Implementing performance-dependent transfer or execution decisions from service emulation indications
US-9378108-B2 · Jun 28, 2016 · US
US9729421B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9729421-B2 |
| Application number | US-201514667798-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 25, 2015 |
| Priority date | Mar 25, 2015 |
| Publication date | Aug 8, 2017 |
| Grant date | Aug 8, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method and system for outcome-based adjustment of a software-defined environment (SDE) that includes establishing a link between a business outcome and a first resource configuration from software defined environment, establishing a monitoring mechanism for continuously measuring a current state of the SDE, using a behavior model of the SDE to anticipate, or forecast, a triggering event, and responsive to the forecast of a triggering event, using the behavior model to determine a second resource configuration to achieve the business outcome. The link includes at least one of a utility of services for the business outcome, a cost of a set of resources consumed by the first resource configuration, and a risk of the set of resources becoming unavailable.
Opening claim text (preview).
What is claimed is: 1. A method comprising: determining a business operation and a corresponding set of tasks to be performed in a software defined environment (SDE); establishing a first resource configuration to perform the corresponding set of tasks to achieve a business outcome target; determining a first resource cost for performing the corresponding set of tasks; monitoring the SDE to identify a triggering event; responsive to identifying the triggering event, establishing a second resource configuration to address the triggering event; and determining a second resource cost for performing the corresponding set of tasks according to the second resource configuration; wherein: at least the monitoring and establishing a second resource configuration steps are performed by computer software running on computer hardware; the step of establishing the second resource configuration includes evaluating a set of “what-if” scenarios where a set of multiple resource configurations are applied to a behavior model of the SDE to identify a best alternative to the first resource configuration, the best alternative being the second resource configuration. 2. The method of claim 1 , further comprising: assigning a priority level to tasks within the corresponding set of tasks; determining a set of performance indicators corresponding to a task having a first priority level; wherein: the step of establishing the second resource configuration is based, at least in part, on a performance level of a performance indicator in the set of performance indicators. 3. The method of claim 1 , wherein addressing the triggering event includes one of scaling up a resource in the first resource configuration for performing a task in the corresponding set of tasks, scaling down a resource in the first resource configuration for performing a task in the corresponding set of tasks, migrating a task of the corresponding set of tasks, re-building a task of the corresponding set of tasks, and re-building the business operation.
using virtualisation of network functions or resources, e.g. SDN or NFV entities · CPC title
for predicting network behaviour · CPC title
using software, i.e. software packages (network security related monitoring H04L63/1408) · CPC title
Risk analysis of enterprise or organisation activities · CPC title
using network fault recovery (ring fault isolation or reconfiguration in loop networks without recovery actions by a network management system H04L12/437) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.