Steam turbine

US9803504B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9803504-B2
Application numberUS-201615080333-A
CountryUS
Kind codeB2
Filing dateMar 24, 2016
Priority dateAug 24, 2015
Publication dateOct 31, 2017
Grant dateOct 31, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A steam turbine includes a boiler unit, first supply pipes, a second supply pipe, a plurality of valve units, a drain valve unit, and a controller. The controller is configured to control, before rotation of the turbine starts, an operation time and temperature of the auxiliary boiler so that the temperatures of the high-pressure turbine and the intermediate-pressure turbine are increased to the first setting temperature. The controller is configured to control, when the temperatures of the high-pressure turbine and the intermediate-pressure turbine are maintained at the first setting temperature, operation of the main boiler such that the temperature of the intermediate-pressure turbine reaches a second setting temperature while operation of the auxiliary boiler is interrupted, and control, when the temperature of the intermediate-pressure turbine is maintained at the second setting temperature, the operation of the main boiler such that steam is supplied only to the high-pressure turbine.

First claim

Opening claim text (preview).

What is claimed is: 1. A steam turbine, comprising: a boiler unit including an auxiliary boiler and a main boiler that supply steam to a high-pressure turbine and an intermediate-pressure turbine; first supply pipes diverging from the auxiliary boiler and respectively extending to the high-pressure turbine and the intermediate-pressure turbine; a second supply pipe coupled with the high-pressure turbine, the intermediate-pressure turbine, and a condenser so that steam supplied through the first supply pipes is transferred to the condenser via the high-pressure turbine and the intermediate-pressure turbine; a plurality of valve units respectively disposed on each of the first supply pipes and configured to be operated when the auxiliary boiler is operated; a drain valve unit disposed on the second supply pipe and configured to discharge condensate water that has passed through the high-pressure turbine and the intermediate-pressure turbine; and a controller configured to control an opening amount of each of the valve units and the drain valve unit and to control an operation state of the boiler unit based on a first setting temperature to which temperatures of the high-pressure turbine and the intermediate-pressure turbine are preset, wherein the controller is configured to control, before rotation of the intermediate-pressure turbine starts, an operation time and temperature of the auxiliary boiler so that the temperatures of the high-pressure turbine and the intermediate-pressure turbine are increased to the first setting temperature, and the controller is configured to control, after determining that the temperatures of the high-pressure turbine and the intermediate-pressure turbine are maintained at the first setting temperature, operation of the main boiler such that the temperature of the intermediate-pressure turbine reaches a second setting temperature while operation of the auxiliary boiler is interrupted, and the controller is configured to control, after determining that the temperature of the intermediate-pressure turbine is maintained at the second setting temperature, the operation of the main boiler such that steam is supplied to the high-pressure turbine. 2. The steam turbine according to claim 1 , wherein the controller is configured to control, when controlling the auxiliary boiler such that steam is supplied to the high-pressure turbine and the intermediate-pressure turbine, a temperature of the auxiliary boiler such that the auxiliary boiler is operated at an allowed maximum temperature. 3. The steam turbine according to claim 1 , wherein lengths to which the first supply pipes respectively extend to the high-pressure turbine and the intermediate-pressure turbine are equal to each other. 4. The steam turbine according to claim 1 , further comprising: a first temperature sensor configured to sense the temperature of the high-pressure turbine; and a second temperature sensor configured to sense the temperature of the intermediate-pressure turbine. 5. The steam turbine according to claim 4 , wherein the controller is configured to receive temperature data sensed by the first temperature sensor and the second temperature sensor and determines the temperatures of the high-pressure turbine and the intermediate-pressure turbine. 6. The steam turbine according to claim 1 , further comprising a third supply pipe having a first end coupled to the main boiler and a second end extending to the high-pressure turbine and the intermediate-pressure turbine. 7. The steam turbine according to claim 6 , wherein the third supply pipe includes a stop valve that is disposed adjacent to the main boiler and is operable to interrupt transfer of steam, and a check valve that selectively prevents steam supplied to the high-pressure turbine and the intermediate-pressure turbine from being transferred to the main boiler. 8. A method of preheating a steam turbine, comprising: supplying, simultaneously and before rotation of the turbine starts, steam to a high-pressure turbine and an intermediate-pressure turbine provided in the turbine; operating, after the rotation of the turbine starts, the high-pressure turbine, the intermediate-pressure turbine and a low-pressure turbine to maintain temperatures of the high-pressure turbine and the intermediate-pressure turbine at a predetermined first setting temperature; supplying steam to the intermediate-pressure turbine after the temperature of the intermediate-pressure turbine reaches the first setting temperature; and interrupting, after determining that the temperature of the intermediate-pressure turbine is maintained at a second setting temperature, the supply of steam to the intermediate-pressure turbine, and supplying steam to the high-pressure turbine. 9. The method according to claim 8 , wherein the supplying before rotation includes supplying steam to the high-pressure turbine and the intermediate-pressure turbine at a maximum temperature depending on a capacity of the auxiliary boiler provided to supply steam to the high-pressure turbine and the intermediate-pressure turbine. 10. The method according to claim 8 , wherein the supplying of the steam only to the intermediate-pressure turbine includes operating, after operation of the auxiliary boiler is interrupted, the main boiler, and supplying steam only to the intermediate-pressure turbine. 11. The method according to claim 8 , wherein the supplying of the steam only to the intermediate-pressure turbine includes controlling temperature, pressure and flow rate of steam generated from the main boiler, to be variable depending on a power generation rate of a generator provided in the turbine. 12. The method according to claim 8 , further comprising, after the supplying of the steam only to the intermediate-pressure turbine, bypassing and supplying some of steam generated from the main boiler to the low-pressure turbine or other accessory devices.

Assignees

Inventors

Classifications

  • F01K13/02Primary

    Controlling, e.g. stopping or starting · CPC title

  • with heating by separately-fired heaters · CPC title

  • by means of valves, e.g. for steam turbines (valves in general F16K) · CPC title

  • structurally associated with turbines or similar engines · CPC title

  • Controlling means specially adapted therefor · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9803504B2 cover?
A steam turbine includes a boiler unit, first supply pipes, a second supply pipe, a plurality of valve units, a drain valve unit, and a controller. The controller is configured to control, before rotation of the turbine starts, an operation time and temperature of the auxiliary boiler so that the temperatures of the high-pressure turbine and the intermediate-pressure turbine are increased to th…
Who is the assignee on this patent?
Doosan Heavy Ind Constr Co Ltd, Doosan Heavy Ind & Construction Co Ltd
What technology area does this patent fall under?
Primary CPC classification F01K13/02. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Oct 31 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.