for supplying the DC section within a load from an AC mains system · CPC title
of the battery · CPC title
Battery or charger load switching, e.g. concurrent charging and load supply (H02J7/50 takes precedence) · CPC title
in response to battery voltage · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.