Conditioning device and method for drying and controlling the temperature of a ballast bed
US-8938887-B2 · Jan 27, 2015 · US
US9822491B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9822491-B2 |
| Application number | US-201314441015-A |
| Country | US |
| Kind code | B2 |
| Filing date | Nov 8, 2013 |
| Priority date | Nov 9, 2012 |
| Publication date | Nov 21, 2017 |
| Grant date | Nov 21, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method is provided for foaming a ballast bed of a railway track wherein the railway track comprises sleepers positioned on the ballast bed and rails positioned on the sleepers, wherein the rails are covered at least in a partial area along a region of the ballast bed to be foamed, and a foaming agent is introduced into the ballast bed while the rails are covered, wherein the ballast bed has in a sleeper bay defined by two successive sleepers an upper side facing against the gravitational direction, and the ballast bed is heaped up so that the upper side of the ballast bed reaches at least up to an underneath side of the sleeper facing in the gravitational direction.
Opening claim text (preview).
The invention claimed is: 1. A method for foaming a ballast bed of a railway track, wherein the railway track comprises sleepers placed on the ballast bed, and rails, placed on the sleepers, wherein the rails are covered with at least one cover at least along one region of the ballast bed which is to be foamed, and a foaming agent is introduced into the ballast bed whilst the rails are covered, wherein the ballast bed has in a sleeper bay defined by two successive sleepers an upper side facing against the gravitational direction, and the ballast bed is heaped up so that the upper side of the ballast bed is positioned at a level above an underside of the sleeper facing in the gravitational direction, wherein the foaming agent is applied from an outlet at a level above a running surface of the rail wherein the level is maintained substantially constant for foaming two successive sleeper bays. 2. The method according to claim 1 in which the level of the upper side of the ballast bed in the sleeper bay corresponds substantially to the nominal operating level of the ballast bed in the sleeper bay during regular rail traffic operation. 3. The method according to claim 1 wherein at least the rail and/or the sleeper is covered with at least one cover aligned inclined relative to the gravitational direction. 4. The method according to claim 3 wherein the cover and/or the covering hood has at least one guide for continuously entraining the covering hood and/or the cover on the rail. 5. The method according to claim 3 wherein the cover plate and/or the covering hood has a repellent means for repelling foaming agent. 6. The method according to claim 5 wherein the repellent means is more particularly designed as a coating. 7. The method according to claim 1 wherein at least the rail and/or the sleeper is covered by a covering hood wherein the covering hood comprises a first cover and a second cover connected at an angle to the first cover. 8. The method according to claim 1 wherein the foaming agent is introduced so far into the ballast bed that after the foaming of the foaming agent the resulting foam remains in the sleeper bay substantially completely below the upper side of the ballast bed. 9. The method according to claim 1 wherein the dispensing of the foaming agent can be interrupted when passing over a rail and/or from one sleeper bay to a following sleeper bay. 10. The method according to claim 1 wherein the foaming agent is applied by a railway vehicle travelling on the rails of the railway track, wherein the railway vehicle for foaming the ballast bed of the railway track moves forwards substantially continuously, more particularly at a constant travelling speed.
Related publications grouped by family.
Answers are generated from the same data shown on this page.