Drilling system having slot for underwater storage of BOP assembly
US-9399891-B2 · Jul 26, 2016 · US
US9732565B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9732565-B2 |
| Application number | US-201515123530-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 2, 2015 |
| Priority date | Mar 3, 2014 |
| Publication date | Aug 15, 2017 |
| Grant date | Aug 15, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for riser string handling on an offshore drilling vessel, the offshore drilling vessel including a multiple firing line hoist system, a riser tensioner system arranged in the second firing line, and a suspended riser transfer device. The method including the steps of lowering a riser string in the first firing line, and simultaneously assembling and preparing a riser tensioner system in the second firing line, wherein the riser hang-off assembly displaces the riser string, leaving the top end of the riser string exposed, from the first firing line to the second firing line to be connected to the riser tensioner system.
Opening claim text (preview).
The invention claimed is: 1. A method for riser string handling on an offshore drilling vessel, the offshore drilling vessel comprising: a hull having a moonpool extending through the hull; a multiple firing line hoist system mounted on the hull at said moonpool, the multiple firing line hoist system comprising: a tower having a top side and a base connected to the hull of the drilling vessel; a first hoisting device supported by the tower and having a first load attachment device displaceable along a first firing line, which extends essentially parallel to the tower; the first hoisting device being adapted to build and lower a riser string in the first firing line; a second hoisting device supported by the tower and having a second load attachment device displaceable along a second firing line, which extends essentially parallel to the tower; wherein a rotary drilling drive is provided in the second firing line, being adapted to assemble and disassemble a drill string and effect drilling in the second firing line; a riser tensioner system arranged in the second firing line, adapted to be connected to a top end of the riser string, in order to suspend the riser string from in the second firing line; a suspended riser transfer device, comprising: a riser hang-off assembly being actuable between an open configuration in which the riser hang-off assembly is adapted to move around an upper end of the riser string, and a closed configuration in which the riser hang-off assembly engages and supports the riser string, leaving the top end of the riser string exposed to allow for connection to the riser tensioner system; a frame with a gimbal device, to which the riser hang-off assembly is mounted; and rails extending in a longitudinal direction along the moonpool between the first firing line and the second firing line, allowing to displace the frame in a suspended riser transfer path in a longitudinal direction of the moonpool while the riser string is supported by the gimbal device, wherein a first parking position for the frame of the suspended riser transfer device of the offshore drilling vessel is provided in the vicinity of the first firing line, in a direction opposed to the second firing line, and wherein the rails of the suspended riser transfer device extend beyond the first firing line to the first parking position, wherein a second parking position for the frame of the suspended riser transfer device of the offshore drilling vessel is provided in the vicinity of the second firing line, in a direction opposed to the first firing line, and wherein the rails of the suspended riser transfer device extend beyond the second firing line to the second parking position, and wherein the suspended riser transfer device of the offshore drilling vessel further comprises: a second riser hang-off assembly being actuable between an open configuration in which the second riser hang-off assembly is adapted to move around an upper end of a second riser string of interconnected risers, and a closed configuration in which the riser hang-off assembly engages and supports the second riser string, leaving a top end of the second riser string exposed to allow for connection to the riser tensioner system; a second gimbal device, to which the second riser hang-off assembly is mounted, and a second frame supporting both the second riser hang-off assembly and the second gimbal device, the method comprising the following steps: a) building and lowering the riser string in the first firing line, and simultaneously assembling and preparing the riser tensioner system in the second firing line; b) suspending the riser string from the first load attachment device; c) positioning the riser hang-off assembly in the open configuration in the first firing line; d) positioning the upper end of the riser string in the riser hang-off assembly and actuating the riser hang-off assembly to the closed configuration; e) transferring the weight of the riser string from the first load attachment device to the riser hang-off assembly; f) disconnecting the first load attachment device from the riser string; g) displacing the riser hang-off assembly in the suspended riser transfer path while the riser hang-off assembly supports the riser string in the gimbal device from the first firing line to the second firing line; h) connecting the top end of the riser string to the riser tensioner system; i) transferring the weight of the riser string from the riser hang-off assembly to the riser tensioner system; j) actuating the riser hang-off assembly to the open configuration and thus disconnecting the riser hang-off assembly from the riser string; and k) displacing the riser hang-off assembly in the suspended riser transfer path from the second firing line to the first firing line. 2. The method according to claim 1 , wherein the riser tensioner system of the offshore drilling vessel comprises: a riser tensioner ring; riser tensioners connected to the vessel and supporting the riser tensioner ring in the second firing line; a telescopic joint comprising an inner barrel and an outer barrel with a seal therebetween, wherein the riser tensioner ring is adapted to be connected to a top of the outer barrel; and a landing joint, and wherein in the second firing line a clamp for the telescopic joint is provided above the riser tensioner ring, and wherein the method further comprises the following steps: i. positioning the riser tensioner ring in the second firing line above the suspended riser transfer path; ii. positioning the telescopic joint in the clamp in the second firing line; iii. connecting the landing joint to the second load attachment device and the telescopic joint; iv. lifting the telescopic joint with the landing joint by the second hoisting device to a level above the suspended riser transfer device, allowing the telescopic joint to be connected to the exposed top end of the riser string; v. displacing the riser hang-off assembly in the suspended riser transfer path while the riser hang-off assembly supports the riser string in the gimbal device from the first firing line to the second firing line; vi. lowering the telescopic joint with the landing joint by the second hoisting device and connecting the top end of riser string to the lower end of the outer barrel of the telescopic joint; vii. transferring the weight of the riser string from the riser hang-off assembly to the telescopic joint; viii. actuating the riser hang-off assembly to the open configuration and thus disconnecting the riser hang-off assembly from the riser string; ix. displacing the riser hang-off assembly from the second firing line to the first firing line in the suspended riser transfer path; x. further lowering the telescopic joint with the landing joint by the second hoisting device and connecting the riser tensioner ring to the top of the outer barrel of the telescopic joint; xi. further lowering the telescopic joint with the landing joint by the second hoisting device until the weight of the telescopic joint and suspended riser is supported by the riser tensioners; xii. raising the inner barrel of the telescopic joint with the landing joint by the second hoisting device; and xiii. disconnecting the landing joint from the second load attachment device and from the telescopic joint. 3. The method according to claim 1 , wherein the hull of the offshore drilling vessel is a monohull with a bow and a stern, wherein an accommodation topside having crew quarters and a bridge is arranged on the hull at the bow, and wherein a main deck extends between the accommodation topside and the stern of the vessel. 4. The method according to claim 1 , wherein the offshore drilling vessel is a semi-submersible having a deck box structure support by legs on parallel
specially adapted for underwater drilling · CPC title
Semi-submersibles; Small waterline area multiple hull vessels and the like, e.g. SWATH · CPC title
with flexible drawing means, e.g. cables · CPC title
specially adapted for drilling underwater formations from a floating support using heave compensators supporting the drill string · CPC title
from floating support with independent underwater anchored guide base · CPC title