Tubless proppant blending system for high and low pressure blending

US9784080B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9784080-B2
Application numberUS-201615145523-A
CountryUS
Kind codeB2
Filing dateMay 3, 2016
Priority dateApr 8, 2013
Publication dateOct 10, 2017
Grant dateOct 10, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Fracturing slurries are prepared on the fly using a solids pump to feed the solid such as a gel into a liquid stream of normally water for pumping downhole with a large capacity triplex pump. The solids pump is preferably a Posimetric® style which delivers the solid into the fluid pipeline in a manner that keeps fluid from backing into the solids hopper above the solids pump. A separate fluid tank is connected to a fluid pump to pressurize a suction line to a boost pump before reaching the triplex pump and pumping into the subterranean formation. The solids pump can deliver between the fluid and boost pumps in which case the solids go through the triplex pump or alternatively the solids can be delivered into the higher pressure discharge line of the triplex pump.

First claim

Opening claim text (preview).

We claim: 1. A borehole treating method, comprising: making a slurry on the fly by injecting a solid in a dry state with a solids pump into a pressurized fluid pipe for initial fluid mixing in said pipe on a discharge side of an injection pump without an intervening blending tank; pumping said slurry with said injection pump to a subterranean formation; and treating in or from the borehole. 2. The method of claim 1 , comprising: using a Posimetric® pump as said solids pump. 3. The method of claim 1 , comprising: using water, a polymer based gel, non-aqueous fluid, foam, nitrogen gas, liquid CO2, or LNG as said fluid. 4. The method of claim 1 , comprising: using sand, powdered dry cement, diverters, breakers, or a dry chemical additive as said solid. 5. The method of claim 1 , comprising: performing as said treating at least one selected from the group consisting of cementing, acidizing, gravel packing, sand control, and solids disposal of drill cuttings. 6. The method of claim 1 , comprising: providing a fluid storage vessel and associated fluid pump to remove the fluid from the vessel; and directing the discharge of said fluid pump to the suction of a booster pump; directing a discharge of said booster pump to a suction of said injection pump. 7. The method of claim 6 , comprising: injecting the solid into a pressurized conduit between said fluid and booster pumps. 8. The method of claim 7 , comprising: providing a line from a solids pump discharge connection into the pressurized conduit between said fluid and booster pumps. 9. The method of claim 7 , comprising: discharging solids from said discharge connection on the solids pump at the pressurized conduit between said fluid and booster pumps. 10. The method of claim 1 , comprising: using a treating pump at a surface location for said pumping. 11. The method of claim 10 , comprising: injecting said solid downstream of said treating pump. 12. The method of claim 11 , comprising: using a booster pump upstream of said treating pump to pressurize fluid from a storage vessel. 13. The method of claim 11 , comprising: connecting the discharge of said solids pump directly or indirectly to the pressurized fluid conduit downstream of said treating pump. 14. The method of claim 13 , comprising: using a Posimetric® pump as said solids pump. 15. The method of claim 10 , comprising: injecting said solid upstream of said treating pump.

Assignees

Inventors

Classifications

  • E21B43/16Primary

    Enhanced recovery methods for obtaining hydrocarbons · CPC title

  • by mixing components · CPC title

  • Gravelling of wells · CPC title

  • Methods or devices for cementing, for plugging holes, crevices or the like · CPC title

  • E21B43/267Primary

    reinforcing fractures by propping · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9784080B2 cover?
Fracturing slurries are prepared on the fly using a solids pump to feed the solid such as a gel into a liquid stream of normally water for pumping downhole with a large capacity triplex pump. The solids pump is preferably a Posimetric® style which delivers the solid into the fluid pipeline in a manner that keeps fluid from backing into the solids hopper above the solids pump. A separate fluid t…
Who is the assignee on this patent?
Baker Hughes Inc
What technology area does this patent fall under?
Primary CPC classification E21B43/16. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Oct 10 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).