System and method for controlling voltage at point of common coupling of wind farm
US-9217419-B2 · Dec 22, 2015 · US
US9759189B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9759189-B2 |
| Application number | US-201114234738-A |
| Country | US |
| Kind code | B2 |
| Filing date | Aug 11, 2011 |
| Priority date | Aug 11, 2011 |
| Publication date | Sep 12, 2017 |
| Grant date | Sep 12, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A wind power plant comprises at least a first and one or more other wind turbine generators ( 10, 20, 30, 40 ), wherein the first and one or more other wind turbine generators are communicatively coupled in order to exchange information between the first wind turbine generator and the one or more other wind turbine generators, and wherein a predetermined transfer relationship is established between the first and one or more other wind turbine generators, said predetermined transfer relationship indicating the degree to which the first wind turbine generator may use information from each of the one or more other wind turbine generator for the control of the first wind turbine.
Opening claim text (preview).
What is claimed is: 1. A wind power plant comprising at least a first wind turbine generator and one or more other wind turbine generators, wherein the first wind turbine generator and one or more other wind turbine generators are communicatively coupled to exchange information between the first wind turbine generator and the one or more other wind turbine generators, and wherein a predetermined transfer relationship is established between the first wind turbine generator and one or more other wind turbine generators, said predetermined transfer relationship indicating transfer values associated with different wind directions, the transfer values indicating a degree to which the first wind turbine generator uses information from each of the one or more other wind turbine generators for the control of the first wind turbine generator for the associated different wind directions. 2. A wind power plant according to claim 1 , wherein the information to be exchanged between the first wind turbine generator and one or more other wind turbine generators is a signal comprising aerodynamic information and/or condition information. 3. A wind power plant according to claim 2 , wherein the condition information comprises information on one or more of the following states: disconnection of the wind power plant from the electrical grid; lightening; tripping of wind turbine generator; an extreme wind gust; a faulty sensor; and grid power characteristics. 4. A wind power plant according to claim 2 , wherein the aerodynamic information comprises information on one or more of the following: wind direction; wind speed; wind shear; wind turbulence; wind gust depth; and temperature. 5. A wind power plant according to claim 1 , wherein the transfer value for potential wind directions in the predetermined relationship corresponding to the present wind direction is multiplied with a signal from the one or more other wind turbine generators in order to render a signal for use in the control unit of the first wind turbine generator. 6. A wind power plant according to claim 1 , wherein the transfer value comprises information specific transfer values for specific types of information. 7. A wind power plant according to claim 1 , wherein the predetermined transfer relationship depends upon wind characteristics at the first wind turbine generator and/or at the one or more other wind turbine generators. 8. A wind power plant according to claim 1 , wherein the predetermined transfer relationship depends upon the terrain wherein the first wind turbine generator and/or one or more other wind turbine generator(s) is/are located. 9. A wind power plant according to claim 1 , wherein the predetermined transfer relationship is stored in a control unit of the first wind turbine generator or in a SCADA server accessible by the first wind turbine generator. 10. A wind power plant according to claim 1 , wherein the predetermined transfer relationship is determined before operation of the wind power plant and/or wherein the predetermined transfer relationship is updated periodically. 11. A wind power plant according to claim 1 , wherein the first wind turbine generator further is communicatively coupled to a meteorological measuring mast comprising one or more meteorological sensors to exchange information and wherein a meteorological mast transfer relationship has been established, said meteorological mast transfer relationship indicating the degree to which the first wind turbine generator may use information from the meteorological mast. 12. A method of controlling a first wind turbine generator in a wind power plant, comprising one or more other wind turbine generators, the method comprising: at the first wind turbine generator, receiving information from one or more other wind turbine generators via a communicative coupling; and controlling the first wind turbine generator using information from the one or more other wind turbines generators according to a predetermined transfer relationship between the first wind turbine generator and each of the one or more other wind turbine generators, said predetermined transfer relationship indicating transfer values associated with different wind directions, the transfer values indicating a degree to which the first wind turbine generator may use information from each of the one or more other wind turbine generators for the associated different wind directions. 13. A method of controlling the first wind turbine generator in the wind power plant according to claim 12 , wherein the information to be exchanged between the first wind turbine generator and one or more other wind turbine generators comprises a signal comprising aerodynamic information and/or condition information. 14. A method of controlling the first wind turbine generator in the wind power plant according to claim 13 , wherein the condition information comprises information on one or more of the following states: disconnection of the wind power plant from the electrical grid; lightening; tripping of wind turbine generator; an extreme wind gust; a faulty sensor; and grid power characteristics. 15. A method of controlling the first wind turbine generator in the wind power plant according to claim 13 , wherein the aerodynamic information comprises information on one or more of the following: wind direction; wind speed; wind shear; wind turbulence; wind gust depth; and temperature. 16. A method of controlling the first wind turbine generator in the wind power plant according to claim 12 , wherein controlling the first wind turbine generator comprises: determining the present wind direction and the transfer value corresponding to the present wind direction; and multiplying the signal from the one or more other wind turbine generators with the transfer value for the present wind direction in order to render a signal for use in the control of the first wind turbine generator. 17. A method of controlling the first wind turbine generator in the wind power plant according to claim 16 , wherein the transfer value comprises information specific transfer values for specific types of information. 18. A method of controlling the first wind turbine generator in the wind power plant according to claim 12 , wherein the predetermined transfer relationship depends upon wind characteristics at the first wind turbine generator and/or at the one or more other wind turbine generators. 19. A method of controlling the first wind turbine generator in the wind power plant according to claim 12 , wherein the predetermined transfer relationship depends upon the terrain wherein the first wind turbine generator and/or one or more other wind turbine generator(s) is/are located. 20. A method of controlling the first wind turbine generator in the wind power plant according to claim 12 , wherein the method comprises storing the predetermined transfer relationship in a control unit of the first wind turbine generator or in a SCADA server accessible by the first wind turbine generator. 21. A method of controlling the first wind turbine generator in the wind power plant according to claim 12 , wherein the predetermined transfer relationship is determined before operation of the wind power plant and/or wherein the predetermined transfer relationship is updated periodically. 22. A method of controlling the first wind turbine generator in the wind power plant according to claim 12 , wherein the first wind turbine generator further is communicatively coupled to a meteor
Monitoring or testing of wind motors, e.g. diagnostics (testing during commissioning of wind motors F03D13/30) · CPC title
Controlling wind motors (supplying or distributing electrical power H02J, e.g. arrangements for adjusting, eliminating or compensating reactive power in networks H02J3/18; controlling electric generators H02P, e.g. arrangements for controlling electric generators for the purpose of obtaining a desired output H02P9/00) · CPC title
Cross-Sectional Technologies · mapped topic
characterised by the controller architecture, e.g. multiple processors or data communications · CPC title
Wind directions · CPC title