Methods for formulating a cement slurry for use in a subterranean salt formation
US-2016258246-A1 · Sep 8, 2016 · US
US9822639B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9822639-B2 |
| Application number | US-201515300098-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 10, 2015 |
| Priority date | May 30, 2014 |
| Publication date | Nov 21, 2017 |
| Grant date | Nov 21, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Methods including experimentally determining a salt creep profile for a single salt or intercalated salts in a subterranean formation, designing a proposed cement slurry based on the salt creep profile, experimentally determining whether the proposed cement slurry is capable of forming a wellbore load resistant cement sheath based on actual thermal and thermo-mechanical properties of the proposed cement slurry, theoretically determining whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath by designing an electronic, cross-section geometric model of the subterranean salt formation and simulating a condition of the wellbore loads on the cured proposed cement slurry using the geometric model, establishing a final cement slurry capable of forming the wellbore load resistant cement sheath, and performing a final cementing operation with the final cement slurry in the subterranean salt formation.
Opening claim text (preview).
The invention claimed is: 1. A method comprising: (a) providing a wellbore in a subterranean salt formation, wherein the subterranean salt formation comprises a single salt at a first location; (b) experimentally determining a salt creep profile for the single salt at the first location in the wellbore in the subterranean formation; (c) designing a proposed cement slurry based on the salt creep profile, the proposed cement slurry having a rheology profile, wherein the proposed cement slurry is designed for use in a proposed cementing operation involving forming a wellbore load resistant cement sheath within an annulus between the subterranean salt formation and casing, and wherein the wellbore load resistant cement sheath is resistant to wellbore loads; (d) experimentally determining whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath at the first location based on actual thermal and thermo-mechanical properties of the proposed cement slurry; (e) theoretically determining whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath at the first location, the theoretical determination comprising: (e)(1) designing an electronic, cross-section geometric model of the subterranean salt formation at the first location, wherein the geometric model represents the subterranean salt formation, the casing, and the proposed cement slurry after curing, and (e)(2) simulating a plane-strain condition of the wellbore loads on the cured proposed cement slurry at the first location in the subterranean formation using the geometric model, (f) establishing a final cement slurry capable of forming the wellbore load resistant cement sheath; and (g) performing a final cementing operation with the final cement slurry in the subterranean salt formation. 2. The method of claim 1 , wherein the salt creep profile in step (b) is experimentally determined by a method selected from the group consisting of: (b1) obtaining at least one wellbore core sample of the wellbore in the subterranean formation at the first location, and performing a core sample salt creep load measurement using the wellbore core sample, (b2) performing a downhole salt creep load measurement at the first location in the wellbore in the subterranean formation, (b3) obtaining an offset well salt creep load measurement and performing a parametric analysis thereon, wherein the offset well and the wellbore in the subterranean salt formation are located in a same oil field, and any combination thereof. 3. The method of claim 1 , wherein whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath in step (d) is experimentally determined by a method selected from the group consisting of: (d1) curing the proposed cement slurry, and performing an ultrasonic cement analyzer test on the cured proposed cement slurry, (d2) curing the proposed cement slurry, and performing uniaxial and triaxial compression tests on the cured proposed cement slurry, and any combination thereof. 4. The method of claim 1 , wherein the plane-strain condition of the wellbore loads on the cured proposed cement slurry at the first location in the subterranean formation using the geometric model in step (e)(2) is simulated based the wellbore loads and one or both of: theoretical thermal and thermo-mechanical properties of the cured proposed cement slurry, or the actual thermal and thermo-mechanical properties of the cured proposed cement slurry in step (d). 5. The method of claim 4 , wherein step (e) is performed before step (d), wherein step (e)(2) is simulated based on the theoretical thermal and thermo-mechanical properties, and further comprising repeating a second step (e) after step (d) wherein the second step (e) comprises step (e)(2) of simulation based on the actual theoretical thermal and thermo-mechanical properties in step (d). 6. The method of claim 1 , further comprising either performing step (d) before step (e), or performing step (e) before step (d). 7. The method of claim 1 , further comprising manipulating the proposed cement slurry after step (d), and repeating steps (d) through (e) until the proposed cement slurry is capable of forming the wellbore load resistant cement sheath. 8. The method of claim 1 , further comprising manipulating the proposed cement slurry after step (e), and repeating steps (d) through (e) until the proposed cement slurry is capable of forming the wellbore load resistant cement sheath. 9. The method of claim 1 , further comprising a tubular extending into the wellbore in the subterranean salt formation, and a pump fluidly coupled to the tubular; and wherein step (g) is performed by introducing the final cement slurry into the wellbore through the tubular. 10. A method comprising: (a) providing a wellbore in a subterranean salt formation, wherein the subterranean salt formation comprises intercalated salts along a first length of the wellbore; (b) experimentally determining a salt creep profile for the intercalated salts at the first length of the wellbore in the subterranean formation; (c) designing a proposed cement slurry based on the salt creep profile, the proposed cement slurry having a rheology profile, wherein the proposed cement slurry is designed for use in a proposed cementing operation involving forming a wellbore load resistant cement sheath within an annulus between the subterranean salt formation and casing, and wherein the wellbore load resistant cement sheath is resistant to wellbore loads; (d) experimentally determining whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath at the first length based on actual thermal and thermo-mechanical properties of the proposed cement slurry; (e) theoretically determining whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath at the first length, the theoretical determination comprising: (e)(1) designing an electronic, longitudinal geometric model of the subterranean salt formation at the first length, wherein the geometric model represents the subterranean salt formation, the casing, and the proposed cement slurry after curing, and (e)(2) simulating an axisymmetric condition or a three-dimensional condition of the wellbore loads on the cured proposed cement slurry at the first location in the subterranean formation using the geometric model, (f) establishing a final cement slurry capable of forming the wellbore load resistant cement sheath; and (g) performing a final cementing operation with the final cement slurry in the subterranean salt formation. 11. The method of claim 10 , wherein the salt creep profile in step (b) is experimentally determined by a method selected from the group consisting of: (b1) obtaining at least one wellbore core sample of the wellbore in the subterranean formation at the first length, and performing a core sample salt creep load measurement using the wellbore core sample, (b2) performing a downhole salt creep load measurement at the first length in the wellbore in the subterranean formation, (b3) obtaining an offset well salt creep load measurement and performing a parametric analysis thereon, wherein the offset well and the wellbore in the subterranean salt formation are located in a same oil field, and any combination thereof. 12. The method of claim 10 , wherein whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath in step (d) is experimentally determined by a method selected from the group consisting of: (d1) curing the proposed cement slurry, and pe
by analysing drilling variables or conditions (E21B49/005 takes precedence; systems specially adapted for monitoring a plurality of drilling variables or conditions E21B44/00) · CPC title
Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines · CPC title
Spacer compositions, e.g. compositions used to separate well-drilling from cementing masses · CPC title
Methods or devices for cementing, for plugging holes, crevices or the like · CPC title
specially adapted for well-logging · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.