Rapid deployment frac water transfer system

US9790776B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9790776-B2
Application numberUS-201615188057-A
CountryUS
Kind codeB2
Filing dateJun 21, 2016
Priority dateNov 16, 2010
Publication dateOct 17, 2017
Grant dateOct 17, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Methods, systems, and computer program products are provided for rapid deployment and retrieval of a frac water transfer system.

First claim

Opening claim text (preview).

The invention claimed is: 1. A system for transferring frac water between a source of the frac water and a frac water destination, the system comprising: a portable frac water delivery subsystem, the portable frac water delivery subsystem comprising: one or more segments of a lay flat hose; one or more tracked carriers for transporting the lay flat hose, the one or more tracked carriers each comprising: a tensioning subsystem for flattening the one or more segments of the lay flat hose to be wound onto one or more spools, the one or more segments of the lay flat hose connected in series to assemble one or more pipelines for transferring the frac water from the source of the frac water to the frac water destination. 2. The system of claim 1 , the one or more tracked carriers each further comprising a lifting subsystem for loading the one or more spools onto the tracked carrier and/or offloading the one or more spools from the tracked carrier, the lifting subsystem comprising: an arm, the arm selectively engaging the one or more spools; one or more linkages connecting the arm to the tracked carrier; and one or more hydraulic cylinders for controlling the movement of the one or more linkages. 3. The system of claim 2 , the tensioning subsystem further comprising: a drive subsystem for rotating the one or more spools; a plurality of rollers selectively engaging the one or more segments of the lay flat hose, the drive subsystem selectively activated to wind the one or more segments of the lay flat hose onto the one or more spools, the one or more segments of the lay flat hose routed through the plurality of rollers in an alternating over and under configuration. 4. The system of claim 3 , the tensioning subsystem substantially removing water from the one or more segments of the lay flat hose. 5. The system of claim 1 , the subsystem for determining one or more characteristics of the frac water transfer system further comprising: means for measuring one or more terrain parameters between the frac water source and the frac water destination; and means for designing a pipeline to be assembled between the frac water source and the frac water destination, the means for designing receiving the one or more terrain parameters as input and generating output data, the output data presented as a set of pressure profiles reflecting one or more measurements relating to one or more characteristics of the pipeline to be assembled. 6. The system of claim 1 , further comprising one or more conveyance vehicles for transporting equipment between an equipment storage site and the frac water source and/or the frac water destination, the equipment comprising the one or more spools. 7. A method of deploying a system for transferring frac water between a source of the frac water and a frac water destination, the method comprising: deploying a portable frac water delivery subsystem, the portable frac water delivery subsystem comprising: one or more segments of a lay flat hose; one or more tracked carriers for transporting the lay flat hose, the one or more tracked carriers each comprising: a tensioning subsystem for flattening the one or more segments of the lay flat hose to be wound onto one or more spools; assembling one or more pipelines for transferring the frac water from the source of the frac water to the frac water destination. 8. The method of claim 7 , further comprising conveying one or more spools to the frac water source and/or the frac water destination, the one or more spools wound with the one or more segments of the lay flat hose. 9. The method of claim 7 , further comprising loading the one or more spools onto the one or more tracked carriers and/or offloading the one or more spools from the one or more tracked carriers, each tracked carrier further comprising a lifting subsystem, the lifting subsystem comprising: an arm, the arm selectively engaging the one or more spools; one or more linkages connecting the arm to the tracked carrier; and one or more hydraulic cylinders for controlling the movement of the one or more linkages. 10. The method of claim 9 , further comprising retrieving the one or more segments of the lay flat hose from the ground, comprising: selectively engaging the tensioning subsystem with the one or more segments of the lay flat hose, tensioning subsystem further comprising: a plurality of rollers; and a drive subsystem for rotating the one or more spools; routing the one or more segments of the lay flat hose through the plurality of rollers; and winding the one or more segments of the lay flat hose onto the one or more spools. 11. The method of claim 10 , the retrieving the one or more segments of the lay flat hose from the ground further comprising substantially removing water from the one or more segments of the lay flat hose. 12. The method of claim 7 , the assembling the pipeline further comprising connecting a plurality of segments of the lay flat hose in series, the ends of the segments of the lay flat hose fitted with sexless couplings.

Assignees

Inventors

Classifications

  • above ground (F16L1/026 takes precedence) · CPC title

  • attached to, or forming part of a vehicle, e.g. truck, trailer, vessel · CPC title

  • Systems · CPC title

  • Cleaning, repairing, or assembling · CPC title

  • With hose storage or retrieval means · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9790776B2 cover?
Methods, systems, and computer program products are provided for rapid deployment and retrieval of a frac water transfer system.
Who is the assignee on this patent?
Tetra Tech
What technology area does this patent fall under?
Primary CPC classification E21B43/26. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Oct 17 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).