Conveyor speed control

US9738455B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9738455-B2
Application numberUS-201414298165-A
CountryUS
Kind codeB2
Filing dateJun 6, 2014
Priority dateJun 7, 2013
Publication dateAug 22, 2017
Grant dateAug 22, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Systems, methods, devices, and non-transitory processor readable media of the various embodiments enable intelligent speed control of conveyors (e.g., singulator conveyors, sortation conveyors, etc.) in a material handling system.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for operating a material handling system including a conveyor system, comprising: determining whether a material handling system state input meets a speed change requirement for the conveyor system; determining a new speed for the conveyor system in response to determining the material handling system state input meets the speed change requirement for the conveyor system; and operating the conveyor system at the new speed, wherein: the conveyor system is a sortation system; and determining whether a material handling system state input meets a speed change requirement for the conveyor system comprises: determining a maximum throughput value of the sortation system at a first run rate; monitoring an actual throughput value of the sortation system at the first run rate; comparing a ratio of the actual throughput value to the maximum throughput value with a first threshold; and determining the material handling system state input meets the speed change requirement in response to the ratio being greater than the first threshold. 2. The method of claim 1 , further comprising: comparing the ratio with a second threshold that is lower than the first threshold; and determining the material handling system state input meets the speed change requirement in response to the ratio being less than the second threshold, wherein determining a new speed for the conveyor system in response to determining the material handling system state input meets the speed change requirement for the conveyor system comprises: determining a new speed for the sortation system that is greater than the first run rate in response to the ratio being greater than the first threshold; and determining a new speed for the sortation system that is less than the first run rate in response to the ratio being less than the second threshold. 3. The method of claim 1 , wherein monitoring an actual throughput value of the sortation system at the first run rate comprises monitoring the actual throughput value of the sortation system at the first run rate for a time period greater than one minute. 4. The method of claim 1 , wherein the material handling system state input is selected from the group consisting of a labor input, a current work input, an estimated completion time, a work characteristic, and an electric pricing period. 5. A material handling system comprising: a conveyor system; and a controller, comprising: an interface in communication with the conveyor system; and a processor coupled to the interface, wherein the processor is configured with processor-executable instructions to perform operations comprising: determining whether a material handling system state input meets a speed change requirement for the conveyor system; determining a new speed for the conveyor system in response to determining the material handling system state input meets the speed change requirement for the conveyor system; and operating the conveyor system at the new speed, wherein: the conveyor system is a sortation system; and the processor is configured with processor-executable instructions to perform operations such that: determining whether a material handling system state input meets a speed change requirement for the conveyor system comprises: determining a maximum throughout value of the sortation system at a first run rate; monitoring an actual throughput value of the sortation system at the first run rate; comparing a ratio of the actual throughput value to the maximum throughput value with a first threshold; and determining the material handling system state input meets the speed change requirement in response to the ratio being greater than the first threshold. 6. The material handling system of claim 5 , wherein: the processor is configured with processor-executable instructions to perform operations further comprising: comparing the ratio with a second threshold that is lower than the first threshold; and determining the material handling system state input meets the speed change requirement in response to the ratio being less than the second threshold; and the processor is configured with processor-executable instructions to perform operations such that determining a new speed for the conveyor system in response to determining the material handling system state input meets the speed change requirement for the conveyor system comprises: determining a new speed for the sortation system that is greater than the first run rate in response to the ratio being greater than the first threshold; and determining a new speed for the sortation system that is less than the first run rate in response to the ratio being less than the second threshold. 7. The material handling system of claim 5 , wherein the processor is configured with processor-executable instructions to perform operations such that monitoring an actual throughput value of the sortation system at the first run rate comprises monitoring the actual throughput value of the sortation system at the first run rate for a time period greater than one minute. 8. The material handling system of claim 5 , wherein: the conveyor system is a sortation system; and the processor is configured with processor-executable instructions to perform operations such that: determining whether a material handling system state input meets a speed change requirement for the conveyor system comprises: monitoring an unavailability value of aftersort destinations of the sortation system; and determining the material handling system state input meets the speed change requirement in response to the unavailability value exceeding a first recirculation threshold or a second recirculation threshold; and determining a new speed for the conveyor system in response to determining the material handling system state input meets the speed change requirement for the conveyor system comprises: determining a new speed for the sortation system that is less than a current speed in response to the unavailability value exceeding the first recirculation threshold; and reducing indications to the sortation system in response to the unavailability value exceeding the second recirculation threshold. 9. The material handling system of claim 5 , wherein the processor is configured with processor-executable instructions to perform operations such that the material handling system state input is selected from the group consisting of a labor input, a current work input, an estimated completion time, a work characteristic, and an electric pricing period. 10. A non-transitory processor readable medium having stored thereon processor-executable instructions configured to cause a processor to perform operations comprising: determining whether a material handling system state input meets a speed change requirement for a conveyor system; determining a new speed for the conveyor system in response to determining the material handling system state input meets the speed change requirement for the conveyor system; and operating the conveyor system at the new speed, wherein the stored processor-executable instructions are configured to cause a processor to perform operations such that: the conveyor system is a sortation system; and determining whether a material handling system state input meets a speed change requirement for the conveyor system comprises: determining a maximum throughput value of the sortation system at a first run rate; monitoring an actual throughput value of the sortation system at the first run rate; comparing a ratio of the actual throughput value to the maximum throughput value with a first threshold; and determining the material handling system

Assignees

Inventors

Classifications

  • B65G43/08Primary

    Control devices operated by article or material being fed, conveyed or discharged {(and controlling the discharging devices B65G47/42)} · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9738455B2 cover?
Systems, methods, devices, and non-transitory processor readable media of the various embodiments enable intelligent speed control of conveyors (e.g., singulator conveyors, sortation conveyors, etc.) in a material handling system.
Who is the assignee on this patent?
Intelligrated Headquarters Llc
What technology area does this patent fall under?
Primary CPC classification B65G43/08. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Aug 22 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).