Generator management system and method that selectively activate at least one of a plurality of generators in a power generation system

US9778632B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9778632-B2
Application numberUS-201414251057-A
CountryUS
Kind codeB2
Filing dateApr 11, 2014
Priority dateJul 2, 2012
Publication dateOct 3, 2017
Grant dateOct 3, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method of determining an operation of at least one of a plurality of generators in a power generation system. The method includes identifying a system parameter that is related to operation of the power generation system; and determining which of the plurality of generators to operate to minimize fuel consumption of the power generation system based on the system parameter. Other methods include identifying a system parameter that is related to operation of the power generation system; and determining which of the plurality of generators to operate by optimizing an operating variable of the power generation system based on the system parameter.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of determining an operation of at least one of a plurality of generators in a power generation system comprising: identifying a system parameter that is related to operation of the power generation system using a controller; and determining which of the plurality of generators to operate to minimize fuel consumption of the power generation system based on the system parameter, wherein determining which of the plurality of generators to activate or deactivate to minimize fuel consumption of the power generation system based on the system parameter includes calculating expected fuel consumption for each possible permutation of active generators in the plurality of generators based on the system parameter. 2. The method of claim 1 wherein calculating expected fuel consumption for each possible permutation of active generators in the plurality of generators includes calculating fuel consumption for each generator in the plurality of generators. 3. The method of claim 1 wherein calculating fuel consumption for each possible permutation of active generators in the plurality of generators includes obtaining data from fuel efficiency curves that indicate fuel consumption for each possible permutation of active generators in the plurality of generators. 4. The method of claim 1 wherein calculating fuel consumption for each possible permutation of active generators in the plurality of generators includes measuring fuel consumption for each generator in the plurality of generators. 5. The method of claim 1 wherein measuring fuel consumption for each generator in the plurality of generators includes storing fuel consumption data and utilizing fuel consumption data in determining which of the plurality of generators to activate or deactivate in order to minimize fuel consumption of the power generation system. 6. A generator management system comprising: a plurality of generators that are adapted to supply power to a load; and a control system that operates the plurality of generators, wherein the control system determines which of the plurality of generators to activate or deactivate based on a system parameter in order to minimize fuel consumption of the power generation system, wherein the control system calculates fuel consumption for each possible permutation of active generators in the plurality of generators. 7. The generator management system of claim 6 further comprising a server that is connected to the control system via a network, wherein at least one of the control system and the server determines which of the plurality of generators to activate or deactivate based on the system parameter in order to minimize fuel consumption of the power generation system. 8. The generator management system of claim 6 wherein the control system includes a generator controller that controls operation of at least one of a plurality of generators. 9. The generator management system of claim 6 wherein the control system anticipates the load that is to be supplied with power by the plurality of generators. 10. The generator management system of claim 6 wherein the control system maintains a minimum load that is set by local emissions standards on at least one of the plurality of generators. 11. The generator management system of claim 6 wherein the control system measures the fuel consumption of each possible permutation of active generators in the plurality of generators. 12. The generator management system of claim 6 wherein at least one generator in the plurality of generators is different in size, fuel efficiency or fuel type than the other generators in the plurality of generators. 13. The generator management system of claim 6 wherein the control system includes a plurality of generator controllers that are each configured to control at least one generator.

Assignees

Inventors

Classifications

  • Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel · CPC title

  • G05B15/02Primary

    electric · CPC title

  • H02P9/02Primary

    Details {of the control} · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9778632B2 cover?
A method of determining an operation of at least one of a plurality of generators in a power generation system. The method includes identifying a system parameter that is related to operation of the power generation system; and determining which of the plurality of generators to operate to minimize fuel consumption of the power generation system based on the system parameter. Other methods incl…
Who is the assignee on this patent?
Kohler Co
What technology area does this patent fall under?
Primary CPC classification G05B15/02. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Oct 03 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).