Subcritical pressure high-temperature steam power plant and subcritical pressure high-temperature variable pressure operation once-through boiler

US9784137B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9784137-B2
Application numberUS-201314019802-A
CountryUS
Kind codeB2
Filing dateSep 6, 2013
Priority dateOct 25, 2012
Publication dateOct 10, 2017
Grant dateOct 10, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A subcritical pressure high-temperature steam power plant includes a combustion boiler system, steam turbine generator system, and condensate and feedwater system and wherein the conditions of steam generated in the boiler system and supplied to the steam turbine generator system are subcritical pressure and high temperature (turbine inlet temperature of 593° C. or more).

First claim

Opening claim text (preview).

The invention claimed is: 1. A subcritical pressure high-temperature steam power plant comprising: a combustion boiler system; a steam turbine generator system; and a condensate and feedwater system, the subcritical pressure high-temperature steam power plant having a rated output in a range of 0.1 million kW to 0.4 million kW, the combustion boiler system including a high-temperature superheater configured to supply superheated steam with steam conditions of subcritical pressure and 593° C. or more, the subcritical pressure being 16.6 MPa or more, and a high-temperature reheater configured to supply reheated steam with steam conditions of 593° C. or more, and the steam turbine generator system including a high-pressure steam turbine provided with an initial blade cascade having a height and shape, the high-pressure steam turbine with the initial blade cascade being configured to be driven by the superheated steam with the steam conditions of subcritical pressure of 16.6 MPa or more and 593° C. or more and a reheat intermediate-pressure steam turbine to be driven by the reheated steam with the steam conditions of 593° C. or more. 2. The subcritical pressure high-temperature steam power plant according to claim 1 , wherein the combustion boiler system is a powdered-coal combustion boiler which uses coal as main fuel and also a variable pressure operation once-through boiler which uses a boiler furnace water wall of a once-through spiral type. 3. The subcritical pressure high-temperature steam power plant according to claim 2 , wherein the combustion boiler system burns biomass or by-product gas of steelmaking process with coal, as the fuel. 4. The subcritical pressure high-temperature steam power plant according to claim 2 , wherein the combustion boiler system comprises a plurality of combustion burners arranged in a plurality of stages with combustion burners arranged on opposite sides in each stage and a plurality of coal mills each of which is provided for each of the stages and distributes fuel to the combustion burners arranged on opposite sides in each stage. 5. The subcritical pressure high-temperature steam power plant according to claim 2 , wherein a spiral water wall tube constituting the furnace water wall is inclined 10 to 20 degrees from a horizontal direction.

Assignees

Inventors

Classifications

  • the engines being of turbine type · CPC title

  • using waste heat from outside the plant (F02G5/00 takes precedence) · CPC title

  • Controlling superheat temperature · CPC title

  • Carbon dioxide (F01K25/065 takes precedence) · CPC title

  • Once through boilers · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9784137B2 cover?
A subcritical pressure high-temperature steam power plant includes a combustion boiler system, steam turbine generator system, and condensate and feedwater system and wherein the conditions of steam generated in the boiler system and supplied to the steam turbine generator system are subcritical pressure and high temperature (turbine inlet temperature of 593° C. or more).
Who is the assignee on this patent?
Mitsubishi Hitachi Power Sys
What technology area does this patent fall under?
Primary CPC classification F01K13/006. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Oct 10 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).