Outcome-based software-defined infrastructure

US9729421B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9729421-B2
Application numberUS-201514667798-A
CountryUS
Kind codeB2
Filing dateMar 25, 2015
Priority dateMar 25, 2015
Publication dateAug 8, 2017
Grant dateAug 8, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method and system for outcome-based adjustment of a software-defined environment (SDE) that includes establishing a link between a business outcome and a first resource configuration from software defined environment, establishing a monitoring mechanism for continuously measuring a current state of the SDE, using a behavior model of the SDE to anticipate, or forecast, a triggering event, and responsive to the forecast of a triggering event, using the behavior model to determine a second resource configuration to achieve the business outcome. The link includes at least one of a utility of services for the business outcome, a cost of a set of resources consumed by the first resource configuration, and a risk of the set of resources becoming unavailable.

First claim

Opening claim text (preview).

What is claimed is: 1. A method comprising: determining a business operation and a corresponding set of tasks to be performed in a software defined environment (SDE); establishing a first resource configuration to perform the corresponding set of tasks to achieve a business outcome target; determining a first resource cost for performing the corresponding set of tasks; monitoring the SDE to identify a triggering event; responsive to identifying the triggering event, establishing a second resource configuration to address the triggering event; and determining a second resource cost for performing the corresponding set of tasks according to the second resource configuration; wherein: at least the monitoring and establishing a second resource configuration steps are performed by computer software running on computer hardware; the step of establishing the second resource configuration includes evaluating a set of “what-if” scenarios where a set of multiple resource configurations are applied to a behavior model of the SDE to identify a best alternative to the first resource configuration, the best alternative being the second resource configuration. 2. The method of claim 1 , further comprising: assigning a priority level to tasks within the corresponding set of tasks; determining a set of performance indicators corresponding to a task having a first priority level; wherein: the step of establishing the second resource configuration is based, at least in part, on a performance level of a performance indicator in the set of performance indicators. 3. The method of claim 1 , wherein addressing the triggering event includes one of scaling up a resource in the first resource configuration for performing a task in the corresponding set of tasks, scaling down a resource in the first resource configuration for performing a task in the corresponding set of tasks, migrating a task of the corresponding set of tasks, re-building a task of the corresponding set of tasks, and re-building the business operation.

Assignees

Inventors

Classifications

  • using virtualisation of network functions or resources, e.g. SDN or NFV entities · CPC title

  • H04L41/147Primary

    for predicting network behaviour · CPC title

  • H04L43/14Primary

    using software, i.e. software packages (network security related monitoring H04L63/1408) · CPC title

  • Risk analysis of enterprise or organisation activities · CPC title

  • using network fault recovery (ring fault isolation or reconfiguration in loop networks without recovery actions by a network management system H04L12/437) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9729421B2 cover?
A method and system for outcome-based adjustment of a software-defined environment (SDE) that includes establishing a link between a business outcome and a first resource configuration from software defined environment, establishing a monitoring mechanism for continuously measuring a current state of the SDE, using a behavior model of the SDE to anticipate, or forecast, a triggering event, and …
Who is the assignee on this patent?
IBM
What technology area does this patent fall under?
Primary CPC classification H04L41/147. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Aug 08 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).