Trip predictor algorithm
US-2024061412-A1 · Feb 22, 2024 · US
US9804209B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9804209-B2 |
| Application number | US-201214382058-A |
| Country | US |
| Kind code | B2 |
| Filing date | Feb 29, 2012 |
| Priority date | Feb 29, 2012 |
| Publication date | Oct 31, 2017 |
| Grant date | Oct 31, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method and a device are provided for monitoring an electrical power supply network. A temporal frequency change value is determined for at least two sections or for at least two points of the power supply network. The frequency change value indicates the respective temporal frequency change of the network frequency. A conclusion is drawn regarding a possible islanding within the power supply network, and a warning signal which indicates the possible islanding within the power supply network is generated when the difference between the frequency change values, exceeds a predetermined frequency change threshold value.
Opening claim text (preview).
The invention claimed is: 1. A method of monitoring an electrical power supply network, the method comprising: determining by a measuring instrument a temporal frequency change value for at least two sections of the power supply network or for at least two points of the power supply network, the change value indicating a respective temporal frequency change in a network frequency; and if a difference between the frequency change values exceeds a predetermined frequency change threshold value, drawing by a central device a conclusion regarding possible islanding within the power supply network and generating and outputting a warning signal indicating the possible islanding within the power supply network; if a difference between the frequency values exceeds a predetermined frequency threshold value, drawing by the central device a conclusion regarding the existence of islanding within the power supply network and generating an islanding signal indicating islanding within the power supply network; and after forming the islanding signal by the central device, resetting or switching off the islanding signal only if: the difference between the frequency values falls below a predetermined first resetting threshold value; and the difference between the temporal frequency change values falls below a predetermined second resetting threshold value. 2. The method according to claim 1 , which comprises: measuring the network frequencies for each of the at least two sections or the at least two points of the power supply network by forming a time-dependent frequency value; and forming a derivative of the time-dependent frequency values with respect to time by forming one of the temporal frequency change values respectively. 3. The method according to claim 1 , wherein the first resetting threshold value matches the frequency threshold value or is less than the frequency threshold value. 4. The method according to claim 1 , wherein the second resetting threshold value matches the frequency change threshold value or is less than the frequency change threshold value. 5. The method according to claim 1 , which comprises generating a pre-warning signal indicating possible islanding within the power supply network if the difference between the frequency values exceeds a predetermined pre-warning threshold value. 6. The method according to claim 1 , which comprises: determining at least one pointer measured value, the respective frequency value pertaining to the pointer measured value and the respective temporal frequency change values in each case by a pointer-type measuring instrument in the at least two sections or at the at least two points of the power supply network; transmitting the frequency values and the frequency change values to the central device; and evaluating the received frequency values and the received frequency change values with the central device and generating the warning signal and/or the islanding signal as a function of the received frequency values and the received frequency change values. 7. An arrangement for monitoring an electrical power supply network, the arrangement comprising: at least one measuring instrument respectively disposed in each of at least two sections or at each of at least two points of the power supply network, said measuring instruments being configured for determining a frequency value indicating a respective network frequency and/or a temporal frequency change value indicating a respective temporal frequency change in a network frequency; and a central device configured: to draw a conclusion regarding possible islanding within the power supply network and to generate a warning signal indicating the possible islanding within the power supply network if a difference between the frequency change values exceeds a predetermined frequency change threshold value; and to draw a conclusion regarding the existence of islanding within the power supply network and generating an islanding signal indicating islanding within the power supply network if the difference between the frequency values exceeds a predetermined frequency threshold value; and after forming the islanding signal, to reset or switch off the islanding signal only if: the difference between the frequency values falls below a predetermined first resetting threshold value; and the difference between the temporal frequency change values falls below a predetermined second resetting threshold value. 8. The arrangement according to claim 7 , wherein said central device is a device separate from said measuring instruments and is connected by a communications link to said measuring instruments. 9. The arrangement according to claim 7 , wherein said central device is integrated in a measuring instrument or forms part of one of said measuring instruments. 10. The central device for the arrangement according to claim 7 , the central device comprising: a computing device configured for receiving from at least two measuring instruments one temporal frequency change value respectively, indicating a respective temporal frequency change in a network frequency, and/or for determining the temporal frequency change values from measured values of the at least two measuring instruments and for generating the warning signal indicating possible islanding within the power supply network if the difference between the frequency change values exceeds the predetermined frequency change threshold value. 11. In an electrical power supply network having measuring instruments disposed to measure in different sections or points of the power supply network frequency values indicating a network frequency and/or a temporal frequency change value indicating a temporal frequency change in the network frequency, a central device, comprising: a computing device configured for receiving from the measuring instruments, signals representing the network frequency and/or temporal frequency change values for the different sections or points in the power supply network and for generating a warning signal indicating possible islanding within the power supply network if a difference between the frequency change values exceeds a predetermined frequency change threshold value, and for generating an islanding signal indicating islanding within the power supply network if the difference between the frequency values exceeds a predetermined frequency threshold value, and, after forming the islanding signal, resetting or switching off the islanding signal only if: the difference between the frequency values falls below a predetermined first resetting threshold value; and the difference between the temporal frequency change values falls below a predetermined second resetting threshold value.
using phasor measuring units [PMU] · CPC title
Monitoring network conditions, e.g. electrical magnitudes or operational status · CPC title
characterised by displaying of information or by user interaction, e.g. supervisory control and data acquisition [SCADA] systems · CPC title
Oscillations concerning frequency · CPC title
Arrangements for the handling of islanding, e.g. for disconnection or for avoiding the disconnection of power · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.