Cryopump system
US-2015121907-A1 · May 7, 2015 · US
US9810208B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9810208-B2 |
| Application number | US-201414206510-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 12, 2014 |
| Priority date | Mar 12, 2013 |
| Publication date | Nov 7, 2017 |
| Grant date | Nov 7, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method of regenerating a cryopump includes a first discharging process that includes alternately evacuating a cryopump housing and supplying a purge gas in a first pressure range, and a second discharging process that includes evacuating the cryopump housing to a low pressure region below the first pressure range. The second discharging process includes making a determination at least once in the low pressure range as to whether the second discharging process should be terminated, and supplying the purge gas to the cryopump housing prior to a first-time determination as to whether the second discharging process should be terminated.
Opening claim text (preview).
What is claimed is: 1. A cryopump comprising: a cryopanel; a cryopump housing arranged to enclose the cryopanel; a control unit configured to control evacuation of the cryopump housing and supply of a purge gas to the cryopump housing for full regeneration of the cryopanel, wherein the control unit is configured to perform: a first rough-and-purge process that includes alternately performing a first rough-and-purge evacuating of the cryopump housing and a first rough-and-purge supplying of the purge gas in a first pressure range, and a second rough-and-purge process that includes, subsequent to the first rough-and-purge process, alternately and cyclically repeating a second rough-and-purge evacuating of the cryopump housing to a low pressure region below the first pressure range and a second rough-and-purge supplying of the purge gas to the cryopump housing, and wherein the second rough-and-purge process includes making a determination at least once in the low pressure region as to whether the second rough-and-purge process should be terminated, and a plurality of cycles of the alternately and cyclically repeating of the second rough-and-purge evacuating of the cryopump housing and the second rough-and-purge supplying of the purge gas to the cryopump housing are performed prior to a first-time determination as to whether the second rough-and-purge process should be terminated. 2. The cryopump according to claim 1 , wherein the control unit sequentially performs termination of the first rough-and-purge process, the second rough-and-purge evacuating of the cryopump housing from the first pressure range to the low pressure region, and the second rough-and-purge supplying of the purge gas to the cryopump housing. 3. The cryopump according to claim 1 , wherein the control unit terminates the second rough-and-purge supplying of the purge gas based on a measured pressure in the cryopump housing. 4. The cryopump according to claim 1 , wherein the control unit performs, prior to the first rough-and-purge process, a temperature-raising process that includes heating the cryopanel to a regeneration temperature, which is higher than a cooling temperature of a cryopump vacuum pumping operation. 5. The cryopump according to claim 1 , wherein the control unit performs, after the second rough-and-purge process, a cool down process that includes cooling the cryopanel to a cooling temperature of a cryopump vacuum pumping operation. 6. The cryopump according to claim 1 , wherein the control unit performs, if the first-time determination as to whether the second rough-and-purge process should be terminated is failed, a further plurality of cycles of the second rough-and-purge evacuating of the cryopump housing and the second rough-and-purge supplying of the purge gas to the cryopump housing prior to a second-time determination as to whether the second rough-and-purge process should be terminated. 7. A cryopump full regeneration method comprising: a first rough-and-purge process that includes alternately performing a first rough-and-purge evacuating of a cryopump housing and a first rough-and-purge supplying of a purge gas in a first pressure range, and a second rough-and-purge process that includes, subsequent to the first rough-and-purge process, alternately and cyclically repeating a second evacuating of the cryopump housing to a low pressure region below the first pressure range and a second rough-and-purge supplying of the purge gas to the cryopump housing, wherein the second rough-and-purge process includes making a determination at least once in the low pressure region as to whether the second rough-and-purge process should be terminated, and a plurality of cycles of the alternately and cyclically repeating of the second rough-and-purge evacuating of the cryopump housing and the second rough-and-purge supplying of the purge gas to the cryopump housing are performed prior to a first-time determination as to whether the second rough-and-purge process should be terminated. 8. The method according to claim 7 , wherein termination of the first rough-and-purge process, the second rough-and-purge evacuating of the cryopump housing from the first pressure range to the low pressure region, and the second rough-and-purge supplying of the purge gas to the cryopump housing are sequentially performed. 9. The method according to claim 7 , wherein the second rough-and-purge supplying of the purge gas is terminated based on a measured pressure in the cryopump housing. 10. The method according to claim 7 , further comprising: prior to the first rough-and-purge process, a temperature-raising process that includes heating a cryopanel to a regeneration temperature, which is higher than a cooling temperature of a cryopump vacuum pumping operation. 11. The method according to claim 7 , further comprising: after the second rough-and-purge process, a cool down process that includes cooling a cryopanel to a cooling temperature of a cryopump vacuum pumping operation.
by condensing or freezing, e.g. cryogenic pumps · CPC title
Regeneration of cryo-pumps · CPC title
Cold traps; Cold baffles (pumps for evacuating by condensing or freezing F04B37/08) · CPC title
Pumps having pertinent characteristics not provided for in, or of interest apart from, groups F04B25/00 - F04B35/00 · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.