Roof support monitoring for longwall system

US9739148B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9739148-B2
Application numberUS-201514839581-A
CountryUS
Kind codeB2
Filing dateAug 28, 2015
Priority dateAug 28, 2014
Publication dateAug 22, 2017
Grant dateAug 22, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A monitoring device and method for monitoring a longwall mining system having a plurality of roof supports, each roof support including a pressure sensor to determine pressure levels of the roof support during a monitoring cycle. Pressure data is obtained for the plurality of roof supports. The pressure data includes pressure information for each roof support of the plurality of roof supports over a monitoring cycle. The pressure data is analyzed to determine, for each roof support, whether a first type pressure failure occurred during the monitoring cycle. A fault quantity is generated that represents the number of roof supports determined to have had the first type of pressure failure occur during the monitoring cycle. An alert is generated upon determining that the fault quantity exceeds an alert threshold.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of monitoring a plurality of roof supports of a longwall mining system, the method comprising: obtaining, by a processor, pressure data for the plurality of roof supports, the pressure data including pressure information for each roof support of the plurality of roof supports over a monitoring cycle; analyzing the pressure data, by the processor, to determine whether, for each roof support, a first type of pressure failure occurred during the monitoring cycle; generating a fault quantity representing a number of roof supports determined to have had the first type of pressure failure occur during the monitoring cycle; and generating an alert upon determining that the fault quantity exceeds an alert threshold. 2. The method of claim 1 , wherein the first type of pressure failure indicates that a particular roof support failed to achieve set pressure within a first predetermined amount of time. 3. The method of claim 1 , wherein the first type of pressure failure indicates that a particular roof support failed to achieve high set pressure within a first predetermined amount of time. 4. The method of claim 1 , further comprising: analyzing the pressure data, by the processor, to determine whether, for each roof support, a second type of pressure failure occurred during the monitoring cycle; generating a second fault quantity representing the number of roof supports determined to have had the second type of pressure failure occur during the monitoring cycle; and generating a second alert upon determining that the second fault quantity exceeds a second alert threshold. 5. The method of claim 4 , wherein the first type of pressure failure indicates that a particular roof support failed to achieve set pressure within a first predetermined amount of time, and wherein the second type of pressure failure indicates that a particular roof support failed to achieve high set pressure within a second predetermined amount of time. 6. The method of claim 5 , wherein the second predetermined amount of time is greater than the first predetermined amount of time. 7. The method of claim 1 , wherein the alert threshold is a value greater than four percent (4%) and less than twenty five percent (25%) of plurality of roof supports. 8. The method of claim 1 , wherein the fault quantity represents the number of roof supports determined to have the first type of pressure failure and that are consecutively positioned. 9. The method of claim 1 , wherein the fault quantity represents a total number of roof supports, consecutive and nonconsecutive, determined to have the first type of pressure failure, the method further comprising: generating a consecutive fault quantity representing a number of consecutive roof supports determined to have the first type of pressure failure; and generating an alert upon determining that the consecutive fault quantity exceeds a second alert threshold, and wherein the second alert threshold is less than the alert threshold. 10. The method of claim 1 , wherein the monitoring cycle is one selected from a group comprising of a predetermined time period and a period defined in relation to a shear cycle. 11. The method of claim 1 , further comprising executing the steps of obtaining pressure data, analyzing the pressure data, generating a fault quantity, and generating an alert for subsequent monitoring cycles. 12. A monitoring device for a longwall mining system having a plurality of roof supports, each roof support including a pressure sensor to determine pressure levels of the roof support during a monitoring cycle, the monitoring device comprising: a monitoring module implemented on a processor in communication with the plurality of roof supports to receive pressure data including the determined pressure levels, the processor including: an analysis module configured to analyze the pressure data and to determine whether, for each roof support, a first type of pressure failure occurred during the monitoring cycle; a tally module configured to generate a fault quantity representing a number of roof supports determined to have had the first type of pressure failure occur during the monitoring cycle; and an alert module configured to generate an alert upon determining that the fault quantity exceeds an alert threshold. 13. The monitoring device of claim 12 , further comprising: a set pressure hydraulic line providing set pressure, wherein the plurality of roof supports are coupled to the set pressure hydraulic line in daisy-chain arrangement, and wherein the first type of pressure failure indicates that a particular roof support failed to achieve set pressure within a first predetermined amount of time. 14. The monitoring device of claim 12 , further comprising: a high set pressure hydraulic line providing high set pressure, wherein the plurality of roof supports are coupled to the high set pressure hydraulic line in daisy-chain arrangement, and wherein the first type of pressure failure indicates that a particular roof support failed to achieve high set pressure within a first predetermined amount of time. 15. The monitoring device of claim 12 , wherein the longwall mining system includes a set pressure hydraulic line providing set pressure to the plurality of roof supports; and a high set pressure hydraulic line providing high set pressure to the plurality of roof supports. 16. The monitoring device of claim 15 , wherein the first type of pressure failure indicates that a particular roof support failed to achieve set pressure within a first predetermined amount of time, and wherein the second type of pressure failure indicates that a particular roof support failed to achieve high set pressure within a second predetermined amount of time. 17. The monitoring device of claim 16 , wherein the second predetermined amount of time is greater than the first predetermined amount of time. 18. The monitoring device of claim 12 , wherein the alert threshold is a value greater than four percent (4%) and less than twenty five percent (25%) of plurality of roof supports. 19. The monitoring device of claim 12 , wherein the fault quantity represents the number of roof supports determined to have the first type of pressure failure and that are consecutively positioned. 20. The monitoring device of claim 12 , wherein the fault quantity represents a total number of roof supports, consecutive and nonconsecutive, determined to have the first type of pressure failure, the method further comprising: generating a consecutive fault quantity representing a number of consecutive roof supports determined to have the first type of pressure failure; and generating an alert upon determining that the consecutive fault quantity exceeds a second alert threshold, and wherein the second alert threshold is less than the alert threshold.

Assignees

Inventors

Classifications

  • Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor ({transport of mine roof support units E21F13/008; } shifting of mine conveyors at the working face E21F13/08) · CPC title

  • with load-measuring devices; with alarm devices · CPC title

  • Methods of underground mining (winning machines therefor E21C25/00 - E21C39/00); Layouts therefor · CPC title

  • Pivoted cantilever extensions therefor · CPC title

  • Control, e.g. using remote control (E21D23/16 takes precedence) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9739148B2 cover?
A monitoring device and method for monitoring a longwall mining system having a plurality of roof supports, each roof support including a pressure sensor to determine pressure levels of the roof support during a monitoring cycle. Pressure data is obtained for the plurality of roof supports. The pressure data includes pressure information for each roof support of the plurality of roof supports o…
Who is the assignee on this patent?
Joy Mm Delaware Inc
What technology area does this patent fall under?
Primary CPC classification E21C35/08. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Aug 22 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).