Resource-aware system, method and program product for managing request traffic based on a management policy

US9755989B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9755989-B2
Application numberUS-201414509333-A
CountryUS
Kind codeB2
Filing dateOct 8, 2014
Priority dateDec 10, 2002
Publication dateSep 5, 2017
Grant dateSep 5, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Under the present invention, the performance of a set of system resources is monitored in response to incoming request traffic. When a system resource is approaching an overload condition, a corrective action is identified and implemented. Overload thresholds for each system resource and appropriate corrective actions are contained within a management policy. Based on a performance history of the corrective actions, the management policy can be changed/revised.

First claim

Opening claim text (preview).

We claim: 1. A method for increasing the efficiency of a resource-aware system, the method comprising: handling request traffic, the handling including: receiving request traffic, monitoring a performance of a set of system resources in response to the request traffic, determining when at least one of the set of system resources is approaching an overload threshold based on a management policy defining the overload threshold for each one of the set of system resources and a corresponding corrective action for each one of the set of system resources, identifying in the management policy a corrective action to avoid crossing the overload threshold based on the at least one system resource that is approaching the overload threshold, determining whether the identified corrective action previously had been unsuccessful in avoiding crossing of the overload threshold, on condition that the identified corrective action has been successful, implementing the identified corrective action so as to avoid crossing the overload threshold and, on condition that the identified corrective action has been unsuccessful, discarding the identified corrective action in favor of a different identified corrective action; recording a performance history of the corrective action; and, amending the management policy based on the performance history of the identified corrective action. 2. The method of claim 1 , wherein amending the management policy based on the performance history of the correction action comprises: identifying that the corrective action fails to avoid overloading; making a record that the corrective action fails to avoid overloading; and, changing the management policy to reflect the failure of the corrective action. 3. The method of claim 2 , wherein changing the management policy to reflect the failure of the corrective action comprises inserting a rule into the management policy. 4. The method of claim 2 , wherein changing the management policy to reflect the failure of the corrective action comprises eliminating the corrective action from the management policy. 5. The method of claim 1 , further comprising: continuously monitoring information received about the corrective action. 6. The method of claim 1 , further comprising: determining whether the corrective action was previously performed; determining whether the corrective action was successful upon determining that the corrective action was previously performed; and, forwarding information regarding whether the corrective action was successful. 7. A resource-aware system, comprising: a computer with memory and at least one processor; a planning system executing in the memory of the computer, the planning system handling request traffic, the handling including: receiving request traffic, monitoring a performance of a set of system resources in response to the request traffic, determining when at least one of the set of system resources is approaching an overload threshold based on a management policy defining the overload threshold for each one of the set of system resources and a corresponding corrective action for each one of the set of system resources, identifying in the management policy a corrective action to avoid crossing the overload threshold based on the at least one system resource that is approaching the overload threshold, determining whether the identified corrective action previously had been unsuccessful in avoiding crossing of the overload threshold, on condition that the identified corrective action has been successful, implementing the identified corrective action so as to avoid crossing the overload threshold and, on condition that the identified corrective action has been unsuccessful, discarding the identified corrective action in favor of a different identified corrective action; an analyzer system executing in the memory of the computer, the system comprising program code enabled upon execution in the memory of the computer to record a performance history of the identified corrective action; and, the program code of the planning system further amending the management policy based on the performance history of the identified corrective action. 8. The resource-aware system of claim 7 , wherein the planning system further comprises a learning system. 9. The resource-aware system of claim 7 , wherein program code of the planning system to amend the management policy based on the performance history of the correction action comprises program code: to identify that the corrective action fails to avoid overloading; to make a record that the corrective action fails to avoid overloading; and, to change the management policy to reflect the failure of the corrective action. 10. The resource-aware system of claim 9 , wherein program code of the planning system to change the management policy to reflect the failure of the corrective action comprises program code to insert a rule into the management policy. 11. The resource-aware system of claim 9 , wherein the program code of the planning system to change the management policy to reflect the failure of the corrective action comprises program code to eliminate the corrective action from the management policy. 12. The resource-aware system of claim 7 , wherein the planning system further comprises program code to continuously monitoring information received about the corrective action. 13. The resource-aware system of claim 7 , wherein the analyzer system further comprises program code: to determine whether the corrective action was previously performed by referencing a storage system; to determine whether the corrective action was successful upon determining that the corrective action was previously performed; and, to forward information regarding whether the corrective action was successful to the planning system. 14. A computer program product comprising a non-transitory computer usable storage device having stored therein computer usable program code for increasing the efficiency of a resource-aware system, the computer usable program code, which when executed by a computer hardware system causes the computer hardware system to perform: handling request traffic, the handling including: receiving request traffic, monitoring a performance of a set of system resources in response to the request traffic, determining when at least one of the set of system resources is approaching an overload threshold based on a management policy defining the overload threshold for each one of the set of system resources and a corresponding corrective action for each one of the set of system resources, identifying in the management policy a corrective action to avoid crossing the overload threshold based on the at least one system resource that is approaching the overload threshold, determining whether the identified corrective action previously had been unsuccessful in avoiding crossing of the overload threshold, on condition that the identified corrective action has been successful, implementing the identified corrective action so as to avoid crossing the overload threshold and, on condition that the identified corrective action has been unsuccessful, discarding the identified corrective action in favor of a different identified corrective action; recording a performance history of the corrective action; and, amending the management policy based on the performance history of the identified corrective action. 15. The computer program product of claim 14 , wherein the computer usable program code for amending the management policy based on the performance history o

Assignees

Inventors

Classifications

  • H04L47/70Primary

    Admission control; Resource allocation · CPC title

  • Threshold monitoring · CPC title

  • Network analysis or design · CPC title

  • H04L43/00Primary

    Arrangements for monitoring or testing data switching networks · CPC title

  • by proactively reacting to service quality change, e.g. by reconfiguration after service quality degradation or upgrade · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9755989B2 cover?
Under the present invention, the performance of a set of system resources is monitored in response to incoming request traffic. When a system resource is approaching an overload condition, a corrective action is identified and implemented. Overload thresholds for each system resource and appropriate corrective actions are contained within a management policy. Based on a performance history of t…
Who is the assignee on this patent?
IBM
What technology area does this patent fall under?
Primary CPC classification H04L47/70. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Sep 05 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).