Real-time crop processing management

US9710771B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9710771-B2
Application numberUS-201414176967-A
CountryUS
Kind codeB2
Filing dateFeb 10, 2014
Priority dateFeb 10, 2014
Publication dateJul 18, 2017
Grant dateJul 18, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A real-time crop processing management system is disclosed. In one embodiment, a yield description of a load of harvested crop and a location of the load of harvested crop is received at a computer system. An indication of the capacity to process the load of harvested crop by a receiving facility is also received by the computer system. A message conveying a delivery assignment for the load of harvested crop is then generated by the computer system.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for managing crop processing in real-time, the method comprising: receiving, by a computing device and via a wireless communication network, a yield description of a load of harvested crop, wherein the yield description includes one or more of a volume of harvested crop, a weight of harvested crop, a moisture content of harvested crop, a harvest time of harvested crop, a condition of harvested crop, or a constituent content of harvested crop, and wherein receiving the yield description occurs prior to the load of harvested crop arriving at a receiving facility; receiving, by the computing device, a location of the load of harvested crop while the harvested crop is en-route to a receiving facility of a plurality of receiving facilities; receiving, by the computing device, one or more processing capacity messages providing indications of abilities of the plurality of receiving facilities to timely process the load of harvested crop, wherein the processing capacity messages identify an amount of crop received at the receiving facility and a priority order for processing the received amount of crop; determining, by the computing device and using the processing capacity messages, that a processing capacity of a most proximal receiving facility of the plurality of receiving facilities is insufficient to timely process the load of harvested crop, wherein the most proximal receiving facility is closest in proximity to the location of the load of harvested crop; generating, by the computing device, a delivery assignment for the load of harvested crop using the yield description, the location, and the one or more processing capacity messages, wherein generating includes identifying that a particular receiving facility of the plurality of receiving facilities has a sufficient capacity to timely process the harvested crop to facilitate reducing spoilage or loss of the load of harvested crop, wherein the delivery assignment identifies the particular receiving facility, and wherein the particular receiving facility is different from the most proximal receiving facility; generating, by the computing device, a delivery assignment message including the delivery assignment for the load of harvested crop; transmitting, by the computing device, the delivery assignment message for receipt by one or more of: the particular receiving facility and the wireless communication network for conveying the delivery assignment message to a reporting component associated with the load of harvested crop; generating, by the computing device, a queue assignment for the load of harvested crop at the particular receiving facility based on a time-sensitivity for processing the load of harvested crop, wherein the queue assignment corresponds to a processing number in a processing queue of the particular receiving facility, wherein the processing queue identifies an order for which crops assigned to the queue are to be processed, and wherein the queue assignment indicates that the load of harvested crop is to be queued at the front of the processing queue in order for the harvested crop to be processed before a processing deadline; monitoring, by the computing device, the location of the load of harvested crop within the particular receiving facility in order to identify progress in processing of the load of harvested crop; determining, by the computing device, that the load of harvested crop is approaching the processing deadline; and generating, by the computing device, an alert, wherein the alert indicates the processing deadline or wherein the alert indicates that the load of harvested crop is to be prioritized. 2. The method of claim 1 , further comprising: processing, by the particular processing facility, the load of harvested crop prior to the processing deadline. 3. The method of claim 1 , wherein generating the delivery assignment message comprises generating a harvesting schedule for the crop using the one or more processing capacity messages, wherein the harvesting schedule includes instructions to slow down or cease harvesting operations; and wherein transmitting the delivery assignment message includes transmitting the harvesting schedule to the wireless communication network. 4. The method of claim 3 , further comprising: downloading a software interface from a software interface downloader of the computing device to a mobile computing device; and conveying the delivery assignment to the software interface. 5. The method of claim 3 , further comprising: slowing down or ceasing, by a harvester machine, harvesting operations according to the harvesting schedule. 6. The method of claim 1 , further comprising: receiving, by the computing device and from the particular receiving facility, a received crop report, wherein the received crop report identifies one or more of an indicator that the load of harvested crop has arrived at the particular receiving facility, a time that the load of harvested crop arrived at the particular receiving facility, a weight of the load of harvested crop that has arrived at the particular receiving facility, a moisture content of the load of harvested crop that has arrived at the particular receiving facility, and a condition of the load of harvested crop that has arrived at the particular receiving facility. 7. The method of claim 6 , further comprising: identifying, by the computing device, a discrepancy between the yield description and the received crop report; and generating an indication of the discrepancy. 8. A non-transitory computer-readable storage medium comprising computer executable code for directing a processor to execute operations comprising: receiving, at a computer system comprising the processor and via a wireless communication network, a yield description of a load of harvested crop, wherein the yield description includes one or more of a volume of harvested crop, a weight of harvested crop, a moisture content of harvested crop, a harvest time of harvested crop, a condition of harvested crop, or a constituent content of harvested crop, and wherein receiving the yield description occurs prior to the load of harvested crop arriving at a receiving facility; receiving, by the computer system, a location of the load of harvested crop while the harvested crop is en-route to a receiving facility of a plurality of receiving facilities; receiving, by the computer system, one or more processing capacity messages providing indications of abilities of the plurality of receiving facilities to timely process the load of harvested crop, wherein the processing capacity messages identify an amount of crop received at the receiving facility and a priority order for processing the received amount of crop; determining, by the computer system and using the processing capacity messages, that a processing capacity of a most proximal receiving facility of the plurality of receiving facilities is insufficient to timely process the load of harvested crop, wherein the most proximal receiving facility is closest in proximity to the location of the load of harvested crop; generating, by the computer system, a delivery assignment for the load of harvested crop using the yield description, the location, and the one or more processing capacity messages, wherein generating includes identifying that a particular receiving facility of the plurality of receiving facilities has a sufficient capacity to timely process the harvested crop to facilitate reducing spoilage or loss of the harvested crop, wherein the delivery assignment identifies the particular receiving facility, and wherein the particular receiving facility is different from the most proximal receiving facility; generating, by the computer system, a deli

Assignees

Inventors

Classifications

  • Agriculture; Fishing; Forestry; Mining · CPC title

  • Harvesting apparatus not provided for in other groups of this subclass · CPC title

  • Resource planning, allocation, distributing or scheduling for enterprises or organisations · CPC title

  • Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling · CPC title

  • Resource planning in a project environment · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9710771B2 cover?
A real-time crop processing management system is disclosed. In one embodiment, a yield description of a load of harvested crop and a location of the load of harvested crop is received at a computer system. An indication of the capacity to process the load of harvested crop by a receiving facility is also received by the computer system. A message conveying a delivery assignment for the load of …
Who is the assignee on this patent?
Trimble Navigation Ltd, Trimble Inc
What technology area does this patent fall under?
Primary CPC classification G06Q10/06312. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Jul 18 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).