Method and arrangement for swift power regulation

US9702343B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9702343-B2
Application numberUS-201314649865-A
CountryUS
Kind codeB2
Filing dateDec 4, 2013
Priority dateDec 14, 2012
Publication dateJul 11, 2017
Grant dateJul 11, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The present invention relates to a method for regulating a flow of power between a wind power facility and a power grid connected thereto. The method comprises the steps of determining whether power is to be delivered to or absorbed from the power grid, and at least partly disabling or at least partly enabling one or more power consuming auxiliary systems in response to said determination. Moreover, an arrangement for delivering additional power to a power grid is provided.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for regulating a flow of power between a wind power facility and a power grid connected thereto, the method comprising: determining whether power is to be delivered to or absorbed from the power grid, selecting one of a plurality of wind power facilities to deliver or absorb the power, wherein the selected wind power facility is operated at an essentially rated power level, determining, at the selected wind power facility whether to deny a request to deliver or absorb power based on whether one or more power consuming auxiliary systems on the selected wind power facility are capable of being enabled or disabled, and upon the selected wind power facility accepting the request, at least partly disabling or at least partly enabling the one or more power consuming auxiliary systems on the selected wind power facility to save power or consume power. 2. The method according to claim 1 , wherein additional power is to be delivered from the wind power facility to the power grid connected thereto, said additional power delivering process comprising: at least partly disabling one or more power consuming auxiliary systems of the selected wind power facility in order to save power, and delivering at least part of the saved power to the power grid as additional power. 3. The method according to claim 2 , further comprising disabling of one or more power consuming auxiliary systems of the selected wind power facility. 4. The method according to claim 3 , wherein all power consuming auxiliary systems of the selected wind power facility are disabled. 5. The method according to claim 3 , further comprising: determining the one or more power consuming auxiliary systems has been disabled for a maximum amount of time; and enabling the one or more power consuming auxiliary systems. 6. The method according to claim 1 , wherein power is to be absorbed by the wind power facility, said power absorbing process comprises at least partly enabling one or more power consuming auxiliary systems of the selected wind power facility in order to consume surplus power from the power grid. 7. The method according to claim 6 , wherein one or more power consuming auxiliary systems of the selected wind power facility are fully enabled. 8. The method according to claim 1 , wherein the wind power facility forms part of a wind power plant. 9. The method according to claim 8 , wherein a power plant controller disables the one or more power consuming auxiliary systems. 10. The method according to claim 9 , wherein the power plant controller selects the at least one of a plurality of wind turbines of the wind power plant in accordance with a predetermined procedure. 11. The method according to claim 9 , wherein the one or more power consuming auxiliary systems are disabled in accordance with a predetermined procedure. 12. The method according to claim 1 , wherein the request is denied upon the selected wind power facility determining no additional auxiliary systems are capable of being enabled or disabled. 13. A method for absorbing power from a power grid within a wind power facility connected thereto, the method comprising: determining whether power is to be absorbed from the power grid, selecting one of a plurality of wind power facilities to absorb the power, determining, at the selected wind power facility, whether to deny a request to absorb power based on whether one or more power consuming auxiliary systems on the selected wind power facility are capable of being enabled, and upon the selected wind power facility accepting the request, at least partly enabling the one or more power consuming auxiliary systems on the selected wind power facility to consume power. 14. The method according to claim 13 , wherein said power absorbing process comprises at least partly enabling one or more power consuming auxiliary systems of the selected wind power facility in order to consume surplus power from the power grid. 15. The method according to claim 14 , wherein one or more power consuming auxiliary systems of the selected wind power facility are fully enabled. 16. The method according to claim 15 , wherein all power consuming auxiliary systems of the selected wind power facility are enabled. 17. The method according to claim 13 , wherein the request is denied upon the selected wind power facility determining no additional auxiliary systems are capable of being enabled. 18. An arrangement for delivering additional power from a wind power facility to a power grid connected thereto, wherein the wind power facility is operated at an essentially rated power level, the arrangement comprising: a controller configured to: receive a request to deliver power to the grid, determine whether to deny a request to deliver power to the power grid based on whether one or more power consuming auxiliary systems on the wind power facility are capable of being disabled, and upon accepting the request to deliver power, at least partly disable the one or more power consuming auxiliary systems of the wind power facility on the selected wind power facility to save power. 19. The arrangement according to claim 18 , wherein the controller forms part of a wind turbine controller. 20. A wind power facility comprising an arrangement according to claim 18 . 21. The arrangement according to claim 18 , further comprising a power plant controller configured to: select one of a plurality of wind power facilities to deliver the power, and at least partly disable the one or more power consuming auxiliary systems. 22. The system according to claim 18 , wherein the request is denied upon the selected wind power facility determining no additional auxiliary systems are capable of being disabled.

Assignees

Inventors

Classifications

  • F03D7/0284Primary

    in relation to the state of the electric grid · CPC title

  • Cross-Sectional Technologies · mapped topic

  • controlling wind farms · CPC title

  • the wind motor being part of a wind farm · CPC title

  • electrical actuators · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9702343B2 cover?
The present invention relates to a method for regulating a flow of power between a wind power facility and a power grid connected thereto. The method comprises the steps of determining whether power is to be delivered to or absorbed from the power grid, and at least partly disabling or at least partly enabling one or more power consuming auxiliary systems in response to said determination. More…
Who is the assignee on this patent?
Vestas Wind Sys As
What technology area does this patent fall under?
Primary CPC classification F03D7/0284. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Jul 11 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?